From Wikipedia, the free encyclopedia

Yinchuan–Lanzhou high-speed railway
Overview
Native nameé“¶ć…°ćźąèżäž“çșż
StatusOperational
Owner China Railway
Locale Ningxia and Gansu
Termini
Stations7
Service
Type High-speed rail
Operator(s) China Railway Lanzhou Group
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Yinchuan–Lanzhou high-speed railway
(reserved)

Yinchuan–Lanzhou high-speed railway is a high-speed railway in China between Lanzhou, the capital of Gansu province, and Zhongwei in Ningxia. [1] Construction started in 2017 and completed on 29 December 2022. [2] The section between Zhongchuan Airport and Lanzhou West is the already completed Lanzhou-Zhongchuan Airport Intercity Railway. This section will also be shared with the Lanzhou–Zhangye intercity railway.

History

The line was built in two sections. A 207 kilometres (129 mi) section from Yinchuan to Zhongwei, opened on 29 December 2019. [3] The remaining section from Zhongwei to Lanzhou opened on 29 December 2022. [2]

References

  1. ^ äž­ć«è‡łć…°ć·žé«˜é€Ÿé“è·ŻćŒ€ć·„ć»șèźŸ. 19 June 2017.
  2. ^ a b "é“¶ć…°é«˜é“äž­ć…°æź”ćŒ€é€šèżè„". Archived from the original on 29 December 2022.
  3. ^ "ćźć€ç»“æŸæČĄæœ‰é«˜é€Ÿé“è·ŻćŽ†ćČ". www.chinanews.com. Retrieved 7 November 2020.


From Wikipedia, the free encyclopedia

Yinchuan–Lanzhou high-speed railway
Overview
Native nameé“¶ć…°ćźąèżäž“çșż
StatusOperational
Owner China Railway
Locale Ningxia and Gansu
Termini
Stations7
Service
Type High-speed rail
Operator(s) China Railway Lanzhou Group
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Yinchuan–Lanzhou high-speed railway
(reserved)

Yinchuan–Lanzhou high-speed railway is a high-speed railway in China between Lanzhou, the capital of Gansu province, and Zhongwei in Ningxia. [1] Construction started in 2017 and completed on 29 December 2022. [2] The section between Zhongchuan Airport and Lanzhou West is the already completed Lanzhou-Zhongchuan Airport Intercity Railway. This section will also be shared with the Lanzhou–Zhangye intercity railway.

History

The line was built in two sections. A 207 kilometres (129 mi) section from Yinchuan to Zhongwei, opened on 29 December 2019. [3] The remaining section from Zhongwei to Lanzhou opened on 29 December 2022. [2]

References

  1. ^ äž­ć«è‡łć…°ć·žé«˜é€Ÿé“è·ŻćŒ€ć·„ć»șèźŸ. 19 June 2017.
  2. ^ a b "é“¶ć…°é«˜é“äž­ć…°æź”ćŒ€é€šèżè„". Archived from the original on 29 December 2022.
  3. ^ "ćźć€ç»“æŸæČĄæœ‰é«˜é€Ÿé“è·ŻćŽ†ćČ". www.chinanews.com. Retrieved 7 November 2020.



Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook