GuiyangâNanning high-speed railway 莔ćé«ééè·Ż | |
---|---|
Overview | |
Status | Operational (GuiyangâLibo section) [1] |
Locale | Guizhou and Guangxi, China |
Termini | |
Service | |
Services | 1 |
Operator(s) | China Railway Chengdu Group & China Railway Nanning Group |
History | |
Opened | 8 August 2023 [1] |
Technical | |
Line length | 512 km (318 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The GuiyangâNanning high-speed railway is a high-speed railway between Guiyang and Nanning in China. The railway will be 512 km (318 mi) in length, of which 482 km (300 mi) is newly build. Travel time between the two cities will be cut from 10 hours to 2.5 hours. [2] It will be part of the Baotou (Yinchuan)âHainan corridor.
Construction on the railway began in 2018. The initial section from Guiyang to Libo opened on 8 August 2023. [1]
Station Name [3] | Chinese | Transfers / Connections | Location | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Guiyang North | 莔éłć |
![]() |
Guizhou | |||||||
Guiyang | èŽ”éł |
![]() | ||||||||
Longli North | éŸéć | |||||||||
Guidingxian | 莔ćźćż | |||||||||
Duyun East | éœćäž | |||||||||
Dushan East | çŹć±±äž | |||||||||
Libo | èæłą | |||||||||
Huanjiang | çŻæ± | |||||||||
Hechi West | æČłæ± è„ż | Guangxi | ||||||||
Yong'anzhen | æ°žćźé | |||||||||
Du'an | éœćź | |||||||||
Mashanxian | é©Źć±±ćż | |||||||||
Nanning North | ććźć | |||||||||
Nanning East | ććźäž | Nanning Metro: 1 |
GuiyangâNanning high-speed railway 莔ćé«ééè·Ż | |
---|---|
Overview | |
Status | Operational (GuiyangâLibo section) [1] |
Locale | Guizhou and Guangxi, China |
Termini | |
Service | |
Services | 1 |
Operator(s) | China Railway Chengdu Group & China Railway Nanning Group |
History | |
Opened | 8 August 2023 [1] |
Technical | |
Line length | 512 km (318 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The GuiyangâNanning high-speed railway is a high-speed railway between Guiyang and Nanning in China. The railway will be 512 km (318 mi) in length, of which 482 km (300 mi) is newly build. Travel time between the two cities will be cut from 10 hours to 2.5 hours. [2] It will be part of the Baotou (Yinchuan)âHainan corridor.
Construction on the railway began in 2018. The initial section from Guiyang to Libo opened on 8 August 2023. [1]
Station Name [3] | Chinese | Transfers / Connections | Location | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Guiyang North | 莔éłć |
![]() |
Guizhou | |||||||
Guiyang | èŽ”éł |
![]() | ||||||||
Longli North | éŸéć | |||||||||
Guidingxian | 莔ćźćż | |||||||||
Duyun East | éœćäž | |||||||||
Dushan East | çŹć±±äž | |||||||||
Libo | èæłą | |||||||||
Huanjiang | çŻæ± | |||||||||
Hechi West | æČłæ± è„ż | Guangxi | ||||||||
Yong'anzhen | æ°žćźé | |||||||||
Du'an | éœćź | |||||||||
Mashanxian | é©Źć±±ćż | |||||||||
Nanning North | ććźć | |||||||||
Nanning East | ććźäž | Nanning Metro: 1 |