From Wikipedia, the free encyclopedia
Nanchangā€“Jiujiang
high-speed railway
ę˜Œä¹é«˜é€Ÿé“č·Æ
Overview
StatusUnder construction
Termini
Stations5
Service
Operator(s) China Railway Nanchang Group
Technical
Line length134.4 km (83.5 mi) [1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Nanchangā€“Jiujiang high-speed railway is a high-speed railway currently under construction in Jiangxi Province, China. The railway will have a design speed of 350 kilometres per hour (220 mph). [1] It is part of the Beijingā€“Hong Kong (Taipei) corridor.

The line runs roughly parallel to the Nanchangā€“Jiujiang intercity railway, but on a faster 350 kilometres per hour (220 mph) alignment.

History

A feasibility study for the line was approved in February 2021. [2] Construction started on 21 November 2022. [1] It is expected to be completed by 2027. [1]

Stations

Station Name Chinese [3] Metro
transfers/connections
Nanchang East å—ę˜Œäøœ
Changbei Airport ę˜ŒåŒ—ęœŗåœŗ
Gongqingcheng East 共青城äøœ
Lushan South åŗå±±å—
Lushan åŗå±±

References

  1. ^ a b c d "ę˜Œä¹é«˜é“ē­‰3ę”é“č·Æ开巄å»ŗč®¾ļ¼". 2022-11-21. Archived from the original on 2022-11-22. Retrieved 2021-11-22.
  2. ^ "äŗ¬ęøÆé«˜é“ä¹ę±Ÿč‡³å—ę˜Œę®µčŽ·ę‰¹å¤ ę±Ÿč„æåˆå°†ę–°å¢žäø€ę”å—åŒ—čµ°å‘é«˜é“ēŗæč·Æ" [Beijing-Hong Kong high-speed railway Jiujiang to Nanchang section approved Jiangxi will add a new north-south high-speed rail line]. jx.ifeng.com (in Chinese). 24 February 2021. Retrieved 24 February 2021.
  3. ^ "ꖰå»ŗäŗ¬ęøÆ高速铁č·Æä¹ę±Ÿč‡³å—ę˜Œę®µļ¼ˆę˜Œä¹é«˜é“ļ¼‰åÆč”Œę€§ē ”ē©¶ęŠ„å‘ŠčŽ·ę‰¹å¤". 2021-02-23.
From Wikipedia, the free encyclopedia
Nanchangā€“Jiujiang
high-speed railway
ę˜Œä¹é«˜é€Ÿé“č·Æ
Overview
StatusUnder construction
Termini
Stations5
Service
Operator(s) China Railway Nanchang Group
Technical
Line length134.4 km (83.5 mi) [1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)

The Nanchangā€“Jiujiang high-speed railway is a high-speed railway currently under construction in Jiangxi Province, China. The railway will have a design speed of 350 kilometres per hour (220 mph). [1] It is part of the Beijingā€“Hong Kong (Taipei) corridor.

The line runs roughly parallel to the Nanchangā€“Jiujiang intercity railway, but on a faster 350 kilometres per hour (220 mph) alignment.

History

A feasibility study for the line was approved in February 2021. [2] Construction started on 21 November 2022. [1] It is expected to be completed by 2027. [1]

Stations

Station Name Chinese [3] Metro
transfers/connections
Nanchang East å—ę˜Œäøœ
Changbei Airport ę˜ŒåŒ—ęœŗåœŗ
Gongqingcheng East 共青城äøœ
Lushan South åŗå±±å—
Lushan åŗå±±

References

  1. ^ a b c d "ę˜Œä¹é«˜é“ē­‰3ę”é“č·Æ开巄å»ŗč®¾ļ¼". 2022-11-21. Archived from the original on 2022-11-22. Retrieved 2021-11-22.
  2. ^ "äŗ¬ęøÆé«˜é“ä¹ę±Ÿč‡³å—ę˜Œę®µčŽ·ę‰¹å¤ ę±Ÿč„æåˆå°†ę–°å¢žäø€ę”å—åŒ—čµ°å‘é«˜é“ēŗæč·Æ" [Beijing-Hong Kong high-speed railway Jiujiang to Nanchang section approved Jiangxi will add a new north-south high-speed rail line]. jx.ifeng.com (in Chinese). 24 February 2021. Retrieved 24 February 2021.
  3. ^ "ꖰå»ŗäŗ¬ęøÆ高速铁č·Æä¹ę±Ÿč‡³å—ę˜Œę®µļ¼ˆę˜Œä¹é«˜é“ļ¼‰åÆč”Œę€§ē ”ē©¶ęŠ„å‘ŠčŽ·ę‰¹å¤". 2021-02-23.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook