From Wikipedia, the free encyclopedia
Qianjiang–Changde railway
Overview
StatusOperational
Termini
Stations10
Service
Type Higher-speed rail, Heavy rail
Operator(s) China Railway Guangzhou Group
History
Opened26 December 2019
Technical
Line length336 km (209 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph) [1]

The Qianjiang–Changde railway is an electrified higher-speed railway in China.

History

Testing began on 14 October 2019. [2] The railway opened on 26 December. [3]

Stations

The line has the following passenger stations:

References

  1. ^ "黔张常é“路环评报告获国家环ä¿éƒ¨æ‰¹å¤ - æ¹–å—频é“". hn.rednet.cn. 14 August 2014. Retrieved 13 October 2020.
  2. ^ "黔张常é“路开å¯åŠ¨è½¦ç»„检测-æ¹–å—çœäººæ°‘政府门户网站". www.hunan.gov.cn. 15 October 2019. Retrieved 13 October 2020.
  3. ^ "黔张常é“路正å¼é€šè½¦_图片新闻_中国政府网". www.gov.cn. 26 December 2019. Retrieved 13 October 2020.


From Wikipedia, the free encyclopedia
Qianjiang–Changde railway
Overview
StatusOperational
Termini
Stations10
Service
Type Higher-speed rail, Heavy rail
Operator(s) China Railway Guangzhou Group
History
Opened26 December 2019
Technical
Line length336 km (209 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph) [1]

The Qianjiang–Changde railway is an electrified higher-speed railway in China.

History

Testing began on 14 October 2019. [2] The railway opened on 26 December. [3]

Stations

The line has the following passenger stations:

References

  1. ^ "黔张常é“路环评报告获国家环ä¿éƒ¨æ‰¹å¤ - æ¹–å—频é“". hn.rednet.cn. 14 August 2014. Retrieved 13 October 2020.
  2. ^ "黔张常é“路开å¯åŠ¨è½¦ç»„检测-æ¹–å—çœäººæ°‘政府门户网站". www.hunan.gov.cn. 15 October 2019. Retrieved 13 October 2020.
  3. ^ "黔张常é“路正å¼é€šè½¦_图片新闻_中国政府网". www.gov.cn. 26 December 2019. Retrieved 13 October 2020.



Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook