Qianjiang–Changde railway | |
---|---|
Overview | |
Status | Operational |
Termini | |
Stations | 10 |
Service | |
Type | Higher-speed rail, Heavy rail |
Operator(s) | China Railway Guangzhou Group |
History | |
Opened | 26 December 2019 |
Technical | |
Line length | 336 km (209 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 200 km/h (124 mph) [1] |
The Qianjiang–Changde railway is an electrified higher-speed railway in China.
Testing began on 14 October 2019. [2] The railway opened on 26 December. [3]
The line has the following passenger stations:
Qianjiang–Changde railway | |
---|---|
Overview | |
Status | Operational |
Termini | |
Stations | 10 |
Service | |
Type | Higher-speed rail, Heavy rail |
Operator(s) | China Railway Guangzhou Group |
History | |
Opened | 26 December 2019 |
Technical | |
Line length | 336 km (209 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 200 km/h (124 mph) [1] |
The Qianjiang–Changde railway is an electrified higher-speed railway in China.
Testing began on 14 October 2019. [2] The railway opened on 26 December. [3]
The line has the following passenger stations: