From Wikipedia, the free encyclopedia
Lianyungang–Xuzhou
high-speed railway
è¿žå¾å®¢è¿ä¸“线
Overview
StatusOperational
Termini
Stations6
Service
Operator(s) China Railway High-speed
History
Opened8 February 2021
Technical
Line length180 km (112 mi) [1]
Track gauge1,435 mm (4 ft 8+12 in)
Minimum radius7000 m
5500 m in difficult areas
Operating speed350 km/h (217 mph)
Route map

Xuzhou East
Houmazhuang
start of line
Daxu South
Pizhou East
Xinyi South│ Xinyi
Donghaixian
Dongji
Haizhou
Lianyungang

The Lianyungang–Xuzhou high-speed railway ( Chinese: è¿žå¾å®¢è¿ä¸“线) is a high-speed railway in China. The railway has a design speed of 350 kilometres per hour (220 mph). [2]

The railway runs parallel to the Longhai railway and interchanges with it at Lianyungang and Donghaixian. It is the eastern-most section of the Eurasia Continental Bridge corridor.

History

Construction began on 6 November 2016. [3] The railway, excluding Daxu South, opened on 8 February 2021. [1] [4]

Stations

References

  1. ^ a b "江è‹å¹²çº¿é“路完æˆé—­åˆ è¿žå¾é«˜é“2月8日开通è¿è¥". æ–°åŽç½‘. 2021-02-08. Archived from the original on February 8, 2021. Retrieved 2021-02-08.
  2. ^ "关于新建连云港至å¾å·žé“è·¯å¯è¡Œæ€§ç ”究报告的批å¤(å‘改基础[2016]1979å·)". 19 October 2016. Archived from the original on 2016-10-19. Retrieved 12 October 2020.
  3. ^ "è¿žå¾é«˜é“连云港先行开工段开工建设-中é’在线". zqb.cyol.com. Retrieved 12 October 2020.
  4. ^ "官宣ï¼å¾è¿žé«˜é“2月8日开通è¿è¥ï¼Œé™„时刻表_腾讯新闻" [Official announcement! Xulian high-speed rail opened operation on February 8, with timetables]. new.qq.com (in Chinese). 2021-02-07. Retrieved 2021-02-09.


From Wikipedia, the free encyclopedia
Lianyungang–Xuzhou
high-speed railway
è¿žå¾å®¢è¿ä¸“线
Overview
StatusOperational
Termini
Stations6
Service
Operator(s) China Railway High-speed
History
Opened8 February 2021
Technical
Line length180 km (112 mi) [1]
Track gauge1,435 mm (4 ft 8+12 in)
Minimum radius7000 m
5500 m in difficult areas
Operating speed350 km/h (217 mph)
Route map

Xuzhou East
Houmazhuang
start of line
Daxu South
Pizhou East
Xinyi South│ Xinyi
Donghaixian
Dongji
Haizhou
Lianyungang

The Lianyungang–Xuzhou high-speed railway ( Chinese: è¿žå¾å®¢è¿ä¸“线) is a high-speed railway in China. The railway has a design speed of 350 kilometres per hour (220 mph). [2]

The railway runs parallel to the Longhai railway and interchanges with it at Lianyungang and Donghaixian. It is the eastern-most section of the Eurasia Continental Bridge corridor.

History

Construction began on 6 November 2016. [3] The railway, excluding Daxu South, opened on 8 February 2021. [1] [4]

Stations

References

  1. ^ a b "江è‹å¹²çº¿é“路完æˆé—­åˆ è¿žå¾é«˜é“2月8日开通è¿è¥". æ–°åŽç½‘. 2021-02-08. Archived from the original on February 8, 2021. Retrieved 2021-02-08.
  2. ^ "关于新建连云港至å¾å·žé“è·¯å¯è¡Œæ€§ç ”究报告的批å¤(å‘改基础[2016]1979å·)". 19 October 2016. Archived from the original on 2016-10-19. Retrieved 12 October 2020.
  3. ^ "è¿žå¾é«˜é“连云港先行开工段开工建设-中é’在线". zqb.cyol.com. Retrieved 12 October 2020.
  4. ^ "官宣ï¼å¾è¿žé«˜é“2月8日开通è¿è¥ï¼Œé™„时刻表_腾讯新闻" [Official announcement! Xulian high-speed rail opened operation on February 8, with timetables]. new.qq.com (in Chinese). 2021-02-07. Retrieved 2021-02-09.



Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook