Second Chengdu–Chongqing high-speed railway 成渝中线高铁 | |
---|---|
Overview | |
Status | Under construction |
Locale | Sichuan and Chongqing |
Termini | |
Stations | 8 |
Service | |
Type | High-speed rail |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 292 km (181 mi) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 350 km/h (217 mph) |
The Second Chengdu–Chongqing high-speed railway ( Chinese: 成渝中线高铁; lit. 'Chengdu–Chongqing Central line high-speed railway') is a 292-kilometre (181 mi) [1] long high-speed rail line that connects the cities of Chengdu (in Sichuan Province) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph). It will head via Lezhi, Anyue, and Dazu. Construction started on September 26, 2021 [2] and it is expected to open in 2027.
The 292 kilometres (181 mi) long Second Chengdu–Chongqing high-speed railway will take a more direct route than the existing 307 kilometres (191 mi) long high-speed Chengdu–Chongqing intercity railway and is expected to reduce journey times between the two cities to 50 minutes. [2]
Approval for the 69.273 billion yuan project was granted on August 17, 2021 by the National Development and Reform Commission. [1]
Construction started on September 26, 2021. [2]
Station Name [3] | Chinese |
Metro transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Chengdu | 成都 | 1 7 | ||||||||
Jianzhou | 简州 | |||||||||
Lezhi | 乐至 | |||||||||
Anyue | 安岳 | |||||||||
Dazu Shike [4] | 大足石刻 | |||||||||
Tongliang [4] | 铜梁 | |||||||||
Kexuecheng | 科学城 | |||||||||
Chongqing North | 重庆北 |
4
10 (
North Square) 3 10 Loop ( Sorth Square) |
The first railway between the two cities was the Chengdu–Chongqing railway, completed in the 1950s. [5] The Suining–Chengdu railway and Suining–Chongqing railway form a route between the two cities which was completed in 2006. The fastest journeys on this line take just over two hours. The Chengdu–Chongqing intercity railway was completed in 2015.
项目总投资692.73亿元,其中工程投资678.93亿元,动车组购置费13.8亿元
全线共设站8座,线路从重庆北站引出,沿线新设科学城站、铜梁站、大足石刻站、安岳站、乐至站、简州站,接入成都站
Second Chengdu–Chongqing high-speed railway 成渝中线高铁 | |
---|---|
Overview | |
Status | Under construction |
Locale | Sichuan and Chongqing |
Termini | |
Stations | 8 |
Service | |
Type | High-speed rail |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 292 km (181 mi) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 350 km/h (217 mph) |
The Second Chengdu–Chongqing high-speed railway ( Chinese: 成渝中线高铁; lit. 'Chengdu–Chongqing Central line high-speed railway') is a 292-kilometre (181 mi) [1] long high-speed rail line that connects the cities of Chengdu (in Sichuan Province) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph). It will head via Lezhi, Anyue, and Dazu. Construction started on September 26, 2021 [2] and it is expected to open in 2027.
The 292 kilometres (181 mi) long Second Chengdu–Chongqing high-speed railway will take a more direct route than the existing 307 kilometres (191 mi) long high-speed Chengdu–Chongqing intercity railway and is expected to reduce journey times between the two cities to 50 minutes. [2]
Approval for the 69.273 billion yuan project was granted on August 17, 2021 by the National Development and Reform Commission. [1]
Construction started on September 26, 2021. [2]
Station Name [3] | Chinese |
Metro transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Chengdu | 成都 | 1 7 | ||||||||
Jianzhou | 简州 | |||||||||
Lezhi | 乐至 | |||||||||
Anyue | 安岳 | |||||||||
Dazu Shike [4] | 大足石刻 | |||||||||
Tongliang [4] | 铜梁 | |||||||||
Kexuecheng | 科学城 | |||||||||
Chongqing North | 重庆北 |
4
10 (
North Square) 3 10 Loop ( Sorth Square) |
The first railway between the two cities was the Chengdu–Chongqing railway, completed in the 1950s. [5] The Suining–Chengdu railway and Suining–Chongqing railway form a route between the two cities which was completed in 2006. The fastest journeys on this line take just over two hours. The Chengdu–Chongqing intercity railway was completed in 2015.
项目总投资692.73亿元,其中工程投资678.93亿元,动车组购置费13.8亿元
全线共设站8座,线路从重庆北站引出,沿线新设科学城站、铜梁站、大足石刻站、安岳站、乐至站、简州站,接入成都站