Second ChengduâChongqing high-speed railway ææžäžçșżé«é | |
---|---|
Overview | |
Status | Under construction |
Locale | Sichuan and Chongqing |
Termini | |
Stations | 8 |
Service | |
Type | High-speed rail |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 292 km (181 mi) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 350 km/h (217 mph) |
The Second ChengduâChongqing high-speed railway ( Chinese: ææžäžçșżé«é; lit. 'ChengduâChongqing Central line high-speed railway') is a 292-kilometre (181 mi) [1] long high-speed rail line that connects the cities of Chengdu (in Sichuan Province) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph). It will head via Lezhi, Anyue, and Dazu. Construction started on September 26, 2021 [2] and it is expected to open in 2027.
The 292 kilometres (181 mi) long Second ChengduâChongqing high-speed railway will take a more direct route than the existing 307 kilometres (191 mi) long high-speed ChengduâChongqing intercity railway and is expected to reduce journey times between the two cities to 50 minutes. [2]
Approval for the 69.273 billion yuan project was granted on August 17, 2021 by the National Development and Reform Commission. [1]
Construction started on September 26, 2021. [2]
Station Name [3] | Chinese |
Metro transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Chengdu | æéœ | 1 7 | ||||||||
Jianzhou | çźć· | |||||||||
Lezhi | äčèł | |||||||||
Anyue | ćźćČł | |||||||||
Dazu Shike [4] | ć€§è¶łçłć» | |||||||||
Tongliang [4] | éæą | |||||||||
Kexuecheng | ç§ćŠć | |||||||||
Chongqing North | éćșć |
4
10 (
North Square) 3 10 Loop ( Sorth Square) |
The first railway between the two cities was the ChengduâChongqing railway, completed in the 1950s. [5] The SuiningâChengdu railway and SuiningâChongqing railway form a route between the two cities which was completed in 2006. The fastest journeys on this line take just over two hours. The ChengduâChongqing intercity railway was completed in 2015.
éĄčçźæ»æè”692.73äșżć ïŒć ¶äžć·„çšæè”678.93äșżć ïŒćšèœŠç»èŽçœźèŽč13.8äșżć
ć šçșżć ±èźŸç«8ćș§ïŒçșżè·Żä»éćșćç«ćŒćșïŒæČżçșżæ°èźŸç§ćŠćç«ăéæąç«ăć€§è¶łçłć»ç«ăćźćČłç«ăäčèłç«ăçźć·ç«ïŒæ„ć „æéœç«
Second ChengduâChongqing high-speed railway ææžäžçșżé«é | |
---|---|
Overview | |
Status | Under construction |
Locale | Sichuan and Chongqing |
Termini | |
Stations | 8 |
Service | |
Type | High-speed rail |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 292 km (181 mi) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 350 km/h (217 mph) |
The Second ChengduâChongqing high-speed railway ( Chinese: ææžäžçșżé«é; lit. 'ChengduâChongqing Central line high-speed railway') is a 292-kilometre (181 mi) [1] long high-speed rail line that connects the cities of Chengdu (in Sichuan Province) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph). It will head via Lezhi, Anyue, and Dazu. Construction started on September 26, 2021 [2] and it is expected to open in 2027.
The 292 kilometres (181 mi) long Second ChengduâChongqing high-speed railway will take a more direct route than the existing 307 kilometres (191 mi) long high-speed ChengduâChongqing intercity railway and is expected to reduce journey times between the two cities to 50 minutes. [2]
Approval for the 69.273 billion yuan project was granted on August 17, 2021 by the National Development and Reform Commission. [1]
Construction started on September 26, 2021. [2]
Station Name [3] | Chinese |
Metro transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Chengdu | æéœ | 1 7 | ||||||||
Jianzhou | çźć· | |||||||||
Lezhi | äčèł | |||||||||
Anyue | ćźćČł | |||||||||
Dazu Shike [4] | ć€§è¶łçłć» | |||||||||
Tongliang [4] | éæą | |||||||||
Kexuecheng | ç§ćŠć | |||||||||
Chongqing North | éćșć |
4
10 (
North Square) 3 10 Loop ( Sorth Square) |
The first railway between the two cities was the ChengduâChongqing railway, completed in the 1950s. [5] The SuiningâChengdu railway and SuiningâChongqing railway form a route between the two cities which was completed in 2006. The fastest journeys on this line take just over two hours. The ChengduâChongqing intercity railway was completed in 2015.
éĄčçźæ»æè”692.73äșżć ïŒć ¶äžć·„çšæè”678.93äșżć ïŒćšèœŠç»èŽçœźèŽč13.8äșżć
ć šçșżć ±èźŸç«8ćș§ïŒçșżè·Żä»éćșćç«ćŒćșïŒæČżçșżæ°èźŸç§ćŠćç«ăéæąç«ăć€§è¶łçłć»ç«ăćźćČłç«ăäčèłç«ăçźć·ç«ïŒæ„ć „æéœç«