You can help expand this article with text translated from
the corresponding article in Polish. (April 2021) Click [show] for important translation instructions.
|
Pesa Link | |
---|---|
Manufacturer | Pesa |
Entered service | 2012 |
Operators | |
Specifications | |
Train length | 43.73 m (143 ft 6 in) (2-car version)
[1] 57.13 m (187 ft 5 in) (3-car version) [1] |
Width | 2.80 m (9 ft 2 in) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Pesa Link is a family of diesel multiple unit trains built by Pesa.
First units entered service in 2012. [2]
The first contract for the delivery of Link units to the Czech Republic was signed in April 2011. [3]
Koleje Dolnośląskie's Link units were built in 2014 and 2015. [4]
In April 2017, the first Link unit for Polregio was delivered. [5]
The four Koleje Wielkopolskie Link units were ordered in 2018. [6]
The first Pesa Link in Germany entered service with Niederbarnimer Eisenbahn in 2016. [2]
Link units operated by Deutsche Bahn are classified as 632 and 633. [7]
In April 2024, the first unit arrived in Ghana, where they are to be operated on the Tema-Mpakadan Railway Line. [8] Two units were ordered, including five years of maintenance from Pesa. [8]
You can help expand this article with text translated from
the corresponding article in Polish. (April 2021) Click [show] for important translation instructions.
|
Pesa Link | |
---|---|
Manufacturer | Pesa |
Entered service | 2012 |
Operators | |
Specifications | |
Train length | 43.73 m (143 ft 6 in) (2-car version)
[1] 57.13 m (187 ft 5 in) (3-car version) [1] |
Width | 2.80 m (9 ft 2 in) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Pesa Link is a family of diesel multiple unit trains built by Pesa.
First units entered service in 2012. [2]
The first contract for the delivery of Link units to the Czech Republic was signed in April 2011. [3]
Koleje Dolnośląskie's Link units were built in 2014 and 2015. [4]
In April 2017, the first Link unit for Polregio was delivered. [5]
The four Koleje Wielkopolskie Link units were ordered in 2018. [6]
The first Pesa Link in Germany entered service with Niederbarnimer Eisenbahn in 2016. [2]
Link units operated by Deutsche Bahn are classified as 632 and 633. [7]
In April 2024, the first unit arrived in Ghana, where they are to be operated on the Tema-Mpakadan Railway Line. [8] Two units were ordered, including five years of maintenance from Pesa. [8]