New Regional Trains | |
---|---|
Manufacturer | CAF |
Built at | Beasain, Spain |
Family name | Civity |
Replaced | |
Constructed | 2020– |
Entered service | 2025–2027 (scheduled) |
Number under construction | Total delivery of 117 carriages (19 3-car sets and 10 6-car sets) |
Formation |
|
Fleet numbers | RDA 2301– [1] |
Operators | NSW TrainLink |
Depots | Mindyarra Maintenance Centre |
Specifications | |
Train length |
|
Car length |
|
Wheel diameter | 850–780 mm (33–31 in) [3] |
Maximum speed | 160 km/h (100 mph) |
Traction motors | 12–24 × TSA TME 46-23-4 210 kW (280 hp) [4] |
Transmission | 4.365 : 1 gear ratio (2-stage reduction) [3] |
Electric system(s) | 1,500 V DC (nominal) from overhead catenary (electrified sections only) |
Current collector(s) | Pantograph |
UIC classification | Bo′Bo′+Bo′Bo′+Bo′Bo′(+Bo′Bo′+Bo′Bo′+Bo′Bo′) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Notes/references | |
[2] |
The NSW TrainLink Regional Train Project is an initiative of Transport for NSW to procure new bi-mode CAF Civity trains (designated R sets [5]) to replace NSW TrainLink's Endeavour, Xplorer and XPT fleets.
In the lead up to the 2015 state election, the Baird Government committed itself, if re-elected, to replacing the XPT fleet (19 power cars and 60 carriages). [6] [7] Having been returned to office, in October 2016, the government announced it was also considering replacing the Xplorer (23 carriages) and Endeavour (28 carriages) diesel multiple unit fleets. [8] [9] [10]
In August 2017, the government announced it had decided to proceed with the replacement of all three fleets. [11] In November 2017, three consortia, led by Bombardier, CAF and Downer, were shortlisted for the contract to build the trains. [12] In May 2018, the Bombardier Consortium withdrew from the process. [13]
A contract was signed in February 2019 with Momentum Trains, a consortium of CAF, DIF Infrastructure and Pacific Partnerships. [14] The order will comprise 117 bi-mode Civity carriages which will make up a total of 29 trains: [15] [16]
All trains will be maintained at the new Mindyarra Maintenance Centre to be built in Dubbo. [17] [18]
As of 23 November 2023 [update] there was no delivery date on the Project website. [19] An article in The Sydney Morning Herald on 26 December 2022 claimed that there was a 35-month delay in the project because the state transport agency had demanded design changes to the carriages. [20]
The first complete 6 car unit arrived into Australia at Port Kembla on 14th Feb 2024. The complete train set has been road hauled to the Dubbo Maintenance Centre for initial testing. [21]
All 117 carriages are expected to arrive in Australia by the end of 2024.[ citation needed]
New Regional Trains | |
---|---|
Manufacturer | CAF |
Built at | Beasain, Spain |
Family name | Civity |
Replaced | |
Constructed | 2020– |
Entered service | 2025–2027 (scheduled) |
Number under construction | Total delivery of 117 carriages (19 3-car sets and 10 6-car sets) |
Formation |
|
Fleet numbers | RDA 2301– [1] |
Operators | NSW TrainLink |
Depots | Mindyarra Maintenance Centre |
Specifications | |
Train length |
|
Car length |
|
Wheel diameter | 850–780 mm (33–31 in) [3] |
Maximum speed | 160 km/h (100 mph) |
Traction motors | 12–24 × TSA TME 46-23-4 210 kW (280 hp) [4] |
Transmission | 4.365 : 1 gear ratio (2-stage reduction) [3] |
Electric system(s) | 1,500 V DC (nominal) from overhead catenary (electrified sections only) |
Current collector(s) | Pantograph |
UIC classification | Bo′Bo′+Bo′Bo′+Bo′Bo′(+Bo′Bo′+Bo′Bo′+Bo′Bo′) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Notes/references | |
[2] |
The NSW TrainLink Regional Train Project is an initiative of Transport for NSW to procure new bi-mode CAF Civity trains (designated R sets [5]) to replace NSW TrainLink's Endeavour, Xplorer and XPT fleets.
In the lead up to the 2015 state election, the Baird Government committed itself, if re-elected, to replacing the XPT fleet (19 power cars and 60 carriages). [6] [7] Having been returned to office, in October 2016, the government announced it was also considering replacing the Xplorer (23 carriages) and Endeavour (28 carriages) diesel multiple unit fleets. [8] [9] [10]
In August 2017, the government announced it had decided to proceed with the replacement of all three fleets. [11] In November 2017, three consortia, led by Bombardier, CAF and Downer, were shortlisted for the contract to build the trains. [12] In May 2018, the Bombardier Consortium withdrew from the process. [13]
A contract was signed in February 2019 with Momentum Trains, a consortium of CAF, DIF Infrastructure and Pacific Partnerships. [14] The order will comprise 117 bi-mode Civity carriages which will make up a total of 29 trains: [15] [16]
All trains will be maintained at the new Mindyarra Maintenance Centre to be built in Dubbo. [17] [18]
As of 23 November 2023 [update] there was no delivery date on the Project website. [19] An article in The Sydney Morning Herald on 26 December 2022 claimed that there was a 35-month delay in the project because the state transport agency had demanded design changes to the carriages. [20]
The first complete 6 car unit arrived into Australia at Port Kembla on 14th Feb 2024. The complete train set has been road hauled to the Dubbo Maintenance Centre for initial testing. [21]
All 117 carriages are expected to arrive in Australia by the end of 2024.[ citation needed]