Huairou–Daxing Airport intercity railway | |
---|---|
Overview | |
Status | Under construction |
Locale | Beijing and Hebei |
Termini |
|
Service | |
Type | Higher-speed rail |
Operator(s) | China Railway Beijing Group |
History | |
Opened | 2024 (Phase 1) [1] |
Technical | |
Line length | 39.438 km (Phase 1) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 200 km/h [2] |
Huairou–Daxing intercity railway ( Chinese: 怀兴城际é“è·¯; pinyin: Huái–XÄ«ng Chéngjì tiÄ›lù), formerly known as Capital Airport–Daxing Airport intercity railway connecting line ( Chinese: 首都机场至大兴机场城际é“è·¯è”络线 [3]), is a higher-speed railway line currently under construction. The speed will be 200 km/h. [2] It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed. [4]
Phase 1 of the railway, which is currently under construction, will connect Langfang North station in Langfang, Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province. [4] Phase 1 of the railway will be finished in 2024. [1] [5]
The second phase from Langfang East railway station to Huairou South railway station via Capital Airport is under planning. [3]
Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际é“è·¯).
Station Name [6] [5] | Total distance (km) | Travel Time | Transfer | Location | |
---|---|---|---|---|---|
English | Chinese | ||||
Daxing Airport East [6] | 大兴机场东 |
![]() |
Guangyang District, Langfang, Hebei [a] | ||
Lixian [5] | 礼贤 | Daxing District, Beijing | |||
Langfang West [6] | 廊åŠè¥¿ | Guangyang District, Langfang, Hebei | |||
Langfang Kaifaqu [6] | 廊åŠå¼€å‘区 | ||||
The Phase 2 of the railway will be replaced by New Town Link Line (S6) of Beijing Subway and the stations on the line have not announced.
新建首都国际机场至大兴国际机场城际é“è·¯è”络线工程是京津冀城际é“路网规划建设的é‡è¦é¡¹ç›®
ä»Šå¹´è¿˜å°†åŠ å¿«å»ºè®¾åŸŽé™…é“è·¯è”络线一期项目,其ä¸ï¼Œç¤¼è´¤ç«™ä½äºŽä¸´ç©ºç»æµŽåŒºç¤¼è´¤ç‰‡åŒºçš„æ ¸å¿ƒä½ç½®ï¼Œæ˜¯åŸŽé™…è”络线一期建设的4座车站之一,预计2023年投入使用
Huairou–Daxing Airport intercity railway | |
---|---|
Overview | |
Status | Under construction |
Locale | Beijing and Hebei |
Termini |
|
Service | |
Type | Higher-speed rail |
Operator(s) | China Railway Beijing Group |
History | |
Opened | 2024 (Phase 1) [1] |
Technical | |
Line length | 39.438 km (Phase 1) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 200 km/h [2] |
Huairou–Daxing intercity railway ( Chinese: 怀兴城际é“è·¯; pinyin: Huái–XÄ«ng Chéngjì tiÄ›lù), formerly known as Capital Airport–Daxing Airport intercity railway connecting line ( Chinese: 首都机场至大兴机场城际é“è·¯è”络线 [3]), is a higher-speed railway line currently under construction. The speed will be 200 km/h. [2] It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed. [4]
Phase 1 of the railway, which is currently under construction, will connect Langfang North station in Langfang, Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province. [4] Phase 1 of the railway will be finished in 2024. [1] [5]
The second phase from Langfang East railway station to Huairou South railway station via Capital Airport is under planning. [3]
Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际é“è·¯).
Station Name [6] [5] | Total distance (km) | Travel Time | Transfer | Location | |
---|---|---|---|---|---|
English | Chinese | ||||
Daxing Airport East [6] | 大兴机场东 |
![]() |
Guangyang District, Langfang, Hebei [a] | ||
Lixian [5] | 礼贤 | Daxing District, Beijing | |||
Langfang West [6] | 廊åŠè¥¿ | Guangyang District, Langfang, Hebei | |||
Langfang Kaifaqu [6] | 廊åŠå¼€å‘区 | ||||
The Phase 2 of the railway will be replaced by New Town Link Line (S6) of Beijing Subway and the stations on the line have not announced.
新建首都国际机场至大兴国际机场城际é“è·¯è”络线工程是京津冀城际é“路网规划建设的é‡è¦é¡¹ç›®
ä»Šå¹´è¿˜å°†åŠ å¿«å»ºè®¾åŸŽé™…é“è·¯è”络线一期项目,其ä¸ï¼Œç¤¼è´¤ç«™ä½äºŽä¸´ç©ºç»æµŽåŒºç¤¼è´¤ç‰‡åŒºçš„æ ¸å¿ƒä½ç½®ï¼Œæ˜¯åŸŽé™…è”络线一期建设的4座车站之一,预计2023年投入使用