This article may be
too long to read and navigate comfortably. (November 2023) |
Urban rail transit in China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and maglev. [1] Some classifications also include non-rail bus rapid transport.
As of April 2024, China has the world's longest urban rail transit system with 10,273.7 km (6,383.8 mi) of urban rail nationwide in 310 metro lines in 54 cities, accounting for 9 of the 10 longest metro systems, with the exceptions of the Moscow Metro. [2]
Half of the top 10 busiest metro systems are in China, [3] and the Beijing Subway, though started operating in 1971, is now the longest metro system worldwide. [4] [5] [6]
RT systems among Provincial-level administrative divisions | |||
---|---|---|---|
Province | System(s) | # | Length (km) |
BJ | Beijing | 1 | 836.0 |
TJ | Tianjin | 1 | 309.9 |
HE | Shijiazhuang | 1 | 76.5 |
SX | Taiyuan | 1 | 23.7 |
NM | Hohhot | 1 | 49.0 |
LN | Dalian, Shenyang | 2 | 400.8 |
JL | Changchun | 1 | 111.2 |
HL | Harbin | 1 | 83.7 |
SH | Shanghai, Maglev line | 2 | 831.0 |
JS | Nanjing, Suzhou, Wuxi, Changzhou, Xuzhou, Nantong | 6 | 1034.5 |
ZJ | Hangzhou, Ningbo, Wenzhou, Shaoxing, Hanghai line, Jinhua, Taizhou | 7 | 1077.2 |
AH | Hefei, Ningchu line, Wuhu | 3 | 294.3 |
FJ | Fuzhou, Xiamen | 2 | 237.4 |
JX | Nanchang | 1 | 128.4 |
SD | Qingdao, Jinan | 2 | 402.2 |
HA | Zhengzhou, Luoyang | 2 | 388.3 |
HB | Wuhan | 1 | 486.0 |
HN | Changsha, Maglev line | 2 | 226.4 |
GD | Guangzhou, Shenzhen, Foshan, Dongguan | 4 | 1358.6 |
GX | Nanning | 1 | 127.9 |
HI | |||
CQ | Chongqing | 1 | 520.3 |
SC | Chengdu | 1 | 561.6 |
GZ | Guiyang | 1 | 118.7 |
YN | Kunming | 1 | 184.1 |
XZ | |||
SN | Xi'an | 1 | 311.0 |
GS | Lanzhou | 1 | 35.0 |
QH | |||
NX | |||
XJ | ĂrĂŒmqi | 1 | 27.6 |
HK | Hong Kong | 1 | 204.4 |
MO | Macau | 1 | 12.5 |
Several Chinese cities had urban electric tramways in the early 20th century, most of which were dismantled in the 1950sâ1970s. The only surviving tramways are in Dalian (Dairen) and Changchun (see trams in Dalian and trams in Changchun). Nanjing (Nanking) had an urban railway from 1907 to 1958.
The first subway in China was built in Beijing in 1969 (but it was only handed to civilian control in 1981 and trial operations ended later in the same year; before which credentials were required). The Tianjin Metro followed in 1984. The MTR Corporation Limited from across the border in Hong Kong has investment, consulting and management stakes in the rapid transit systems of several mainland Chinese cities (having completed their first section of subway and entered into revenue operation in 1979 in New Kowloon, at the time when the territory was under British rule).
The rapid growth of the Chinese economy since the 1980s has created a huge surge in demand for urban transport. This prompted cities across China to pursue and draft proposals for subway networks, with Shanghai and Guangzhou opening their first sections of subway in the 1990s, inspiring more cities to propose subway networks. In 1995, the Central Government, alarmed by the high cost and financial debt from these ambitious subway plans, put out a "notice on the suspension of approval of urban underground rapid rail transit projects" barring new subway systems outside of Beijing, Tianjin, Guangzhou and Shanghai from being built. [7] At the time Nanjing, Wuhan, Chongqing, Dalian and Shenzhen had advanced proposals waiting to be approved. Wuhan, Chongqing, Dalian managed to circumvent the moratorium on subway construction by constructing and opening lower cost elevated lines, light metros, and monorails in the early 2000s. Changchun was the first city constructing real light rail system in China, which began operation in 2002. Its first transit line, Line 3, is a light rail line not fully grade separated, still having four level crossings as of 2023. It's also the only rapid transit system combined light rail and rapid transit lines in China, which can directly transfer to each other.[ citation needed]
Rapid urbanization of China led to severe congestion and pollution in urban areas leading to the suspension being lifted. Initially, light metro lines using small profile and shorter rolling stock were constructed to reduce costs. It was assumed that as ridership grows the line will operate trains at a low headway to increase capacity. This design paradigm was known in China as "small rolling stock, high density" operation. [8] [9] [10] However, after a few years operating, many of these lines such as Guangzhou Metro Line 3, Line 6, Shanghai Metro Line 6, and Line 8 were severely overcapacity. Guangzhou Metro Line 3 was able to reconfigure from 3-car trains into 6-car trains to slightly relieve overcapacity. This led many cities such as Beijing, Guangzhou, Wuhan and Chengdu to use higher capacity designs on newer lines.[ citation needed]
Since the mid-2000s, the growth of rapid transit systems in Chinese cities has rapidly accelerated, with most of the world's new subway mileage in the past decade opening in China. [11] [4] [12] [13] From 2009 to 2015, China built 87 mass transit rail lines, totaling 3,100 km (1,900 mi), in 25 cities at the cost of „988.6 billion. [14] In 2016, the Chinese government lowered the minimum population criteria for a city to start planning a metro system from 3 million to 1.5 million residents. [15] As part of its 13th Five Year Plan, the Chinese government published a transport whitepaper titled "Development of China's Transport". The plan envisions a more sustainable transport system with priority focused on high-capacity public transit particularly urban rail transit and bus rapid transit. All cities with over 3 million residents will start or continue to develop urban rail networks. Regional rail networks will be constructed internally connect and integrate urban agglomerations such as the Jingjinji, Yangtze River Delta and Pearl River Delta areas. [16] [17] In 2017, some 43 smaller third-tier cities in China have received approval to develop subway lines. [18]
System | Locale | Administrative division |
Lines | Stations [a] | Length (km(mi)) |
Operation start |
Most recent expansion |
Annual ridership |
Busiest station |
Ave. daily ridership (thousands) [19] [b] | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||
Beijing Subway ( ) | Beijing & Langfang | Beijing & Hebei | 25 [c] | 381 [c] | 815.2 km (506.5 mi) [c] | 1969-10-01 [d] | 2023-12-30 | 3848.4 million (2018) [20] | Xizhimen (2018) [21] | 10,821.5 | 6,252.2 | 8,370.8 | |||
Changchun Rail Transit | Changchun | Jilin | 6 [e] | 109 [f] | 140.77 km (87.47 mi) [g] | 2017-09-30 [h] | 2024-03-28 | 127.3 million (2018) [21] | Changchun Railway Station (2018) [21] | 653.4 | 420.3 | 534.2 | |||
Changsha Metro | Changsha & Xiangtan | Hunan | 7 | 135 | 207.9 km (129.2 mi) | 2014-04-29 | 2023-06-28 | 250.3 million (2018) [21] [i] | Wuyi Square (2018) [21] | 904.9 | 1,033.3 | 1,582.4 | |||
Changsha Maglev Express | Changsha | Hunan | 1 | 3 | 18.55 km (11.53 mi) | 2016-05-06 | N/A | South Railway Station | |||||||
Changzhou Metro | Changzhou | Jiangsu | 2 | 43 | 54.03 km (33.57 mi) [22] | 2019-09-21 | 2021-06-28 | 10.3 million (2019) | 167.5 | 65.3 | 131.1 | ||||
Chengdu Metro | Chengdu | Sichuan | 13 [j] | 291 [j] | 561.67 km (349.01 mi) [j] | 2010-09-27 | 2023-11-28 | 1157.6 million (2018) [21] | Chunxi Road (2018) [21] | 3,829.8 | 3,310.5 | 4,885.3 | |||
Chongqing Rail Transit | Chongqing | Chongqing | 11 | 256 | 523.68 km (325.40 mi) | 2004-11-06 | 2023-12-28 | 857.9 million (2018) [21] | Lianglukou (2018) [21] | 2,845.6 | 2,290.0 | 2,992.0 | |||
Dalian Metro ( ) | Dalian | Liaoning | 6 | 100 | 237.74 km (147.72 mi) | 2002-11-08 | 2023-03-17 | 192.3 million (2018) [21] | Xi'an Road (2018) [21] | 568.6 | 342.9 | 426.2 | |||
Dongguan Rail Transit | Dongguan | Guangdong | 1 | 15 | 37.7 km (23.4 mi) | 2016-05-27 | N/A | 46.1 million (2018) [21] | Hongfu Road (2018) [21] | 147.5 | 97.5 | 111.4 | |||
Foshan Metro | Foshan & Guangzhou | Guangdong | 3 | 61 | 112.7 km (70.0 mi) | 2010-11-03 | 2022-12-28 | 110 million (2017) [23] | Zumiao (2017) [23] | 83.5 | |||||
Fuzhou Metro | Fuzhou | Fujian | 5 | 90 | 143.5 km (89.2 mi) | 2016-05-16 | 2023-08-27 | 227.766 million (2023) [24] | Dongjiekou (2018) [21] | 294.7 | 259.5 | 340.4 | 310.3 | 624.0 | |
Guangzhou Metro | Guangzhou & Foshan | Guangdong | 16 | 251 [k] [l] | 613.21 km (381.03 mi) [m] [l] | 1997-06-28 | 2023-12-28 | 3029.5 million (2018) [21] [n] [l] | Tiyu Xilu (2018) [21] | 9,057.2 | 6,591.6 | 7,755.4 | |||
Guiyang Metro | Guiyang | Guizhou | 3 | 82 | 118.73 km (73.78 mi) | 2017-12-28 | 2023-12-16 | 7.4 million (2018) [21] | West Zhongshan Road (2018) [21] | 149.2 | 122.1 | 294.7 | |||
Hangzhou Metro ( ) | Hangzhou | Zhejiang | 12 | 254 | 516.2 km (320.8 mi) | 2012-11-24 | 2022-09-22 | 529.9 million (2018) [21] | East Railway Station (2018) [21] | 1,737.1 | 970.9 | 2,432.7 | |||
Harbin Metro | Harbin | Heilongjiang | 3 | 66 | 83.8 km (52.1 mi) | 2013-09-26 | 2023-12-26 | 97.4 million (2018) [21] | The Second Affiliated Hospital of Harbin Medical University (2018) [21] | 284.0 | 140.9 | 195.5 | |||
Hefei Metro | Hefei | Anhui | 5 | 154 | 201.95 km (125.49 mi) | 2016-12-26 | 2023-12-26 | 153.2 million (2018) [21] | Dadongmen (2018) [21] | 492.7 | 532.9 | 739.2 | |||
Hohhot Metro | Hohhot | Inner Mongolia | 2 | 43 | 49.039 km (30.471 mi) | 2019-12-29 | 2020-10-01 | 143.4 | 147.2 | ||||||
Mass Transit Railway ( ) | Hong Kong | Hong Kong SAR | 10 | 99 | 209.0 km (129.9 mi) | 1979-10-01 [o] | 2022-05-15 | 1767 million (2017) [25] [R Nb 1] | Admiralty | ||||||
Jinan Metro | Jinan | Shandong | 3 | 41 | 84.25 km (52.35 mi) | 2019-04-01 | 2021-03-26 | 172.8 | 189.1 | ||||||
Jinhua Rail Transit | Jinhua | Zhejiang | 2 | 31 | 106.451 km (66.146 mi) | 2022-08-30 | 2023-04-07 | Not opened | Not opened | Not opened | |||||
Kunming Metro | Kunming | Yunnan | 6 | 103 | 164.3 km (102.1 mi) | 2012-06-28 | 2022-06-29 | 199.6 million (2018) [21] | Dongfeng Square (2018) [21] | 586.1 | 435.1 | 606.8 | |||
Lanzhou Metro | Lanzhou | Gansu | 2 | 27 | 34.96 km (21.72 mi) [26] | 2019-06-23 | 2023-06-29 | 181.1 | 197.5 | 184.4 | |||||
Luoyang Subway | Luoyang | Henan | 2 | 33 | 43.554 km (27.063 mi) | 2021-03-28 | 2021-12-26 | Not opened | Not opened | 92.0 | |||||
Macau Light Rapid Transit | Macau | Macau SAR | 1 | 12 | 12.5 km (7.8 mi) [27] | 2019-12-10 [27] | 2023-12-08 | ||||||||
Nanchang Metro | Nanchang | Jiangxi | 4 | 94 | 128.3 km (79.7 mi) | 2015-12-26 | 2021-12-26 | 141.8 million (2018) [21] [28] | Bayi Square (2015-2020) [29] | 488.1 | 373.9 | 707.5 | |||
Nanjing Metro | Nanjing | Jiangsu | 13 | 206 | 505.86 km (314.33 mi) | 2005-09-03 | 2023-12-28 | 1118.8 million (2018) [21] | Xinjiekou (2018) [21] | 3,153.8 | 2,179.9 | 2,404.9 | |||
Nanning Metro | Nanning | Guangxi | 5 | 93 | 128.2 km (79.7 mi) | 2016-06-28 | 2021-12-16 | 213.6 million (2018) [21] | Chaoyang Square (2018) [21] | 748.4 | 569.6 | 786.8 | |||
Nantong Metro | Nantong | Jiangsu | 2 | 43 | 60.03 km (37.30 mi) | 2022-11-10 | 2023-12-27 | Not opened | Not opened | Not opened | |||||
Ningbo Rail Transit | Ningbo | Zhejiang | 5 | 116 | 185.36 km (115.18 mi) | 2014-05-30 | 2022-12-01 | 124.4 million (2018) [21] | Gulou (2018) [21] | 424.9 | 297.6 | 689.2 | |||
Qingdao Metro | Qingdao | Shandong | 8 | 186 | 342.3 km (212.7 mi) | 2015-12-16 | 2024-04-26 | 153.9 million (2018) [21] | May 4th Square (2018) [21] | 515.2 | 316.0 | 686.8 | |||
Shanghai Metro ( ) | Shanghai & Kunshan | Shanghai & Jiangsu | 19 | 408 | 802.2 km (498.5 mi) | 1993-05-28 | 2021-12-30 | 3710.2 million (2018) [21] | People's Square (2018) [21] | 10,627.3 | 7,744.8 | 9,765.4 | |||
Shanghai Maglev Train | Shanghai | Shanghai | 1 | 2 | 29.863 km (18.556 mi) | 2002-12-31 | N/A | Longyang Road | |||||||
Shaoxing Metro | Shaoxing | Zhejiang | 2 | 35 | 57.83 km (35.93 mi) | 2021-06-28 [30] | 2023-07-26 | Not opened | Not opened | ||||||
Shenyang Metro | Shenyang | Liaoning | 5 | 111 | 163.7 km (101.7 mi) | 2010-09-27 | 2023-09-29 | 329.9 million (2018) [21] | Qingniandajie (2018) [21] | 892.0 | 846.9 | 1,049.7 | |||
Shenzhen Metro ( ) | Shenzhen | Guangdong | 16 | 307 | 555.43 km (345.13 mi) | 2004-12-28 | 2023-12-27 | 1646.1 million (2018) [21] | Laojie (2018) [21] | 5,493.7 | 4,413.0 | 5,953.6 | |||
Shijiazhuang Metro | Shijiazhuang | Hebei | 3 | 60 | 76.5 km (47.5 mi) [31] | 2017-06-26 | 2021-04-06 | 87.6 million (2018) [21] [32] | Xinbaiguangchang (2018) [21] | 262.1 | 195.7 | 282.4 | |||
Suzhou Rail Transit | Suzhou | Jiangsu | 6 | 181 | 249.47 km (155.01 mi) | 2012-04-28 | 2023-06-24 | 363 million (2019) [21] | Dongfangzhimen (2018) [21] | 994.6 | 828.7 | 1,107.4 | |||
Taiyuan Metro | Taiyuan | Shanxi | 1 | 23 | 23.647 km (14.694 mi) [33] | 2020-12-26 | N/A | Not opened | 146.9 | 106.8 | |||||
Taizhou Rail Transit | Taizhou | Zhejiang | 1 | 15 | 52.568 km (32.664 mi) | 2022-12-28 | N/A | Not opened | Not opened | Not opened | |||||
Tianjin Metro ( ) | Tianjin | Tianjin | 10 | 192 | 301.0 km (187.0 mi) | 1980-08-10 [p] | 2023-12-28 | 408.5 million (2018) [21] | Tianjinzhan (2018) [21] | 1,435.9 | 933.6 | 1,263.8 | |||
ĂrĂŒmqi Metro | ĂrĂŒmqi | Xinjiang | 1 | 21 | 27.615 km (17.159 mi) | 2018-10-25 | 2019-06-28 | 2.4 million (2018) [21] | |||||||
Wenzhou Rail Transit | Wenzhou | Zhejiang | 2 | 36 | 116.452 km (72.360 mi) | 2019-01-23 | 2023-08-26 | 109.7 | 236.2 | 27.8 | |||||
Wuhan Metro | Wuhan | Hubei | 12 | 262 [34] | 486.3 km (302.2 mi) [34] | 2004-07-24 | 2023-12-30 | 1054.0 million (2018) [21] | Jianghan Road (2018) [21] | 3,349.4 | 2,055.0 | 2,737.9 | |||
Wuhu Rail Transit | Wuhu | Anhui | 2 | 35 | 46.25 km (28.74 mi) | 2021-11-03 | 2021-12-28 | Not opened | Not opened | 51.3 | |||||
Wuxi Metro | Wuxi | Jiangsu | 5 | 89 | 145.2 km (90.2 mi) | 2014-07-01 | 2024-01-31 | 103.1 million (2018) [21] | Sanyang Plaza (2018) [21] | 356.8 | 400.9 | ||||
Xi'an Metro | Xi'an & Xianyang | Shaanxi | 9 | 191 | 311.0 km (193.2 mi) | 2011-09-16 | 2023-09-21 | 746.2 million (2018) [21] | Xiaozhai (2018) [21] | 2,589.9 | 1,996.3 | 2,811.4 | |||
Xiamen Metro | Xiamen | Fujian | 3 | 70 | 98.4 km (61.1 mi) | 2017-12-31 | 2023-06-25 | 246.4158 million (2023) [24] | LĂŒcuo (2020) [24] | 159.4 | 312.2 | 464.4 | 540.3 | 675.1 | |
Xuzhou Metro | Xuzhou | Jiangsu | 3 | 51 | 64.35 km (39.99 mi) [35] | 2019-09-28 | 2021-06-28 | 7.5 million (2019) | |||||||
Zhengzhou Metro | Zhengzhou | Henan | 11 | 187 | 344.2 km (213.9 mi) | 2013-12-28 | 2023-12-28 | 293.4 million (2018) [21] | Zhengzhou Railway Station (2018) [21] | 1,126.6 | 930.2 | 1,378.6 | |||
Total | 50 locales | 29 administrative divisions |
291 | 5,592 [a] [q] | 10,186.24 km (6,329.44 mi) | 23.063 billion | 65.077 million | 48.094 million | 64.752 million |
â Lines in operation
â Lines under testing
Urban rail transit lines | |||||||
---|---|---|---|---|---|---|---|
Livery | Line | System | Length | Stations | Car configuration | Stock size [e] | Commencement |
Line 1 | Beijing | 31.0 km (19.3 mi) [36] | 23 | 6 | B1 | 1969-10-01 | |
Line 2 | 23.1 km (14.4 mi) [36] | 18 | 6 | B1 | 1984-09-20 | ||
Line 4 | 28.2 km (17.5 mi) [36] | 24 | 6 | B1 | 2009-09-28 | ||
Line 5 | 27.6 km (17.1 mi) [36] | 23 | 6 | B1 | 2007-10-07 | ||
Line 6 | 53.4 km (33.2 mi) [37] | 34 | 8 | B2 | 2012-12-30 | ||
Line 7 | 40.3 km (25.0 mi) | 30 | 8 | B1 | 2014-12-28 | ||
Line 8 | 49.5 km (30.8 mi) | 34 | 6 | B1 | 2008-07-19 | ||
Line 9 | 16.5 km (10.3 mi) [36] | 13 | 6 | B1 | 2011-12-31 | ||
Line 10 | 57.1 km (35.5 mi) [36] | 45 | 6 | B1 | 2008-07-19 | ||
Line 11 | 2.89 km (1.80 mi) | 4 | 4 | A | 2021-12-31 | ||
Line 13 | 40.85 km (25.38 mi) | 17 | 6 | B1 | 2002-09-22 | ||
Line 14 | 47.3 km (29.4 mi) [38] | 33 | 6 | A | 2013-05-05 | ||
Line 15 | 41.4 km (25.7 mi) [36] | 20 | 6 | B1 | 2010-12-30 | ||
Line 16 | 48.9 km (30.4 mi) [39] | 29 | 8 | A | 2016-12-31 | ||
Line 17 | 40.7 km (25.3 mi) | 16 | 8 | A | 2021-12-31 | ||
Line 19 | 20.9 km (13.0 mi) | 10 | 8 | A | 2021-12-31 | ||
Line S1 | 10.2 km (6.3 mi) [40] | 8 | 6 | ML | 2017-12-30 | ||
Batong line | 23.4 km (14.5 mi) [41] | 13 | 6 | B1 | 2003-12-27 | ||
Capital Airport Express | 29.9 km (18.6 mi) [36] | 5 | 4 | LB | 2008-07-19 | ||
Changping line | 43.2 km (26.8 mi) [42] | 18 | 6 | B1 | 2010-12-30 | ||
Daxing Airport Express | 41.36 km (25.70 mi) | 3 | 4/8 | D (two doors per car) | 2019-09-26 [43] | ||
Daxing line | 21.76 km (13.52 mi) [36] | 11 | 6 | B1 | 2010-12-30 | ||
Fangshan line | 31.8 km (19.8 mi) [44] [45] | 16 | 6 | B1 | 2010-12-30 | ||
Yanfang line | 14.4 km (8.9 mi) [46] | 9 | 4 | B1 | 2017-12-30 | ||
Yizhuang line | 23.2 km (14.4 mi) | 14 | 6 | B1 | 2010-12-30 | ||
Line 1 | Changchun | 18.142 km (11.273 mi) [47] [36] | 15 | 6 | B2 | 2017-06-30 | |
Line 2 | 24.86 km (15.45 mi) [48] | 21 | 6 | B2 | 2018-08-30 | ||
Line 3 | 34.1 km (21.2 mi) | 34 | 6 | C (Low-floor light rail) | 2002-10-30 | ||
Line 4 | 20.8 km (12.9 mi) | 20 | 6 | C (Low-floor light rail) | 2011-06-30 | ||
Line 6 | 29.57 km (18.37 mi) | 22 | 6 | B | 2024-03-28 | ||
Line 8 | 13.1 km (8.1 mi) | 12 | 6 | C (Low-floor light rail) | 2018-10-30 | ||
Line 1 | Changsha | 23.57 km (14.65 mi) [36] | 20 | 6 | B2 | 2016-06-28 | |
Line 2 | 26.58 km (16.52 mi) [36] | 23 | 6 | B2 | 2014-04-29 | ||
Line 3 | 53.69 km (33.36 mi) [49] | 33 | 6 | B | 2020-06-28 | ||
Line 4 | 33.5 km (20.8 mi) | 25 | 6 | B2 | 2019-05-26 | ||
Line 5 | 22.5 km (14.0 mi) [49] | 18 | 6 | B | 2020-06-28 | ||
Line 6 | 48.11 km (29.89 mi) | 34 | 6 | A | 2022-06-28 | ||
Maglev Express | Changsha ML | 18.55 km (11.53 mi) [36] | 3 | 3 | ML | 2016-05-06 | |
Line 1 | Changzhou | 34.24 km (21.28 mi) [22] | 29 | 6 | B | 2019-09-21 | |
Line 2 | 19.79 km (12.30 mi) [50] | 15 | 6 | B | 2021-06-28 | ||
Line 1 | Chengdu | 40.99 km (25.47 mi) [36] | 35 | 6 | B2 | 2010-09-27 | |
Line 2 | 42.32 km (26.30 mi) [36] | 32 | 6 | B2 | 2012-09-16 | ||
Line 3 | 49.85 km (30.98 mi) | 37 | 6 | B2 | 2016-07-31 | ||
Line 4 | 43.28 km (26.89 mi) [36] [46] | 30 | 6 | B2 | 2015-12-26 | ||
Line 5 | 49.018 km (30.5 mi) | 41 | 8 | A | 2019-12-27 | ||
Line 6 | 68.76 km (42.7 mi) [51] | 54 | 8 | A | 2020-12-18 | ||
Line 7 | 38.61 km (23.99 mi) [46] | 31 | 6 | A | 2017-12-06 | ||
Line 8 | 29.17 km (18.1 mi) [51] | 25 | 6 | A | 2020-12-18 | ||
Line 9 | 22.18 km (13.8 mi) [51] | 13 | 8 | A | 2020-12-18 | ||
Line 10 | 37.972 km (23.6 mi) [52] [53] | 16 | 6 | A | 2017-09-06 | ||
Line 17 | 5.486 km (3.4 mi) [51] | 3 | 8 | A | 2020-12-18 | ||
Line 18 | 69.39 km (43.12 mi) [51] | 12 | 8 | A | 2020-09-27 [54] | ||
Line 19 | 60.139 km (37.369 mi) | 18 | 4 | A | 2023-11-28 [f] | ||
Line 1 | Chongqing | 43.71 km (27.16 mi) | 25 | 6 | B2 | 2011-07-28 | |
Line 2 | 31.36 km (19.49 mi) [36] | 25 | 4/6/8 | HL | 2004-11-06 | ||
Line 3 | 67.09 km (41.69 mi) [36] | 45 | 6/8 | HL | 2011-09-29 | ||
Line 4 | 48.5 km (30.1 mi) [55] | 24 | 6 | AS | 2018-12-28 | ||
Line 5 | 48.66 km (30.24 mi) [46] | 31 | 6 | AS | 2017-12-28 | ||
Jiangtiao line | 26.33 km (16.36 mi) [56] | 7 | 6 | AS | 2022-08-06 [56] | ||
Line 6 | 85.54 km (53.15 mi) [36] | 40 | 6 | B2 | 2012-09-28 | ||
Line 9 | 40.1 km (24.9 mi) | 29 | 6 | AS | 2022-01-25 | ||
Line 10 | 43.26 km (26.88 mi) | 26 | 6 | AS | 2017-12-28 | ||
Line 18 | 28.96 km (17.99 mi) | 19 | 6 | AS | 2023-12-28 | ||
Loop line | 50.93 km (31.65 mi) | 33 | 6 | AS | 2018-12-28 | ||
Line 1 | Dalian | 28.34 km (17.61 mi) [57] | 22 | 6 | B2 | 2015-10-30 | |
Line 2 | 37.97 km (23.59 mi) [57] | 29 | 6 | B2 | 2015-05-22 | ||
Line 3 | 63.45 km (39.43 mi) [57] | 18 | 2/4 | B2 | 2002-11-08 | ||
Line 5 | 24.48 km (15.21 mi) | 18 | 6 | B2 | 2023-03-17 | ||
Line 12 | 40.38 km (25.09 mi) [57] | 8 | 4 | B2 | 2013-12-30 | ||
Line 13 | 43.152 km (26.813 mi) | 12 | 4 | B2 | 2021-12-28 | ||
Line 2 | Dongguan | 37.8 km (23.5 mi) [36] | 15 | 6 | B2 | 2016-05-27 | |
Line 2 | Foshan | 32.41 km (20.14 mi) [58] | 17 | 6 | B | 2021-12-28 | |
Line 3 | 40.72 km (25.30 mi) | 22 | 6 | B | 2022-12-28 | ||
Line 1 | Fuzhou | 29.84 km (18.54 mi) [36] [46] | 25 | 6 | B2 | 2016-05-18 | |
Line 2 | 30.629 km (19.032 mi) | 22 | 6 | B2 | 2019-04-26 | ||
Line 4 | 24.0 km (14.9 mi) | 19 | 6 | B2 | 2023-08-27 | ||
Line 5 | 27.71 km (17.22 mi) [59] | 20 | 6 | B2 | 2022-04-29 | ||
Line 6 | 31.346 km (19.5 mi) [60] | 14 | 4 | B2 | 2022-08-28 | ||
Line 1 | Guangzhou | 18.5 km (11.5 mi) [36] | 16 | 6 | A | 1997-06-28 | |
Line 2 | 31.8 km (19.8 mi) [36] | 24 | 6 | A | 2002-12-29 | ||
Line 3 | 68.5 km (42.6 mi) [36] | 30 | 6 | B2 | 2005-12-26 | ||
Line 4 | 60.04 km (37.31 mi) [36] [46] | 23 | 4 | LB | 2005-12-26 | ||
Line 5 | 41.7 km (25.9 mi) [36] | 30 | 6 | LB | 2009-12-28 | ||
Line 6 | 41.7 km (25.9 mi) [36] | 31 | 4 | LB | 2013-12-28 | ||
Line 7 | 54.24 km (33.70 mi) [36] | 27 | 6 | B2 | 2016-12-28 | ||
Line 8 | 33.9 km (21.1 mi) [61] | 28 | 6 | A | 2010-09-25 | ||
Line 9 | 20.1 km (12.5 mi) [46] | 11 | 6 | B2 | 2017-12-28 | ||
Line 13 | 28.3 km (17.6 mi) [46] | 11 | 8 | A | 2017-12-28 | ||
Line 14 | 75.4 km (46.9 mi) [46] | 22 | 6 | B1 | 2017-12-28 | ||
Line 18 | 58.3 km (36.2 mi) [62] [63] | 8 | 8 | D | 2021-09-28 [63] | ||
Line 21 | 61.5 km (38.2 mi) [64] | 21 | 6 | B1 | 2018-12-28 | ||
Line 22 | 18.2 km (11.3 mi) | 4 | 8 | D | 2022-03-31 | ||
Zhujiang New Town APM line | 3.9 km (2.4 mi) [36] | 9 | 2 | P | 2010-11-08 | ||
Guangfo line | Guangzhou & Foshan | 39.6 km (24.6 mi) | 25 | 4 | B2 | 2010-09-25 | |
Line 1 | Guiyang | 35.11 km (21.8 mi) | 25 | 6 | B2 | 2017-12-28 | |
Line 2 | 40.6 km (25.2 mi) [65] | 32 | 6 | B2 | 2021-04-28 | ||
Line 3 | 43.03 km (26.7 mi) | 29 | 6 | B2 | 2023-12-16 | ||
Line 1 | Hangzhou | 52.21 km (32.44 mi) [36] | 33 | 6 | B2 | 2012-11-24 | |
Line 2 | 42.82 km (26.61 mi) [66] | 33 | 6 | B2 | 2014-11-24 | ||
Line 3 | 57.5 km (35.7 mi) | 37 | 6 | AH | 2022-02-21 | ||
Line 4 | 46.85 km (29.11 mi) [36] | 32 | 6 | B2 | 2015-02-02 | ||
Line 5 | 53.92 km (33.50 mi) [67] | 39 | 6 | AH | 2019-06-24 | ||
Line 6 | 58.5 km (36.4 mi) | 36 | 6 | AH | 2020-12-30 | ||
Line 7 | 47.48 km (29.50 mi) | 24 | 6 | A | 2020-12-30 | ||
Line 8 | 17.17 km (10.67 mi) | 9 | 6 | A | 2021-06-28 | ||
Line 9 | 29.5 km (18.3 mi) [68] | 21 | 6 | B2 | 2021-07-10 [69] [H 1] | ||
Line 10 | 14.67 km (9.12 mi) | 12 | 6 | A | 2022-02-21 | ||
Line 16 | 35.12 km (21.82 mi) [70] | 12 | 4 | B2 | 2020-04-23 | ||
Line 19 | 59.14 km (36.75 mi) | 14 | 6 | A | 2022-09-22 | ||
Line 1 | Harbin | 26.27 km (16.32 mi) | 23 | 6 | B2 | 2013-09-26 | |
Line 2 | 28.19 km (17.52 mi) | 19 | 6 | B2 | 2021-09-19 | ||
Line 3 | 28.71 km (17.84 mi) | 28 | 6 | B2 | 2017-01-26 | ||
Line 1 | Hefei | 29.16 km (18.12 mi) [36] | 26 | 6 | B2 | 2016-12-26 | |
Line 2 | 42.76 km (26.57 mi) [46] | 35 | 6 | B2 | 2017-12-26 | ||
Line 3 | 48.5 km (30.1 mi) [71] | 40 | 6 | B | 2019-12-26 [71] | ||
Line 4 | 55.4 km (34.4 mi) | 38 | 6 | B | 2021-12-26 | ||
Line 5 | 40.7 km (25.3 mi) | 33 | 6 | B | 2020-12-26 | ||
Line 1 | Hohhot | 21.719 km (13.5 mi) [72] | 20 | 6 | B | 2019-12-29 | |
Line 2 | 27.32 km (17.0 mi) [73] | 24 | 6 | B | 2020-10-01 [73] | ||
Airport Express | Hong Kong | 35.2 km (21.9 mi) | 5 | 8 | A (airport version, two doors per car, max 140km/h) | 1998-07-06 | |
Disneyland Resort line | 3.3 km (2.1 mi) | 2 | 4 | A (three doors per car) | 2005-08-01 | ||
East Rail line | 47.5 km (29.5 mi) | 16 | 9 | Special size (24.1 meters long, 3.22m wide, max 140km/h) | 1984-02-27 [H 2] | ||
Island line | 16.3 km (10.1 mi) | 17 | 8 | A | 1985-05-31 | ||
Kwun Tong line | 17.4 km (10.8 mi) | 17 | 8 | A | 1979-10-01 | ||
South Island line | 7.4 km (4.6 mi) | 5 | 3 | A | 2016-12-28 | ||
Tseung Kwan O line | 12.3 km (7.6 mi) | 8 | 8 | A | 2002-08-04 | ||
Tsuen Wan line | 16.0 km (9.9 mi) | 16 | 8 | A | 1979-12-31 | ||
Tuen Ma line | 56.2 km (34.9 mi) [74] | 27 | 8 | KCR Size (24.1 meters long, 3.1 meters wide, max 160km/h) | 2003-12-20 | ||
Tung Chung line | 31.1 km (19.3 mi) | 8 | 8 | A (maximum140km/h) | 1998-06-21 | ||
Line 1 | Jinan | 26.27 km (16.32 mi) | 11 | 4 | B1 | 2019-04-01 | |
Line 2 | 36.39 km (22.61 mi) | 19 | 6 | B1 | 2021-03-26 | ||
Line 3 | 21.592 km (13.417 mi) | 12 | 6 | B | 2019-12-28 [75] | ||
Jinyi Line | Jinhua | 58.071 km (36.084 mi) | 17 | 6 | B | 2022-08-30 | |
Yidong Line | 48.38 km (30.06 mi) | 15 | 6 | B | 2022-12-28 | ||
Line 1 | Kunming | 34.0 km (21.1 mi) [36] | 22 | 6 | B1 | 2013-05-20 | |
Line 2 | 12.4 km (7.7 mi) [36] | 14 | 6 | B1 | 2014-04-30 | ||
Line 3 | 23.36 km (14.52 mi) [46] | 20 | 6 | B1 | 2017-08-29 | ||
Line 4 | 43.4 km (27.0 mi) | 29 | 6 | B1 | 2020-09-23 | ||
Line 5 | 26.45 km (16.44 mi) | 22 | 6 | B1 | 2022-06-29 | ||
Line 6 | 25.3 km (15.7 mi) | 8 | 6 | B1 | 2012-06-28 | ||
Line 1 | Lanzhou | 25.9 km (16.1 mi) [26] | 20 | 6 | A | 2019-06-23 | |
Line 2 | 9.06 km (5.63 mi) | 9 | 6 | A | 2023-06-29 | ||
Line 1 | Luoyang | 25.342 km (15.747 mi) | 19 | 6 | B | 2021-03-28 | |
Line 2 | 18.216 km (11.319 mi) | 15 | 6 | B | 2021-12-26 | ||
Taipa line | Macau | 12.5 km (7.8 mi) [27] | 12 | 2 (max 4 in future) | P | 2019-12-10 [27] | |
Line 1 | Nanchang | 28.74 km (17.86 mi) [36] | 24 | 6 | B2 | 2015-12-26 | |
Line 2 | 31.51 km (19.58 mi) [76] | 28 | 6 | B2 | 2017-08-18 | ||
Line 3 | 28.5 km (17.7 mi) [77] | 22 | 6 | B2 | 2020-12-26 | ||
Line 4 | 39.6 km (24.6 mi) | 29 | 6 | B2 | 2021-12-26 | ||
Line 1 | Nanjing | 45.44 km (28.24 mi) [36] | 32 | 6 | A | 2005-09-03 | |
Line 2 | 43.35 km (26.94 mi) [36] | 30 | 6 | A | 2010-05-28 | ||
Line 3 | 44.87 km (27.88 mi) [36] | 29 | 6 | A | 2015-04-01 | ||
Line 4 | 33.75 km (20.97 mi) [46] | 18 | 6 | B2 | 2017-01-18 | ||
Line 7 | 24.50 km (15.22 mi) [46] | 19 | 6 | B2 | 2022-12-28 | ||
Line 10 | 21.6 km (13.4 mi) [36] | 14 | 6 | A | 2014-07-01 | ||
Line S1 | 36.32 km (22.57 mi) [36] | 9 | 6 | B2 | 2014-07-01 | ||
Line S3 | 36.26 km (22.53 mi) [46] | 19 | 6 | B2 | 2017-12-06 | ||
Line S4 | 46.2 km (28.7 mi) | 10 | 4 | D | 2023-06-28 | ||
Line S6 | 43.59 km (27.09 mi) | 13 | 4 | B2 | 2021-12-28 | ||
Line S7 | 28.87 km (17.94 mi) | 9 | 4 | B2 | 2018-05-26 | ||
Line S8 | 47.29 km (29.38 mi) [36] | 19 | 4 | B2 | 2014-08-01 | ||
Line S9 | 52.39 km (32.55 mi) [46] | 6 | 3 | B2 | 2017-12-30 | ||
Line 1 | Nanning | 32.1 km (19.9 mi) [36] | 25 | 6 | B2 | 2016-06-28 | |
Line 2 | 27.5 km (17.1 mi) [46] | 23 | 6 | B2 | 2017-12-28 | ||
Line 3 | 27.9 km (17.3 mi) [78] | 23 | 6 | B2 | 2019-06-06 | ||
Line 4 | 20.7 km (12.9 mi) | 16 | 6 | B2 | 2020-11-23 | ||
Line 5 | 20.2 km (12.6 mi) [79] | 17 | 6 | B2 | 2021-12-16 [79] | ||
Line 1 | Nantong | 39.182 km (24.347 mi) | 28 | 6 | B | 2022-11-10 | |
Line 2 | 20.85 km (12.96 mi) | 17 | 6 | B | 2023-12-27 | ||
Line 1 | Ningbo | 46.17 km (28.69 mi) [36] | 29 | 6 | B2 | 2014-05-30 | |
Line 2 | 36.85 km (22.90 mi) | 27 | 6 | B2 | 2015-09-26 | ||
Line 3 | 38.63 km (24.00 mi) [80] | 24 | 6 | B2 | 2019-06-30 | ||
Line 4 | 35.95 km (22.34 mi) | 25 | 6 | B2 | 2020-12-23 | ||
Line 5 | 27.6 km (17.1 mi) | 22 | 6 | B2 | 2021-12-28 | ||
Line 1 | Qingdao | 60.11 km (37.35 mi) | 41 | 6 | B1 | 2020-12-24 | |
Line 2 | 25.09 km (15.59 mi) | 22 | 6 | B1 | 2017-12-10 | ||
Line 3 | 24.95 km (15.50 mi) [36] | 22 | 6 | B1 | 2015-12-16 | ||
Line 4 | 30.71 km (19.08 mi) | 25 | 6 | B1 | 2022-12-26 | ||
Line 6 | 30.762 km (19.115 mi) [81] [82] | 21 | 6 | B1 | 2024-04-26 [83] | ||
Line 8 | 49.61 km (30.83 mi) | 11 | 6 | B1 | 2020-12-24 | ||
Line 11 | 58.35 km (36.26 mi) | 22 | 4 | B1 | 2018-04-23 | ||
Line 13 | 69.63 km (43.27 mi) | 23 | 4 | B1 | 2018-12-26 | ||
Line 1 | Shanghai | 36.76 km (22.84 mi) [36] | 28 | 8 | A | 1993-05-28 | |
Line 2 | 59.71 km (37.10 mi) [36] | 30 | 8 | A | 2000-06-11 | ||
Line 3 | 40.12 km (24.93 mi) [36] | 29 | 6 | A | 2000-12-26 | ||
Line 4 | 33.81 km (21.01 mi) [36] | 26 | 6 | A | 2005-12-31 | ||
Line 5 | 32.73 km (20.34 mi) [36] | 19 | 4/6 | C (High-floor heavy rail) | 2003-11-25 | ||
Line 6 | 32.54 km (20.22 mi) [36] | 28 | 4 | C (High-floor heavy rail) | 2007-12-29 | ||
Line 7 | 43.13 km (26.80 mi) [36] | 33 | 6 | A | 2009-12-05 | ||
Line 8 | 36.73 km (22.82 mi) [36] | 30 | 6/7 | C (High-floor heavy rail) | 2007-12-29 | ||
Line 9 | 63.80 km (39.64 mi) [36] [46] | 35 | 6 | A | 2007-12-29 | ||
Line 10 | 44.94 km (27.92 mi) [36] | 37 | 6 | A | 2010-04-10 | ||
Line 11 | 79.27 km (49.26 mi) [36] | 39 | 6 | A | 2009-12-31 | ||
Line 12 | 39.49 km (24.54 mi) [36] | 32 | 6 | A | 2013-12-29 | ||
Line 13 | 38.27 km (23.78 mi) [36] | 31 | 6 | A | 2012-12-30 | ||
Line 14 | 38.18 km (23.72 mi) | 30 | 8 | A | 2021-12-30 | ||
Line 15 | 41.22 km (25.61 mi) | 30 | 6 | A | 2021-01-23 | ||
Line 16 | 57.80 km (35.92 mi) [36] | 13 | 3/6 | A | 2013-12-29 | ||
Line 17 | 34.72 km (21.57 mi) [36] | 13 | 6 | A | 2017-12-30 | ||
Line 18 | 36.50 km (22.68 mi) | 26 | 6 | A | 2020-12-26 | ||
Pujiang line | 6.60 km (4.10 mi) | 6 | 4 | P | 2018-03-31 | ||
Maglev line | Shanghai ML | 29.863 km (18.556 mi) [36] | 2 | 5 | MH | 2004-01-01 | |
Line 1 | Shaoxing | 51.2 km (31.8 mi) [30] | 30 | 6 | B | 2021-06-28 [30] | |
Line 2 | 10.73 km (6.67 mi) | 9 | 4 | B | 2023-07-26 | ||
Line 1 | Shenyang | 27.80 km (17.27 mi) [36] | 22 | 6 | B2 | 2009-09-23 | |
Line 2 | 45.58 km (28.32 mi) [36] | 33 | 6 | B2 | 2012-01-08 | ||
Line 4 | 34.112 km (21.196 mi) | 23 | 6 | B2 | 2023-09-29 | ||
Line 9 | 28.996 km (18.017 mi) [84] | 23 | 6 | B2 | 2019-05-25 | ||
Line 10 | 27.21 km (16.91 mi) | 21 | 6 | B2 | 2020-04-29 [85] | ||
Line 1 | Shenzhen | 41.04 km (25.50 mi) [36] | 30 | 6 | A | 2004-12-28 | |
Line 2 | 39.78 km (24.72 mi) [36] | 32 | 6 | A | 2010-12-08 | ||
Line 3 | 43.45 km (27.00 mi) [36] | 31 | 6 | B1 | 2010-12-28 | ||
Line 4 | 31.3 km (19.4 mi) [36] | 23 | 6 | A | 2004-12-28 | ||
Line 5 | 47.393 km (29.449 mi) [86] | 34 | 6 | A | 2011-06-22 | ||
Line 6 | 49.4 km (30.7 mi) | 27 | 6 | A | 2020-08-18 [87] | ||
Line 6B | 6.13 km (3.81 mi) | 4 | 6 | B | 2022-11-28 | ||
Line 7 | 30.173 km (18.749 mi) [36] | 27 | 6 | A | 2016-10-28 | ||
Line 8 | 20.38 km (12.66 mi) | 11 | 6 | A | 2020-10-28 | ||
Line 9 | 36.18 km (22.48 mi) | 32 | 6 | A | 2016-10-28 | ||
Line 10 | 29.34 km (18.23 mi) | 24 | 8 | A | 2020-08-18 [87] | ||
Line 11 | 53.14 km (33.02 mi) [36] | 19 | 8 | A | 2016-06-28 | ||
Line 12 | 40.56 km (25.20 mi) | 33 | 6 | A | 2022-11-28 | ||
Line 14 | 50.34 km (31.28 mi) | 18 | 8 | A | 2022-10-28 | ||
Line 16 | 29.20 km (18.14 mi) | 24 | 6 | A | 2022-12-28 | ||
Line 20 | 8.43 km (5.24 mi) | 5 | 8 | A | 2021-12-28 | ||
Line 1 | Shijiazhuang | 34.3 km (21.3 mi) | 26 | 6 | A | 2017-06-26 | |
Line 2 | 15.5 km (9.6 mi) [88] | 15 | 6 | A | 2020-08-26 [88] | ||
Line 3 | 26.7 km (16.6 mi) | 22 | 6 | A | 2017-06-26 | ||
Line 1 | Suzhou | 25.739 km (15.993 mi) [36] | 24 | 4 | B1 | 2012-04-28 | |
Line 2 | 40.4 km (25.1 mi) [36] | 35 | 5 | B1 | 2013-12-28 | ||
Line 3 | 45.272 km (28.1 mi) [89] | 37 | 6 | B1 | 2019-12-25 [90] | ||
Line 4 | 52.8 km (32.8 mi) [46] | 38 | 6 | B1 | 2017-04-15 | ||
Line 5 | 44.1 km (27.4 mi) | 34 | 6 | B | 2021-06-29 | ||
Line 11 | 41.27 km (25.64 mi) | 28 | 6 | B | 2023-06-24 | ||
Line 2 | Taiyuan | 23.647 km (14.694 mi) | 23 | 6 | A | 2020-12-26 | |
Line S1 | Taizhou | 52.396 km (32.557 mi) | 15 | 4 | D | 2022-12-28 | |
Line 1 | Tianjin | 42.227 km (26.2 mi) | 28 | 6 | B1 | 1980-08-10 | |
Line 2 | 27.157 km (16.875 mi) [36] | 20 | 6 | B1 | 2012-07-01 | ||
Line 3 | 33.6 km (20.9 mi) [36] | 26 | 6 | B1 | 2012-10-01 | ||
Line 4 | 19.4 km (12.1 mi) | 14 | 6 | B2 | 2021-12-28 | ||
Line 5 | 34.8 km (21.6 mi) [91] [92] | 28 | 6 | B2 | 2018-10-22 | ||
Line 6 | 43.6 km (27.1 mi) [36] | 39 | 6 | B2 | 2016-08-06 | ||
Line 8 | 13.42 km (8.34 mi) | 9 | 6 | A | 2021-12-28 | ||
Line 9 | 52.759 km (32.783 mi) [36] | 21 | 4 | B2 | 2004-03-28 | ||
Line 10 | 21.18 km (13.16 mi) | 21 | 6 | B | 2022-11-18 | ||
Line 11 | 12.27 km (7.62 mi) | 11 | 6 | B | 2023-12-28 | ||
Line 1 | ĂrĂŒmqi | 27.615 km (17.159 mi) | 21 | 6 | A | 2018-10-25 | |
Line S1 | Wenzhou | 53.507 km (33.248 mi) | 18 | 4 | D | 2019-01-23 | |
Line S2 | 62.945 km (39.112 mi) | 20 | 4 | D | 2023-08-26 | ||
Line 1 | Wuhan | 37.936 km (23.572 mi) [36] [46] | 32 | 4 | B1 | 2004-07-28 | |
Line 2 | 60.304 km (37.471 mi) | 38 | 6 | B1 | 2012-12-28 | ||
Line 3 | 29.660 km (18.430 mi) [36] | 24 | 6 | B1 | 2015-12-28 | ||
Line 4 | 49.693 km (30.878 mi) | 37 | 6 | B1 | 2013-12-28 | ||
Line 5 | 37.216 km (23.125 mi) | 27 | 6 | A | 2021-12-26 | ||
Line 6 | 42.537 km (26.431 mi) [36] | 32 | 6 | A | 2016-12-28 | ||
Line 7 | 67.853 km (42.162 mi) | 33 | 6 | A | 2018-10-01 | ||
Line 8 | 38.197 km (23.735 mi) [46] | 26 | 6 | A | 2017-12-26 | ||
Line 11 | 22.530 km (13.999 mi) | 14 | 6 | A | 2018-10-01 | ||
Line 16 | 36.458 km (22.654 mi) | 14 | 4 | A | 2021-12-26 | ||
Line 19 | 23.3 km (14.5 mi) | 7 | 6 | A | 2023-12-30 | ||
Yangluo line | 34.575 km (21.484 mi) [46] | 16 | 4 | A | 2017-12-26 | ||
Line 1 | Wuhu | 30.46 km (18.93 mi) | 25 | 6 | HL | 2021-11-03 [93] | |
Line 2 | 15.787 km (9.810 mi) | 11 | 4 | HL | 2021-12-28 | ||
Line 1 | Wuxi | 65.007 km (40.393 mi) | 36 | 6 | B1 | 2014-07-01 | |
Line 2 | 26.3 km (16.3 mi) [94] [36] | 21 | 6 | B1 | 2014-12-28 | ||
Line 3 | 28.493 km (17.70 mi) [95] | 21 | 6 | B | 2020-10-28 | ||
Line 4 | 25.4 km (15.8 mi) | 18 | 6 | B | 2021-12-17 | ||
Line 1 | Xi'an | 42.20 km (26.22 mi) [96] | 30 | 6 | B2 | 2013-09-15 | |
Line 2 | 33.637 km (20.901 mi) [97] | 25 | 6 | B2 | 2011-09-16 | ||
Line 3 | 39.15 km (24.33 mi) [36] | 26 | 6 | B2 | 2016-11-08 | ||
Line 4 | 35.2 km (21.9 mi) | 29 | 6 | B2 | 2018-12-26 | ||
Line 5 | 41.6 km (25.8 mi) | 31 | 6 | B2 | 2020-12-28 | ||
Line 6 | 35.1 km (21.8 mi) | 30 | 6 | B2 | 2020-12-28 | ||
Line 9 | 25.296 km (15.718 mi) | 15 | 6 | B2 | 2020-12-28 | ||
Line 14 | 42.96 km (26.69 mi) | 17 | 6 | B2 | 2019-09-29 | ||
Line 16 | 15.03 km (9.34 mi) | 9 | 6 | B2 | 2023-06-27 | ||
Line 1 | Xiamen | 30.30 km (18.83 mi) [46] | 24 | 6 | B2 | 2017-12-31 | |
Line 2 | 41.64 km (25.87 mi) | 30 | 6 | B2 | 2019-12-25 [98] | ||
Line 3 | 26.52 km (16.48 mi) [99] | 21 | 4 | B | 2021-06-25 [99] | ||
Line 1 | Xuzhou | 21.967 km (13.650 mi) [100] | 18 | 6 | B | 2019-09-28 | |
Line 2 | 24.25 km (15.07 mi) [101] | 20 | 6 | B | 2020-11-28 | ||
Line 3 | 18.13 km (11.27 mi) [102] | 16 | 6 | B | 2021-06-28 [102] | ||
Line 1 | Zhengzhou | 41.21 km (25.61 mi) [103] | 30 | 6 | B2 | 2013-12-28 [104] | |
Line 2 | 30.85 km (19.17 mi) [105] [106] | 22 | 6 | B2 | 2016-08-19 | ||
Line 3 | 31.813 km (19.768 mi) | 25 | 6 | A | 2020-12-26 | ||
Line 4 | 29.287 km (18.2 mi) | 27 | 6 | B | 2020-12-26 | ||
Line 5 | 40.4 km (25.1 mi) [107] | 32 | 6 | A | 2019-05-20 | ||
Line 6 | 16.727 km (10.394 mi) | 10 | 6 | A | 2022-09-30 | ||
Line 10 | 21.864 km (13.586 mi) | 12 | 6 | A | 2023-09-28 | ||
Line 12 | 16.538 km (10.276 mi) | 11 | 6 | B | 2023-12-20 | ||
Line 14 | 7.455 km (4.632 mi) [108] | 4 | 6 | B | 2019-09-19 | ||
Zhengxu Line | 67.13 km (41.71 mi) | 26 | 4 | B | 2023-12-28 | ||
Chengjiao line | 40.84 km (25.38 mi) | 18 | 6 | B2 | 2017-01-12 |
â Lines / extensions in operation.
â Lines / extensions under testing.
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hefei Metro ćè„ć°é |
Locale | Hefei |
2 East extension |
|||
Began operation | 26 December 2016 | |||||
Lines in operation | 5 | |||||
No. of stations | 136 | |||||
Network length | 176.15 km (109 mi) | |||||
Ridership | 1,230,200 (31 December 2020 record). 179.8 million (2019) | |||||
Wuhu Rail Transit èæč蜚éäș€é |
Locale | Wuhu | ||||
Began operation | 3 November 2021 | |||||
Lines in operation | 2 | |||||
No. of stations | 35 | |||||
Network length | 46.25 km (29 mi) | |||||
Ridership | N/A | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Beijing Subway (BGD) ćäșŹć°é |
Locale | Beijing & Langfang |
1
2
4
5
6
7
8
9
10
11
13
14
15
16
17
19
S1 |
1 Military section renovation and branch |
[Note 1] [215] [216] [217] | |
Began operation | 1 October 1969 | |||||
Lines in operation | 25 | |||||
No. of stations | 369 ( List) | |||||
Network length | 785.7 km (488.2 mi) [h] | |||||
Ridership | 10,824,301 (2019 daily avg.)
[20] 13,738,800 (12 July 2019 record). 3,950.9 million (2019). | |||||
Shijiazhuang Metro çłćź¶ćșć°é |
Locale | Shijiazhuang | ||||
Began operation | 26 June 2017 | |||||
Lines in operation | 3 | |||||
No. of stations | 60 ( List) | |||||
Network length | 76.5 km (47.5 mi) [31] | |||||
Ridership | 479,900 (31 December 2020 record). 95.7 million (2019). | |||||
Tianjin Metro ć€©æŽ„ć°é |
Locale | Tianjin |
4 Northern Section |
[Note 2] | ||
Began operation | 30 September 2003 (10 August 1980 old system) | |||||
Lines in operation | 9 | |||||
No. of stations | 181 ( List) | |||||
Network length | 288.25 km (179.1 mi) | |||||
Ridership | 1,869,000 (31 December 2019 record). 523.5 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Chengdu Metro æéœć°é |
Locale | Chengdu | ||||
Began operation | 27 September 2010 | |||||
Lines in operation | 12 | |||||
No. of stations | 284 ( List) | |||||
Network length | 518.5 km (322.2 mi) | |||||
Ridership | 5,649,500 (daily record) 1398 million (2019 annual) | |||||
Chongqing Rail Transit (CRT) Chongqing Metro éćș蜚éäș€é |
Locale | Chongqing |
4 Phase 2 & Western extension |
[218] [219] [220] | ||
Began operation | 6 November 2004 | |||||
Lines in operation | 10 | |||||
No. of stations | 238 ( List) | |||||
Network length | 485.02 km (301 mi) | |||||
Ridership | 3,872,000 (peak day) 2,846,356 (daily avg.) 1038.9 million (2019) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Fuzhou Metro çŠć·ć°é |
Locale | Fuzhou | 1 2 4 5 6 |
2 Eastern extension |
||
Began operation | 18 May 2016 | |||||
Lines in operation | 5 | |||||
No. of stations | 90 | |||||
Network length | 139 km (86 mi) | |||||
Ridership | 553,600 (31 December 2020 Record) 227.766 million (2023 annual) | |||||
Xiamen Metro (AMTR) ćŠéšć°é |
Locale | Xiamen | ||||
Began operation | 31 December 2017 | |||||
Lines in operation | 3 | |||||
No. of stations | 70 | |||||
Network length | 98.4 km (61.1 mi) | |||||
Ridership | 944,200 (2 May 2021 Record) 246.4158 million (2023 annual) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Lanzhou Metro ć °ć·èœšéäș€é |
Locale | Lanzhou | ||||
Began operation | 23 June 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 27 | |||||
Network length | 34.96 km (21.7 mi) [26] | |||||
Ridership | 301,300 (1 Oktober 2020 Record) 32.4 million (2019 annual) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dongguan Rail Transit Dongguan Metro äžè蜚éäș€é |
Locale | Dongguan | ||||
Began operation | 27 May 2016 | |||||
Lines in operation | 1 | |||||
No. of stations | 15 | |||||
Network length | 37.743 km (23 mi) | |||||
Ridership | 300,300 (1 Oktober 2019 record). 53.6 million (2019). | |||||
Foshan Metro (FMetro) äœć±±ć°é |
Locale | Foshan & Guangzhou |
[Note 3] [Note 4] | |||
Began operation | 3 November 2010 | |||||
Lines in operation | 3 | |||||
No. of stations | 61 ( List) | |||||
Network length | 112.7 km (70 mi) | |||||
Ridership | 677,900 (31 December 2020 record). | |||||
Guangzhou Metro ćčżć·ć°é |
Locale | Guangzhou |
3 Eastern extension |
[Note 3] [221] [222] [223] | ||
Began operation | 28 June 1997 | |||||
Lines in operation | 16 | |||||
No. of stations | 261 ( List) | |||||
Network length | 621.05 km (385.9 mi) | |||||
Ridership | 11,569,400 (31 December 2019 record). 3305.9 million (2019 annual) | |||||
Macau Light Rapid Transit (Metro Ligeiro de Macau, MLM) æŸłéèŒè» |
Locale | Macau | Taipa |
Seac Pai Van Hengqin |
||
Began operation | 10 December 2019 [27] | |||||
Lines in operation | 1 | |||||
No. of stations | 11 | |||||
Network length | 9.3 km (6 mi) [27] | |||||
Ridership | 48,700 (25 December 2019 record). 0.6 million (2019) | |||||
Mass Transit Railway (MTR) æžŻé” Including KowloonâCanton Railway |
Locale | Hong Kong |
Kwun Tong line Tuen Ma line South Island line Tung Chung line East Rail line Island line Tseung Kwan O line Tsuen Wan line Disneyland Resort line Airport Express |
Tuen Ma line Extension Tung Chung line Extension
|
[Note 5] | |
Began operation | 2 December 2007 (1 October 1979 old MTR) (1 October 1910 KCR) | |||||
Lines in operation | 10 | |||||
No. of stations | 99 ( List) | |||||
Network length | 209.0 km (129.9 mi) | |||||
Ridership | 8,864,700 (22 January 2020 record). 3128.1 million (2019 annual) | |||||
Shenzhen Metro æ·±ćłć°é |
Locale | Shenzhen |
3 East Ext |
[224] [225] [226] | ||
Began operation | 28 December 2004 | |||||
Lines in operation | 16 | |||||
No. of stations | 303 ( List) | |||||
Network length | 547.42 km (340 mi) | |||||
Ridership | 7,708,300 (31 December 2010). 2017.6 million (2019 annual) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanning Metro ććźć°é |
Locale | Nanning |
4 Eastern extension |
|||
Began operation | 28 June 2016 | |||||
Lines in operation | 5 | |||||
No. of stations | 93 | |||||
Network length | 128.2 km (80 mi) | |||||
Ridership | 1,432,600 (1 January 2021 record). 273.3 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Guiyang Metro (GYURT) 莔éłć°éïŒèŽ”éłèœšéäș€éïŒ |
Locale | Guiyang | S1 | |||
Began operation | 28 December 2017 | |||||
Lines in operation | 2 | |||||
No. of stations | 55 | |||||
Network length | 75.7 km (47.0 mi) | |||||
Ridership | 183,000 (2 December 2018 record). 50.6 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Harbin Metro ćć°æ»šć°é |
Locale | Harbin |
3 Phase 2 |
|||
Began operation | 26 September 2013 | |||||
Lines in operation | 3 | |||||
No. of stations | 62 | |||||
Network length | 79.4 km (49 mi) | |||||
Ridership | 392,400 (31 December 2019). 103.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Luoyang Subway æŽéłć°é |
Locale | Luoyang | 1 2 | N/A | ||
Began operation | 28 March 2021 | |||||
Lines in operation | 2 | |||||
No. of stations | 33 | |||||
Network length | 43.558 km (27 mi) | |||||
Ridership | ||||||
Zhengzhou Metro éć·ć°é |
Locale | Zhengzhou | ||||
Began operation | 28 December 2013 | |||||
Lines in operation | 8 | |||||
No. of stations | 143 | |||||
Network length | 232.5 km (144 mi) | |||||
Ridership | 2,221,760 (31 December 2020 record). 411.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Wuhan Metro æŠæ±ć°é |
Locale | Wuhan |
3 Southern extension
6 Southwest extension |
[227] [228] | ||
Began operation | 28 July 2004 | |||||
Lines in operation | 11 | |||||
No. of stations | 255 [34] ( List) | |||||
Network length | 460.944 km (286 mi) [34] | |||||
Ridership | 1229 million (2019 annual)
[20] 4,456,200 (4 April 2019 Peak) [229] | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changsha Maglev Express éżæČçŁæ”źćż«çșż |
Locale | Changsha | N/A | |||
Began operation | 6 May 2016 | |||||
Lines in operation | 1 | |||||
No. of stations | 3 | |||||
Network length | 18.55 km (12 mi) | |||||
Ridership | ||||||
Changsha Metro éżæČć°é |
Locale | Changsha |
1 Northern extension |
|||
Began operation | 29 April 2014 | |||||
Lines in operation | 6 | |||||
No. of stations | 135 | |||||
Network length | 207.9 km (129.2 mi) | |||||
Ridership | 2,656,900 (31 December 2020 record). 378.2 million (2020). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hohhot Metro ćŒć攩çčć°é |
Locale | Hohhot | 1 2 | N/A | ||
Began operation | 29 December 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 43 | |||||
Network length | 49.039 km (30.5 mi) | |||||
Ridership | 239,400 (31 December 2020 record). 0.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanchang Metro ćæć°é |
Locale | Nanchang | 1 2 3 4 | |||
Began operation | 26 December 2015 | |||||
Lines in operation | 4 | |||||
No. of stations | 94 | |||||
Network length | 128.3 km (80 mi) | |||||
Ridership | 1,447,000 (31 December 2020 record). 174.9 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changchun Rail Transit éżæ„蜚éäș€é |
Locale | Changchun | ||||
Began operation | 30 October 2002 | |||||
Lines in operation | 5 | |||||
No. of stations | 93 | |||||
Network length | 111.2 km (69 mi) | |||||
Ridership | 938,000 (20 December 2019). 213.9 million (2019 annual) [21] | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dalian Metro 性èżć°é |
Locale | Dalian | [230] | |||
Began operation | 8 November 2002 | |||||
Lines in operation | 6 | |||||
No. of stations | 99 ( List) | |||||
Network length | 237.74 km (148 mi) [57] | |||||
Ridership | 724,900 (7 August 2019 record). 203.9 million (2019). | |||||
Shenyang Metro æČéłć°é |
Locale | Shenyang | ||||
Began operation | 27 September 2010 | |||||
Lines in operation | 4 | |||||
No. of stations | 85 ( List) | |||||
Network length | 115.9 km (72 mi) | |||||
Ridership | 1,375,300 (15 November 2019 record). 358.6 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Xi'an Metro è„żćźć°é |
Locale | Xi'an & Xianyang | ||||
Began operation | 16 September 2011 | |||||
Lines in operation | 9 | |||||
No. of stations | 184 | |||||
Network length | 300.4 km (187 mi) | |||||
Ridership | 4,073,041 (31 December 2020). 945.4 (2019 annual). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Jinan Metro æ”ćć°é |
Locale | Jinan | ||||
Began operation | 1 April 2019 | |||||
Lines in operation | 3 | |||||
No. of stations | 40 | |||||
Network length | 84.25 km (52 mi) | |||||
Ridership | 66,800 (31 December 2020 record). 5.75 million (2019). | |||||
Qingdao Metro éćČć°é |
Locale | Qingdao |
2 Phases 1 & 2 adjustments |
|||
Began operation | 16 December 2015 | |||||
Lines in operation | 7 | |||||
No. of stations | 146 | |||||
Network length | 315.86 km (196.3 mi) | |||||
Ridership | (2 May 2021 record). 187.5 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changzhou Metro ćžžć·ć°é |
Locale | Changzhou | 1 2 | 5 | ||
Began operation | 21 September 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 43 | |||||
Network length | 54.03 km (34 mi) | |||||
Ridership | 243,000 (31 October 2019 record). 10.3 million (2019). | |||||
Hangzhou Metro æć·ć°é |
Locale | Hangzhou |
3 Eastern extension |
|||
Began operation | 24 November 2012 | |||||
Lines in operation | 12 | |||||
No. of stations | 251 ( List) | |||||
Network length | 516.2 km (321 mi) | |||||
Ridership | 3,141,400 (31 December 2020 record). 634 million (2019). | |||||
Jinhua Rail Transit éć蜚éäș€é |
Locale | Jinhua |
N/A |
|||
Began operation | 30 August 2022 | |||||
Lines in operation | 2 | |||||
No. of stations | 30 | |||||
Network length | 106.45 km (66 mi) | |||||
Ridership | N/A | |||||
Nanjing Metro ćäșŹć°é |
Locale | Nanjing |
1 Northern extension |
[231] [232] [233] [234] | ||
Began operation | 3 September 2005 | |||||
Lines in operation | 13 | |||||
No. of stations | 201 ( List) | |||||
Network length | 498.66 km (310 mi) | |||||
Ridership | 4,219,000 (31 December 2020 record). 1151.9 million (2019). | |||||
Nantong Rail Transit ćé蜚éäș€é |
Locale | Nantong |
1 South extension |
|||
Began operation | 10 November 2022 | |||||
Lines in operation | 1 | |||||
No. of stations | 28 | |||||
Network length | 39.182 km (24 mi) | |||||
Ridership | N/A | |||||
Ningbo Rail Transit Ningbo Metro ćźæłąèœšéäș€é |
Locale | Ningbo | ||||
Began operation | 30 May 2014 | |||||
Lines in operation | 6 | |||||
No. of stations | 116 | |||||
Network length | 185.36 km (115.18 mi) | |||||
Ridership | 1,014,600 (31 December 2020 record). 167.2 million (2019). | |||||
Shanghai Maglev Train (SMT) äžæ”·çŁæ”źç€șèèżè„çșż |
Locale | Shanghai | N/A | |||
Began operation | 31 December 2002 | |||||
Lines in operation | 1 | |||||
No. of stations | 2 | |||||
Network length | 29.863 km (19 mi) | |||||
Ridership | ||||||
Shanghai Metro äžæ”·ć°é |
Locale | Shanghai (and Kunshan) |
2 Western extension |
[235] [236] [237] [238] | ||
Began operation | 28 May 1993 | |||||
Lines in operation | 19 | |||||
No. of stations | 396 [239] ( List) | |||||
Network length | 802.2 km (498.5 mi) | |||||
Ridership | 13,294,400 (8 March 2019 record). 3880.1 million (2019). | |||||
Shaoxing Metro ç»ć Žèœšéäș€é |
Locale | Shaoxing | 1 2 |
2 Phase 2 |
||
Began operation | 28 June 2021 [30] | |||||
Lines in operation | 2 | |||||
No. of stations | 36 | |||||
Network length | 57.83 km (36 mi) | |||||
Ridership | ||||||
Suzhou Rail Transit Suzhou Metro èć·èœšéäș€é |
Locale | Suzhou | ||||
Began operation | 28 April 2012 | |||||
Lines in operation | 6 | |||||
No. of stations | 181 ( List) | |||||
Network length | 249.47 km (155 mi) | |||||
Ridership | 1,548,000 (2 May 2019 record). 363 million (2019). | |||||
Taizhou Rail Transit ć°ć·èœšéäș€é |
Locale | Taizhou | ||||
Began operation | 28 December 2022 | |||||
Lines in operation | 1 | |||||
No. of stations | 15 | |||||
Network length | 52.566 km (33 mi) | |||||
Ridership | N/A | |||||
Wenzhou Metro æž©ć·èœšéäș€é |
Locale | Wenzhou | ||||
Began operation | 23 January 2019 | |||||
Lines in operation | 1 | |||||
No. of stations | 18 | |||||
Network length | 53.507 km (33 mi) | |||||
Ridership | 71,800 (1 December 2020 not free record). 7.75 million (2019). | |||||
Wuxi Metro æ éĄć°é |
Locale | Wuxi | ||||
Began operation | 1 July 2014 | |||||
Lines in operation | 4 | |||||
No. of stations | 80 | |||||
Network length | 114.8 km (71 mi) | |||||
Ridership | 526,900 (19 December 2020 record). 109.5 million (2019). | |||||
Xuzhou Metro ćŸć·ć°é |
Locale | Xuzhou | ||||
Began operation | 28 September 2019 | |||||
Lines in operation | 3 | |||||
No. of stations | 51 | |||||
Network length | 64.35 km (40 mi) [35] | |||||
Ridership | 256,700 (31 December 2020 record). 7.5 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Taiyuan Metro ć€Șć蜚éäș€é |
Locale | Taiyuan | 2 | 1 | ||
Began operation | 26 December 2020 | |||||
Lines in operation | 1 | |||||
No. of stations | 23 | |||||
Network length | 23.647 km (15 mi) | |||||
Ridership | 216,100 (1 January 2021 record). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
ĂrĂŒmqi Metro äčéČæšéœć°é |
Locale | ĂrĂŒmqi | ||||
Began operation | 25 October 2018 | |||||
Lines in operation | 1 | |||||
No. of stations | 21 | |||||
Network length | 27.615 km (17 mi) | |||||
Ridership | 124,667 (13 October 2019 record). 25.57 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Kunming Metro ææć°é |
Locale | Kunming |
1 Northwestern extension
|
|||
Began operation | 28 June 2012 | |||||
Lines in operation | 6 | |||||
No. of stations | 103 | |||||
Network length | 164.3 km (102 mi) | |||||
Ridership | 811,800 (30 September 2020 record). 214.1 million (2019). | |||||
Notes
- In operation.
- Under test run.
Tram and light rail systems | ||||||||
---|---|---|---|---|---|---|---|---|
System | Locale | Length | Stations | Opened | ||||
Trams in Beijing ( Xijiao line and Yizhuang T1 line) | Beijing | 20.762 km (12.901 mi) | 20 | 2017-12-30 | ||||
Changchun Tram | Changchun | 12.759 km (7.928 mi) | 24 | 1941-11-01 | ||||
Changchun Rail Transit [i] | Changchun | 68.2 km (42.4 mi) | 62 | 2002-10-30 | ||||
Line 2 (Chengdu Tram) | Chengdu | 39.3 km (24.4 mi) | 35 | 2018-12-26 | ||||
Bishan SkyShuttle | Chongqing | 15.4 km (9.6 mi) | 15 | 2021-04-16 [142] | ||||
Dalian Tram | Dalian | 23.4 km (14.5 mi) | 37 | 1909-09-25 | ||||
Trams in Foshan ( Gaoming tram and Nanhai tram) | Foshan | 19.915 km (12.375 mi) [247] | 25 | 2019-12-30 [247] | ||||
Guangzhou Trams ( Haizhu Tram and Huangpu Tram Line 1) | Guangzhou | 22.0 km (13.7 mi) | 30 | 2014-12-31 | ||||
MTR Light Rail | Hong Kong | 36.2 km (22.5 mi) | 68 | 1988-09-18 | ||||
Hong Kong Tramways | Hong Kong | 30.0 km (18.6 mi) | 120 | 1904-07-30 | ||||
Huai'an Tram | Huai'an | 20.07 km (12.47 mi) | 23 | 2015-12-28 | ||||
Huangshi Rail Transit | Huangshi | 26.88 km (16.70 mi) | 28 | 2022-12-28 | ||||
Honghe tram | Mengzi | 13.3 km (8.3 mi) | 15 | 2020-10-01 | ||||
Jiaxing Tram | Jiaxing | 13.8 km (8.6 mi) [248] | 16 [248] | 2021-06-25 | ||||
Nanjing Tram | Nanjing | 16.86 km (10.48 mi) | 26 | 2014-08-01 | ||||
Qingdao Tram | Qingdao | 8.77 km (5.45 mi) | 12 | 2016-03-05 | ||||
Sanya Tram | Sanya | 8.37 km (5.20 mi) [249] | 15 | 2019-01-01 | ||||
Shanghai Songjiang Tram | Shanghai | 31.394 km (19.507 mi) | 45 | 2018-12-26 | ||||
Shenyang Tram | Shenyang | 65 km (40 mi) | 85 | 2013-08-31 | ||||
Shenzhen Tram | Shenzhen | 11.683 km (7.259 mi) | 20 | 2017-10-28 | ||||
Suzhou Tram | Suzhou | 44.36 km (27.56 mi) | 27 | 2014-10-26 | ||||
Tianshui Tram | Tianshui | 12.926 km (8.0 mi) | 11 | 2020-05-01 [250] | ||||
Wenshan Tram | Qiubei | 13.960 km (8.7 mi) [251] | 10 | 2021-05-15 | ||||
Trams in Wuhan | Wuhan | 53.9 km (33.5 mi) | 61 | 2017-07-28 | ||||
Wuyi Tram | Wuyi New Area ( Nanping) | 26.185 km (16.271 mi) [252] | 6 | 2022-01-01 [252] | ||||
Chongli Tram | Zhangjiakou | 1.6 km (0.99 mi) | 6 | 2022-02-04 |
Monorail/maglev systems | ||||||||
---|---|---|---|---|---|---|---|---|
System | Locale | Length | Stations | Opened | ||||
Line S1 (Beijing Subway) | Beijing | 10.2 km (6.3 mi) | 8 | 2017-12-30 | ||||
Changsha Maglev Express | Changsha | 18.55 km (11.5 mi) | 3 | 2016-05-06 | ||||
Chongqing Rail Transit ( Line 2 and Line 3) | Chongqing | 96.5 km (60.0 mi) | 68 | 2004-11-06 | ||||
Fenghuang Maglev | Fenghuang County | 9.121 km (5.7 mi) | 4 | 2022-07-30 | ||||
Liupanshui Tourism Monorail | Liupanshui | 11.0 km (6.8 mi) | 6 | 2019-??-?? | ||||
Shanghai maglev train | Shanghai | 29.86 km (18.6 mi) | 2 | 2002-12-31 | ||||
Wuhu Rail Transit | Wuhu | 46.2 km (28.7 mi) | 35 | 2021-11-03 | ||||
Xishui County Tourist Train | Xishui County | 11.5 km (7.1 mi) | 6 | 2020-??-?? | ||||
Yinchuan Flower Expo Park Cloud Rail | Yinchuan | 5.7 km (3.5 mi) | 8 | 2017-??-?? | ||||
Optics Valley Suspended Monorail Line | Wuhan | 10 km (6.2 mi) | 6 | 2023-09-23 |
Vehicle type | Length (m) | Width (m) | Capacity |
---|---|---|---|
Type A | 22.8 | 3.0-3.08 | 310 |
Type B [a] | 19.0 | 2.8-2.88 | 240 |
Type AS [b] | 19.0 | 3.0-3.08 | 254-266 |
Type AH [c] | 19.52 | 3.0-3.08 | 254 |
Type LB | 16.8 | 2.8 | 215-240 |
Type C [d] | 18.9-30.4 | 2.6 | 200-315 |
Type D | 22.0 | 3.3 | - |
çłćź¶ćș蜚éäș€éèżè„éçšć°ćąèł61.6ć Źé
èżè„éçš9.7ć ŹéïŒćŒéćć°äžæąææćčłçșżèŽŻéèżè„ăć±æ¶ïŒćäșŹććžèœšéäș€éçșżè·Żć ±èźĄ27æĄïŒèżè„æ»éçšèŸŸ807ć Źé
ćè”·äž°ć°ćșéć Źćșç«ïŒćèłæżć±±ćșèćșç«ăć šéż24.79ć ŹéïŒèźŸ11ćș§èœŠç«
30æ„èżć°ćŒéæżć±±çșżéæäžèłèćșçäžç«äžćșéŽïŒéżćșŠçșŠ2.2ć Źé
2ć·çșżèżè„éçšćąéż4.4ć ŹéïŒèŸŸć°24.9ć Źé
èżæć°æć „èŻèżè„çéŠéæź”è”·äșéœäŸŻèæșȘć汿ç«ïŒç»äșä»ć±±èșæŽČć€éç«ïŒć ±èźŸç«17ćș§ïŒć ¶äžéć±±ăæŽȘćĄè·Żç«ăćžć°æ±ç«äžșæąäčç«ăçșżè·Żć šéżçșŠ22.4ć ŹéïŒćäžșć°äžçșżïŒćŒèĄæ¶éŽçșŠ40ćé
6ć·çșżè”·äșæœćą©ç«ïŒæąäșäžćŻżç«ïŒć šéżçșŠ31.346ć ŹéïŒèźŸ16äžȘç«ïŒć ¶äžé«æ¶ç«1ćș§ïŒć°äžç«15ćș§
ćčżć·ćž2021ćčŽć件æ°çćźäșæŸç€șïŒ2021ćčŽćčżć·ć°ćäșćŒéèŻèżè„ć°é18ć·çșżć éæź”ïŒäžéĄ·æČ-ćŒæïŒ58.3ć ŹéïŒă22ć·çșżć éæź”ïŒçȘçŠșćčżćș-é怎ćČïŒ18.2ć ŹéïŒ
äžș9ć·çșżçäžæź”ïŒç±æąæ1ć·çșżäžŽćčłæŻçșżæćçŹç«èżè„ææïŒéżçșŠ12.5ć Źé
æŁçșżć šéż27.32km
汯銏ç·äžæçè”°ç·ç±çæșȘæČèłććŸ·ć ±12ćè»ç«...ć šç·é·ćșŠçŽ17ć Źé
5ć·çșżèżè„æ»éçšć°ć»¶éżèł47.393ć Źé
éć·ćžèœšéäș€é1ć·çșżć šéż41.2kmïŒèźŸç«30ćș§ïŒćäžșć°äžèœŠç«ăć ¶äžïŒ1ć·çșżäžæć·„çšçșżè·ŻéżçșŠ26.2kmïŒèźŸç«20ćș§...1ć·çșżäșæć·„çšçșżè·Żć šéżçșŠ15 kmïŒèźŸç«10ćș§...
ć šéżçșŠ14.2ć Źé
çșżè·Żć šéż9.7ć ŹéïŒćäžșć°äžçșż
18ć·çșżäžćČç«ïŒäžć«ïŒèłć€©ćșæșćșćç«æź”äșæĄçșżè·Żć°ćæ„ćŒéćæèżè„
6ć·çșżć šéżçșŠ68.88kmïŒć ±èźŸæ56ćș§èœŠç«
éæ”æ©ć Žć°ć€©ćșæ©ć Ž30ćéŸ-æéœć°é”19èç·äșæä»æ„/
5ć·çșżćć»¶äŒžæź”è”·äșććäžćżç«ïŒäžć«ïŒïŒæąäșæŠæžŻćè·Żç«ïŒçșżè·Żć šéż8.95ć Źé
çșżè·Żć šéżçșŠ28.22 kmïŒć ¶äžïŒé«æ¶çșżćć°éąçșż22.42 kmïŒć°äž5.8 kmïŒèźŸèœŠç«7ćș§
æŹæćłć°ćŒéèżè„23äžȘ蜊ç«ïŒæ°æĄ„ç«ăéźèœźæŻæžŻç«ăćźćŁæčç«3äžȘç«çčæäžćŒæŸ
éćșć°é9ć·çșżäșæć·„çš(ć Žç§ć€§éâè±çłæČ)çșżè·Żć šéżçșŠ7.8ć ŹéïŒć ±èźŸ5ćș§èœŠç«
éćș蜚éäș€é10ć·çșżäșæ(éČ€é±Œæ± èłćć Ą)ćććè”°ćïŒçșżè·Żć šéż6ć Źé
ć šéżçșŠ13.447ć米ïŒæ»æè”çșŠ99.01äșżć ïŒć šçșżć°äžïŒć ±èźŸ8ćș§èœŠç«
çșżè·Żć šéżçșŠ6.2km
æć·æșćș蜚éćż«çșżć·„çšè”·çčèæșȘç«ïŒç»çčéæ±ç«ïŒçșżè·Żéż59.14ć ŹéïŒć°äžçșżéżćșŠ47.105ć ŹéïŒé«æ¶æź”éżćșŠ12.034ć ŹéïŒć ¶äžäžæçŹé«éćć»ș10.266ć Źéăć šçșżć ±èźŸèœŠç«17ćș§ïŒć ¶äžé«æ¶ç«4ćș§ïŒć°äžç«13ćș§
çźćć°é3ć·çșżäžæć·„çšçșżè·Żć šéż5.45ć Źé
ćè„蜚éäș€é4ć·çșżć»¶éżçșżćźäș5æ1æ„10:00æŁćŒćŒéèżè„ïŒèżæćłçïŒè„è„żćłć°èżć „ćć°éæ¶ä»Łă4ć·çșżć滶çșżć šéż13.97ć Źé
äčäžçșżéŠéæź”éż26.8kmïŒè”·äșćäșç«ïŒç»ç±äčäčćœé ć莞ćăäžéłćžäž»ććșć°èŸŸäœèČéŠç«ïŒć ±æ11ćș§èœŠç«ïŒć ¶äžé«æ¶ç«6ćș§ïŒć°äžç«5ćș§
ć äžć·Čäș2012ćčŽ6æ28æ„ćŒéèżè„çć°é6ć·çșżäžæ18.018ć Źé
11ć·çșżçŠç°èłćČćŠććșéŽïŒçșżæź”ć šéż1.6ć Źé
ćčŽćșćæćŒéé«ćșćç«ăćæŽæç«ăćœć±è·Żç«ăäžæČœè·Żç« (Stations will open in this year: Gaozhuangzi, Beiyangcun, Guozhanlu, Donggulu.)
è„żæź”äžć ±10äžȘ蜊ç«ïŒçșŠ16.7ć Źé
æ»éż26.185km
This article may be
too long to read and navigate comfortably. (November 2023) |
Urban rail transit in China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and maglev. [1] Some classifications also include non-rail bus rapid transport.
As of April 2024, China has the world's longest urban rail transit system with 10,273.7 km (6,383.8 mi) of urban rail nationwide in 310 metro lines in 54 cities, accounting for 9 of the 10 longest metro systems, with the exceptions of the Moscow Metro. [2]
Half of the top 10 busiest metro systems are in China, [3] and the Beijing Subway, though started operating in 1971, is now the longest metro system worldwide. [4] [5] [6]
RT systems among Provincial-level administrative divisions | |||
---|---|---|---|
Province | System(s) | # | Length (km) |
BJ | Beijing | 1 | 836.0 |
TJ | Tianjin | 1 | 309.9 |
HE | Shijiazhuang | 1 | 76.5 |
SX | Taiyuan | 1 | 23.7 |
NM | Hohhot | 1 | 49.0 |
LN | Dalian, Shenyang | 2 | 400.8 |
JL | Changchun | 1 | 111.2 |
HL | Harbin | 1 | 83.7 |
SH | Shanghai, Maglev line | 2 | 831.0 |
JS | Nanjing, Suzhou, Wuxi, Changzhou, Xuzhou, Nantong | 6 | 1034.5 |
ZJ | Hangzhou, Ningbo, Wenzhou, Shaoxing, Hanghai line, Jinhua, Taizhou | 7 | 1077.2 |
AH | Hefei, Ningchu line, Wuhu | 3 | 294.3 |
FJ | Fuzhou, Xiamen | 2 | 237.4 |
JX | Nanchang | 1 | 128.4 |
SD | Qingdao, Jinan | 2 | 402.2 |
HA | Zhengzhou, Luoyang | 2 | 388.3 |
HB | Wuhan | 1 | 486.0 |
HN | Changsha, Maglev line | 2 | 226.4 |
GD | Guangzhou, Shenzhen, Foshan, Dongguan | 4 | 1358.6 |
GX | Nanning | 1 | 127.9 |
HI | |||
CQ | Chongqing | 1 | 520.3 |
SC | Chengdu | 1 | 561.6 |
GZ | Guiyang | 1 | 118.7 |
YN | Kunming | 1 | 184.1 |
XZ | |||
SN | Xi'an | 1 | 311.0 |
GS | Lanzhou | 1 | 35.0 |
QH | |||
NX | |||
XJ | ĂrĂŒmqi | 1 | 27.6 |
HK | Hong Kong | 1 | 204.4 |
MO | Macau | 1 | 12.5 |
Several Chinese cities had urban electric tramways in the early 20th century, most of which were dismantled in the 1950sâ1970s. The only surviving tramways are in Dalian (Dairen) and Changchun (see trams in Dalian and trams in Changchun). Nanjing (Nanking) had an urban railway from 1907 to 1958.
The first subway in China was built in Beijing in 1969 (but it was only handed to civilian control in 1981 and trial operations ended later in the same year; before which credentials were required). The Tianjin Metro followed in 1984. The MTR Corporation Limited from across the border in Hong Kong has investment, consulting and management stakes in the rapid transit systems of several mainland Chinese cities (having completed their first section of subway and entered into revenue operation in 1979 in New Kowloon, at the time when the territory was under British rule).
The rapid growth of the Chinese economy since the 1980s has created a huge surge in demand for urban transport. This prompted cities across China to pursue and draft proposals for subway networks, with Shanghai and Guangzhou opening their first sections of subway in the 1990s, inspiring more cities to propose subway networks. In 1995, the Central Government, alarmed by the high cost and financial debt from these ambitious subway plans, put out a "notice on the suspension of approval of urban underground rapid rail transit projects" barring new subway systems outside of Beijing, Tianjin, Guangzhou and Shanghai from being built. [7] At the time Nanjing, Wuhan, Chongqing, Dalian and Shenzhen had advanced proposals waiting to be approved. Wuhan, Chongqing, Dalian managed to circumvent the moratorium on subway construction by constructing and opening lower cost elevated lines, light metros, and monorails in the early 2000s. Changchun was the first city constructing real light rail system in China, which began operation in 2002. Its first transit line, Line 3, is a light rail line not fully grade separated, still having four level crossings as of 2023. It's also the only rapid transit system combined light rail and rapid transit lines in China, which can directly transfer to each other.[ citation needed]
Rapid urbanization of China led to severe congestion and pollution in urban areas leading to the suspension being lifted. Initially, light metro lines using small profile and shorter rolling stock were constructed to reduce costs. It was assumed that as ridership grows the line will operate trains at a low headway to increase capacity. This design paradigm was known in China as "small rolling stock, high density" operation. [8] [9] [10] However, after a few years operating, many of these lines such as Guangzhou Metro Line 3, Line 6, Shanghai Metro Line 6, and Line 8 were severely overcapacity. Guangzhou Metro Line 3 was able to reconfigure from 3-car trains into 6-car trains to slightly relieve overcapacity. This led many cities such as Beijing, Guangzhou, Wuhan and Chengdu to use higher capacity designs on newer lines.[ citation needed]
Since the mid-2000s, the growth of rapid transit systems in Chinese cities has rapidly accelerated, with most of the world's new subway mileage in the past decade opening in China. [11] [4] [12] [13] From 2009 to 2015, China built 87 mass transit rail lines, totaling 3,100 km (1,900 mi), in 25 cities at the cost of „988.6 billion. [14] In 2016, the Chinese government lowered the minimum population criteria for a city to start planning a metro system from 3 million to 1.5 million residents. [15] As part of its 13th Five Year Plan, the Chinese government published a transport whitepaper titled "Development of China's Transport". The plan envisions a more sustainable transport system with priority focused on high-capacity public transit particularly urban rail transit and bus rapid transit. All cities with over 3 million residents will start or continue to develop urban rail networks. Regional rail networks will be constructed internally connect and integrate urban agglomerations such as the Jingjinji, Yangtze River Delta and Pearl River Delta areas. [16] [17] In 2017, some 43 smaller third-tier cities in China have received approval to develop subway lines. [18]
System | Locale | Administrative division |
Lines | Stations [a] | Length (km(mi)) |
Operation start |
Most recent expansion |
Annual ridership |
Busiest station |
Ave. daily ridership (thousands) [19] [b] | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||
Beijing Subway ( ) | Beijing & Langfang | Beijing & Hebei | 25 [c] | 381 [c] | 815.2 km (506.5 mi) [c] | 1969-10-01 [d] | 2023-12-30 | 3848.4 million (2018) [20] | Xizhimen (2018) [21] | 10,821.5 | 6,252.2 | 8,370.8 | |||
Changchun Rail Transit | Changchun | Jilin | 6 [e] | 109 [f] | 140.77 km (87.47 mi) [g] | 2017-09-30 [h] | 2024-03-28 | 127.3 million (2018) [21] | Changchun Railway Station (2018) [21] | 653.4 | 420.3 | 534.2 | |||
Changsha Metro | Changsha & Xiangtan | Hunan | 7 | 135 | 207.9 km (129.2 mi) | 2014-04-29 | 2023-06-28 | 250.3 million (2018) [21] [i] | Wuyi Square (2018) [21] | 904.9 | 1,033.3 | 1,582.4 | |||
Changsha Maglev Express | Changsha | Hunan | 1 | 3 | 18.55 km (11.53 mi) | 2016-05-06 | N/A | South Railway Station | |||||||
Changzhou Metro | Changzhou | Jiangsu | 2 | 43 | 54.03 km (33.57 mi) [22] | 2019-09-21 | 2021-06-28 | 10.3 million (2019) | 167.5 | 65.3 | 131.1 | ||||
Chengdu Metro | Chengdu | Sichuan | 13 [j] | 291 [j] | 561.67 km (349.01 mi) [j] | 2010-09-27 | 2023-11-28 | 1157.6 million (2018) [21] | Chunxi Road (2018) [21] | 3,829.8 | 3,310.5 | 4,885.3 | |||
Chongqing Rail Transit | Chongqing | Chongqing | 11 | 256 | 523.68 km (325.40 mi) | 2004-11-06 | 2023-12-28 | 857.9 million (2018) [21] | Lianglukou (2018) [21] | 2,845.6 | 2,290.0 | 2,992.0 | |||
Dalian Metro ( ) | Dalian | Liaoning | 6 | 100 | 237.74 km (147.72 mi) | 2002-11-08 | 2023-03-17 | 192.3 million (2018) [21] | Xi'an Road (2018) [21] | 568.6 | 342.9 | 426.2 | |||
Dongguan Rail Transit | Dongguan | Guangdong | 1 | 15 | 37.7 km (23.4 mi) | 2016-05-27 | N/A | 46.1 million (2018) [21] | Hongfu Road (2018) [21] | 147.5 | 97.5 | 111.4 | |||
Foshan Metro | Foshan & Guangzhou | Guangdong | 3 | 61 | 112.7 km (70.0 mi) | 2010-11-03 | 2022-12-28 | 110 million (2017) [23] | Zumiao (2017) [23] | 83.5 | |||||
Fuzhou Metro | Fuzhou | Fujian | 5 | 90 | 143.5 km (89.2 mi) | 2016-05-16 | 2023-08-27 | 227.766 million (2023) [24] | Dongjiekou (2018) [21] | 294.7 | 259.5 | 340.4 | 310.3 | 624.0 | |
Guangzhou Metro | Guangzhou & Foshan | Guangdong | 16 | 251 [k] [l] | 613.21 km (381.03 mi) [m] [l] | 1997-06-28 | 2023-12-28 | 3029.5 million (2018) [21] [n] [l] | Tiyu Xilu (2018) [21] | 9,057.2 | 6,591.6 | 7,755.4 | |||
Guiyang Metro | Guiyang | Guizhou | 3 | 82 | 118.73 km (73.78 mi) | 2017-12-28 | 2023-12-16 | 7.4 million (2018) [21] | West Zhongshan Road (2018) [21] | 149.2 | 122.1 | 294.7 | |||
Hangzhou Metro ( ) | Hangzhou | Zhejiang | 12 | 254 | 516.2 km (320.8 mi) | 2012-11-24 | 2022-09-22 | 529.9 million (2018) [21] | East Railway Station (2018) [21] | 1,737.1 | 970.9 | 2,432.7 | |||
Harbin Metro | Harbin | Heilongjiang | 3 | 66 | 83.8 km (52.1 mi) | 2013-09-26 | 2023-12-26 | 97.4 million (2018) [21] | The Second Affiliated Hospital of Harbin Medical University (2018) [21] | 284.0 | 140.9 | 195.5 | |||
Hefei Metro | Hefei | Anhui | 5 | 154 | 201.95 km (125.49 mi) | 2016-12-26 | 2023-12-26 | 153.2 million (2018) [21] | Dadongmen (2018) [21] | 492.7 | 532.9 | 739.2 | |||
Hohhot Metro | Hohhot | Inner Mongolia | 2 | 43 | 49.039 km (30.471 mi) | 2019-12-29 | 2020-10-01 | 143.4 | 147.2 | ||||||
Mass Transit Railway ( ) | Hong Kong | Hong Kong SAR | 10 | 99 | 209.0 km (129.9 mi) | 1979-10-01 [o] | 2022-05-15 | 1767 million (2017) [25] [R Nb 1] | Admiralty | ||||||
Jinan Metro | Jinan | Shandong | 3 | 41 | 84.25 km (52.35 mi) | 2019-04-01 | 2021-03-26 | 172.8 | 189.1 | ||||||
Jinhua Rail Transit | Jinhua | Zhejiang | 2 | 31 | 106.451 km (66.146 mi) | 2022-08-30 | 2023-04-07 | Not opened | Not opened | Not opened | |||||
Kunming Metro | Kunming | Yunnan | 6 | 103 | 164.3 km (102.1 mi) | 2012-06-28 | 2022-06-29 | 199.6 million (2018) [21] | Dongfeng Square (2018) [21] | 586.1 | 435.1 | 606.8 | |||
Lanzhou Metro | Lanzhou | Gansu | 2 | 27 | 34.96 km (21.72 mi) [26] | 2019-06-23 | 2023-06-29 | 181.1 | 197.5 | 184.4 | |||||
Luoyang Subway | Luoyang | Henan | 2 | 33 | 43.554 km (27.063 mi) | 2021-03-28 | 2021-12-26 | Not opened | Not opened | 92.0 | |||||
Macau Light Rapid Transit | Macau | Macau SAR | 1 | 12 | 12.5 km (7.8 mi) [27] | 2019-12-10 [27] | 2023-12-08 | ||||||||
Nanchang Metro | Nanchang | Jiangxi | 4 | 94 | 128.3 km (79.7 mi) | 2015-12-26 | 2021-12-26 | 141.8 million (2018) [21] [28] | Bayi Square (2015-2020) [29] | 488.1 | 373.9 | 707.5 | |||
Nanjing Metro | Nanjing | Jiangsu | 13 | 206 | 505.86 km (314.33 mi) | 2005-09-03 | 2023-12-28 | 1118.8 million (2018) [21] | Xinjiekou (2018) [21] | 3,153.8 | 2,179.9 | 2,404.9 | |||
Nanning Metro | Nanning | Guangxi | 5 | 93 | 128.2 km (79.7 mi) | 2016-06-28 | 2021-12-16 | 213.6 million (2018) [21] | Chaoyang Square (2018) [21] | 748.4 | 569.6 | 786.8 | |||
Nantong Metro | Nantong | Jiangsu | 2 | 43 | 60.03 km (37.30 mi) | 2022-11-10 | 2023-12-27 | Not opened | Not opened | Not opened | |||||
Ningbo Rail Transit | Ningbo | Zhejiang | 5 | 116 | 185.36 km (115.18 mi) | 2014-05-30 | 2022-12-01 | 124.4 million (2018) [21] | Gulou (2018) [21] | 424.9 | 297.6 | 689.2 | |||
Qingdao Metro | Qingdao | Shandong | 8 | 186 | 342.3 km (212.7 mi) | 2015-12-16 | 2024-04-26 | 153.9 million (2018) [21] | May 4th Square (2018) [21] | 515.2 | 316.0 | 686.8 | |||
Shanghai Metro ( ) | Shanghai & Kunshan | Shanghai & Jiangsu | 19 | 408 | 802.2 km (498.5 mi) | 1993-05-28 | 2021-12-30 | 3710.2 million (2018) [21] | People's Square (2018) [21] | 10,627.3 | 7,744.8 | 9,765.4 | |||
Shanghai Maglev Train | Shanghai | Shanghai | 1 | 2 | 29.863 km (18.556 mi) | 2002-12-31 | N/A | Longyang Road | |||||||
Shaoxing Metro | Shaoxing | Zhejiang | 2 | 35 | 57.83 km (35.93 mi) | 2021-06-28 [30] | 2023-07-26 | Not opened | Not opened | ||||||
Shenyang Metro | Shenyang | Liaoning | 5 | 111 | 163.7 km (101.7 mi) | 2010-09-27 | 2023-09-29 | 329.9 million (2018) [21] | Qingniandajie (2018) [21] | 892.0 | 846.9 | 1,049.7 | |||
Shenzhen Metro ( ) | Shenzhen | Guangdong | 16 | 307 | 555.43 km (345.13 mi) | 2004-12-28 | 2023-12-27 | 1646.1 million (2018) [21] | Laojie (2018) [21] | 5,493.7 | 4,413.0 | 5,953.6 | |||
Shijiazhuang Metro | Shijiazhuang | Hebei | 3 | 60 | 76.5 km (47.5 mi) [31] | 2017-06-26 | 2021-04-06 | 87.6 million (2018) [21] [32] | Xinbaiguangchang (2018) [21] | 262.1 | 195.7 | 282.4 | |||
Suzhou Rail Transit | Suzhou | Jiangsu | 6 | 181 | 249.47 km (155.01 mi) | 2012-04-28 | 2023-06-24 | 363 million (2019) [21] | Dongfangzhimen (2018) [21] | 994.6 | 828.7 | 1,107.4 | |||
Taiyuan Metro | Taiyuan | Shanxi | 1 | 23 | 23.647 km (14.694 mi) [33] | 2020-12-26 | N/A | Not opened | 146.9 | 106.8 | |||||
Taizhou Rail Transit | Taizhou | Zhejiang | 1 | 15 | 52.568 km (32.664 mi) | 2022-12-28 | N/A | Not opened | Not opened | Not opened | |||||
Tianjin Metro ( ) | Tianjin | Tianjin | 10 | 192 | 301.0 km (187.0 mi) | 1980-08-10 [p] | 2023-12-28 | 408.5 million (2018) [21] | Tianjinzhan (2018) [21] | 1,435.9 | 933.6 | 1,263.8 | |||
ĂrĂŒmqi Metro | ĂrĂŒmqi | Xinjiang | 1 | 21 | 27.615 km (17.159 mi) | 2018-10-25 | 2019-06-28 | 2.4 million (2018) [21] | |||||||
Wenzhou Rail Transit | Wenzhou | Zhejiang | 2 | 36 | 116.452 km (72.360 mi) | 2019-01-23 | 2023-08-26 | 109.7 | 236.2 | 27.8 | |||||
Wuhan Metro | Wuhan | Hubei | 12 | 262 [34] | 486.3 km (302.2 mi) [34] | 2004-07-24 | 2023-12-30 | 1054.0 million (2018) [21] | Jianghan Road (2018) [21] | 3,349.4 | 2,055.0 | 2,737.9 | |||
Wuhu Rail Transit | Wuhu | Anhui | 2 | 35 | 46.25 km (28.74 mi) | 2021-11-03 | 2021-12-28 | Not opened | Not opened | 51.3 | |||||
Wuxi Metro | Wuxi | Jiangsu | 5 | 89 | 145.2 km (90.2 mi) | 2014-07-01 | 2024-01-31 | 103.1 million (2018) [21] | Sanyang Plaza (2018) [21] | 356.8 | 400.9 | ||||
Xi'an Metro | Xi'an & Xianyang | Shaanxi | 9 | 191 | 311.0 km (193.2 mi) | 2011-09-16 | 2023-09-21 | 746.2 million (2018) [21] | Xiaozhai (2018) [21] | 2,589.9 | 1,996.3 | 2,811.4 | |||
Xiamen Metro | Xiamen | Fujian | 3 | 70 | 98.4 km (61.1 mi) | 2017-12-31 | 2023-06-25 | 246.4158 million (2023) [24] | LĂŒcuo (2020) [24] | 159.4 | 312.2 | 464.4 | 540.3 | 675.1 | |
Xuzhou Metro | Xuzhou | Jiangsu | 3 | 51 | 64.35 km (39.99 mi) [35] | 2019-09-28 | 2021-06-28 | 7.5 million (2019) | |||||||
Zhengzhou Metro | Zhengzhou | Henan | 11 | 187 | 344.2 km (213.9 mi) | 2013-12-28 | 2023-12-28 | 293.4 million (2018) [21] | Zhengzhou Railway Station (2018) [21] | 1,126.6 | 930.2 | 1,378.6 | |||
Total | 50 locales | 29 administrative divisions |
291 | 5,592 [a] [q] | 10,186.24 km (6,329.44 mi) | 23.063 billion | 65.077 million | 48.094 million | 64.752 million |
â Lines in operation
â Lines under testing
Urban rail transit lines | |||||||
---|---|---|---|---|---|---|---|
Livery | Line | System | Length | Stations | Car configuration | Stock size [e] | Commencement |
Line 1 | Beijing | 31.0 km (19.3 mi) [36] | 23 | 6 | B1 | 1969-10-01 | |
Line 2 | 23.1 km (14.4 mi) [36] | 18 | 6 | B1 | 1984-09-20 | ||
Line 4 | 28.2 km (17.5 mi) [36] | 24 | 6 | B1 | 2009-09-28 | ||
Line 5 | 27.6 km (17.1 mi) [36] | 23 | 6 | B1 | 2007-10-07 | ||
Line 6 | 53.4 km (33.2 mi) [37] | 34 | 8 | B2 | 2012-12-30 | ||
Line 7 | 40.3 km (25.0 mi) | 30 | 8 | B1 | 2014-12-28 | ||
Line 8 | 49.5 km (30.8 mi) | 34 | 6 | B1 | 2008-07-19 | ||
Line 9 | 16.5 km (10.3 mi) [36] | 13 | 6 | B1 | 2011-12-31 | ||
Line 10 | 57.1 km (35.5 mi) [36] | 45 | 6 | B1 | 2008-07-19 | ||
Line 11 | 2.89 km (1.80 mi) | 4 | 4 | A | 2021-12-31 | ||
Line 13 | 40.85 km (25.38 mi) | 17 | 6 | B1 | 2002-09-22 | ||
Line 14 | 47.3 km (29.4 mi) [38] | 33 | 6 | A | 2013-05-05 | ||
Line 15 | 41.4 km (25.7 mi) [36] | 20 | 6 | B1 | 2010-12-30 | ||
Line 16 | 48.9 km (30.4 mi) [39] | 29 | 8 | A | 2016-12-31 | ||
Line 17 | 40.7 km (25.3 mi) | 16 | 8 | A | 2021-12-31 | ||
Line 19 | 20.9 km (13.0 mi) | 10 | 8 | A | 2021-12-31 | ||
Line S1 | 10.2 km (6.3 mi) [40] | 8 | 6 | ML | 2017-12-30 | ||
Batong line | 23.4 km (14.5 mi) [41] | 13 | 6 | B1 | 2003-12-27 | ||
Capital Airport Express | 29.9 km (18.6 mi) [36] | 5 | 4 | LB | 2008-07-19 | ||
Changping line | 43.2 km (26.8 mi) [42] | 18 | 6 | B1 | 2010-12-30 | ||
Daxing Airport Express | 41.36 km (25.70 mi) | 3 | 4/8 | D (two doors per car) | 2019-09-26 [43] | ||
Daxing line | 21.76 km (13.52 mi) [36] | 11 | 6 | B1 | 2010-12-30 | ||
Fangshan line | 31.8 km (19.8 mi) [44] [45] | 16 | 6 | B1 | 2010-12-30 | ||
Yanfang line | 14.4 km (8.9 mi) [46] | 9 | 4 | B1 | 2017-12-30 | ||
Yizhuang line | 23.2 km (14.4 mi) | 14 | 6 | B1 | 2010-12-30 | ||
Line 1 | Changchun | 18.142 km (11.273 mi) [47] [36] | 15 | 6 | B2 | 2017-06-30 | |
Line 2 | 24.86 km (15.45 mi) [48] | 21 | 6 | B2 | 2018-08-30 | ||
Line 3 | 34.1 km (21.2 mi) | 34 | 6 | C (Low-floor light rail) | 2002-10-30 | ||
Line 4 | 20.8 km (12.9 mi) | 20 | 6 | C (Low-floor light rail) | 2011-06-30 | ||
Line 6 | 29.57 km (18.37 mi) | 22 | 6 | B | 2024-03-28 | ||
Line 8 | 13.1 km (8.1 mi) | 12 | 6 | C (Low-floor light rail) | 2018-10-30 | ||
Line 1 | Changsha | 23.57 km (14.65 mi) [36] | 20 | 6 | B2 | 2016-06-28 | |
Line 2 | 26.58 km (16.52 mi) [36] | 23 | 6 | B2 | 2014-04-29 | ||
Line 3 | 53.69 km (33.36 mi) [49] | 33 | 6 | B | 2020-06-28 | ||
Line 4 | 33.5 km (20.8 mi) | 25 | 6 | B2 | 2019-05-26 | ||
Line 5 | 22.5 km (14.0 mi) [49] | 18 | 6 | B | 2020-06-28 | ||
Line 6 | 48.11 km (29.89 mi) | 34 | 6 | A | 2022-06-28 | ||
Maglev Express | Changsha ML | 18.55 km (11.53 mi) [36] | 3 | 3 | ML | 2016-05-06 | |
Line 1 | Changzhou | 34.24 km (21.28 mi) [22] | 29 | 6 | B | 2019-09-21 | |
Line 2 | 19.79 km (12.30 mi) [50] | 15 | 6 | B | 2021-06-28 | ||
Line 1 | Chengdu | 40.99 km (25.47 mi) [36] | 35 | 6 | B2 | 2010-09-27 | |
Line 2 | 42.32 km (26.30 mi) [36] | 32 | 6 | B2 | 2012-09-16 | ||
Line 3 | 49.85 km (30.98 mi) | 37 | 6 | B2 | 2016-07-31 | ||
Line 4 | 43.28 km (26.89 mi) [36] [46] | 30 | 6 | B2 | 2015-12-26 | ||
Line 5 | 49.018 km (30.5 mi) | 41 | 8 | A | 2019-12-27 | ||
Line 6 | 68.76 km (42.7 mi) [51] | 54 | 8 | A | 2020-12-18 | ||
Line 7 | 38.61 km (23.99 mi) [46] | 31 | 6 | A | 2017-12-06 | ||
Line 8 | 29.17 km (18.1 mi) [51] | 25 | 6 | A | 2020-12-18 | ||
Line 9 | 22.18 km (13.8 mi) [51] | 13 | 8 | A | 2020-12-18 | ||
Line 10 | 37.972 km (23.6 mi) [52] [53] | 16 | 6 | A | 2017-09-06 | ||
Line 17 | 5.486 km (3.4 mi) [51] | 3 | 8 | A | 2020-12-18 | ||
Line 18 | 69.39 km (43.12 mi) [51] | 12 | 8 | A | 2020-09-27 [54] | ||
Line 19 | 60.139 km (37.369 mi) | 18 | 4 | A | 2023-11-28 [f] | ||
Line 1 | Chongqing | 43.71 km (27.16 mi) | 25 | 6 | B2 | 2011-07-28 | |
Line 2 | 31.36 km (19.49 mi) [36] | 25 | 4/6/8 | HL | 2004-11-06 | ||
Line 3 | 67.09 km (41.69 mi) [36] | 45 | 6/8 | HL | 2011-09-29 | ||
Line 4 | 48.5 km (30.1 mi) [55] | 24 | 6 | AS | 2018-12-28 | ||
Line 5 | 48.66 km (30.24 mi) [46] | 31 | 6 | AS | 2017-12-28 | ||
Jiangtiao line | 26.33 km (16.36 mi) [56] | 7 | 6 | AS | 2022-08-06 [56] | ||
Line 6 | 85.54 km (53.15 mi) [36] | 40 | 6 | B2 | 2012-09-28 | ||
Line 9 | 40.1 km (24.9 mi) | 29 | 6 | AS | 2022-01-25 | ||
Line 10 | 43.26 km (26.88 mi) | 26 | 6 | AS | 2017-12-28 | ||
Line 18 | 28.96 km (17.99 mi) | 19 | 6 | AS | 2023-12-28 | ||
Loop line | 50.93 km (31.65 mi) | 33 | 6 | AS | 2018-12-28 | ||
Line 1 | Dalian | 28.34 km (17.61 mi) [57] | 22 | 6 | B2 | 2015-10-30 | |
Line 2 | 37.97 km (23.59 mi) [57] | 29 | 6 | B2 | 2015-05-22 | ||
Line 3 | 63.45 km (39.43 mi) [57] | 18 | 2/4 | B2 | 2002-11-08 | ||
Line 5 | 24.48 km (15.21 mi) | 18 | 6 | B2 | 2023-03-17 | ||
Line 12 | 40.38 km (25.09 mi) [57] | 8 | 4 | B2 | 2013-12-30 | ||
Line 13 | 43.152 km (26.813 mi) | 12 | 4 | B2 | 2021-12-28 | ||
Line 2 | Dongguan | 37.8 km (23.5 mi) [36] | 15 | 6 | B2 | 2016-05-27 | |
Line 2 | Foshan | 32.41 km (20.14 mi) [58] | 17 | 6 | B | 2021-12-28 | |
Line 3 | 40.72 km (25.30 mi) | 22 | 6 | B | 2022-12-28 | ||
Line 1 | Fuzhou | 29.84 km (18.54 mi) [36] [46] | 25 | 6 | B2 | 2016-05-18 | |
Line 2 | 30.629 km (19.032 mi) | 22 | 6 | B2 | 2019-04-26 | ||
Line 4 | 24.0 km (14.9 mi) | 19 | 6 | B2 | 2023-08-27 | ||
Line 5 | 27.71 km (17.22 mi) [59] | 20 | 6 | B2 | 2022-04-29 | ||
Line 6 | 31.346 km (19.5 mi) [60] | 14 | 4 | B2 | 2022-08-28 | ||
Line 1 | Guangzhou | 18.5 km (11.5 mi) [36] | 16 | 6 | A | 1997-06-28 | |
Line 2 | 31.8 km (19.8 mi) [36] | 24 | 6 | A | 2002-12-29 | ||
Line 3 | 68.5 km (42.6 mi) [36] | 30 | 6 | B2 | 2005-12-26 | ||
Line 4 | 60.04 km (37.31 mi) [36] [46] | 23 | 4 | LB | 2005-12-26 | ||
Line 5 | 41.7 km (25.9 mi) [36] | 30 | 6 | LB | 2009-12-28 | ||
Line 6 | 41.7 km (25.9 mi) [36] | 31 | 4 | LB | 2013-12-28 | ||
Line 7 | 54.24 km (33.70 mi) [36] | 27 | 6 | B2 | 2016-12-28 | ||
Line 8 | 33.9 km (21.1 mi) [61] | 28 | 6 | A | 2010-09-25 | ||
Line 9 | 20.1 km (12.5 mi) [46] | 11 | 6 | B2 | 2017-12-28 | ||
Line 13 | 28.3 km (17.6 mi) [46] | 11 | 8 | A | 2017-12-28 | ||
Line 14 | 75.4 km (46.9 mi) [46] | 22 | 6 | B1 | 2017-12-28 | ||
Line 18 | 58.3 km (36.2 mi) [62] [63] | 8 | 8 | D | 2021-09-28 [63] | ||
Line 21 | 61.5 km (38.2 mi) [64] | 21 | 6 | B1 | 2018-12-28 | ||
Line 22 | 18.2 km (11.3 mi) | 4 | 8 | D | 2022-03-31 | ||
Zhujiang New Town APM line | 3.9 km (2.4 mi) [36] | 9 | 2 | P | 2010-11-08 | ||
Guangfo line | Guangzhou & Foshan | 39.6 km (24.6 mi) | 25 | 4 | B2 | 2010-09-25 | |
Line 1 | Guiyang | 35.11 km (21.8 mi) | 25 | 6 | B2 | 2017-12-28 | |
Line 2 | 40.6 km (25.2 mi) [65] | 32 | 6 | B2 | 2021-04-28 | ||
Line 3 | 43.03 km (26.7 mi) | 29 | 6 | B2 | 2023-12-16 | ||
Line 1 | Hangzhou | 52.21 km (32.44 mi) [36] | 33 | 6 | B2 | 2012-11-24 | |
Line 2 | 42.82 km (26.61 mi) [66] | 33 | 6 | B2 | 2014-11-24 | ||
Line 3 | 57.5 km (35.7 mi) | 37 | 6 | AH | 2022-02-21 | ||
Line 4 | 46.85 km (29.11 mi) [36] | 32 | 6 | B2 | 2015-02-02 | ||
Line 5 | 53.92 km (33.50 mi) [67] | 39 | 6 | AH | 2019-06-24 | ||
Line 6 | 58.5 km (36.4 mi) | 36 | 6 | AH | 2020-12-30 | ||
Line 7 | 47.48 km (29.50 mi) | 24 | 6 | A | 2020-12-30 | ||
Line 8 | 17.17 km (10.67 mi) | 9 | 6 | A | 2021-06-28 | ||
Line 9 | 29.5 km (18.3 mi) [68] | 21 | 6 | B2 | 2021-07-10 [69] [H 1] | ||
Line 10 | 14.67 km (9.12 mi) | 12 | 6 | A | 2022-02-21 | ||
Line 16 | 35.12 km (21.82 mi) [70] | 12 | 4 | B2 | 2020-04-23 | ||
Line 19 | 59.14 km (36.75 mi) | 14 | 6 | A | 2022-09-22 | ||
Line 1 | Harbin | 26.27 km (16.32 mi) | 23 | 6 | B2 | 2013-09-26 | |
Line 2 | 28.19 km (17.52 mi) | 19 | 6 | B2 | 2021-09-19 | ||
Line 3 | 28.71 km (17.84 mi) | 28 | 6 | B2 | 2017-01-26 | ||
Line 1 | Hefei | 29.16 km (18.12 mi) [36] | 26 | 6 | B2 | 2016-12-26 | |
Line 2 | 42.76 km (26.57 mi) [46] | 35 | 6 | B2 | 2017-12-26 | ||
Line 3 | 48.5 km (30.1 mi) [71] | 40 | 6 | B | 2019-12-26 [71] | ||
Line 4 | 55.4 km (34.4 mi) | 38 | 6 | B | 2021-12-26 | ||
Line 5 | 40.7 km (25.3 mi) | 33 | 6 | B | 2020-12-26 | ||
Line 1 | Hohhot | 21.719 km (13.5 mi) [72] | 20 | 6 | B | 2019-12-29 | |
Line 2 | 27.32 km (17.0 mi) [73] | 24 | 6 | B | 2020-10-01 [73] | ||
Airport Express | Hong Kong | 35.2 km (21.9 mi) | 5 | 8 | A (airport version, two doors per car, max 140km/h) | 1998-07-06 | |
Disneyland Resort line | 3.3 km (2.1 mi) | 2 | 4 | A (three doors per car) | 2005-08-01 | ||
East Rail line | 47.5 km (29.5 mi) | 16 | 9 | Special size (24.1 meters long, 3.22m wide, max 140km/h) | 1984-02-27 [H 2] | ||
Island line | 16.3 km (10.1 mi) | 17 | 8 | A | 1985-05-31 | ||
Kwun Tong line | 17.4 km (10.8 mi) | 17 | 8 | A | 1979-10-01 | ||
South Island line | 7.4 km (4.6 mi) | 5 | 3 | A | 2016-12-28 | ||
Tseung Kwan O line | 12.3 km (7.6 mi) | 8 | 8 | A | 2002-08-04 | ||
Tsuen Wan line | 16.0 km (9.9 mi) | 16 | 8 | A | 1979-12-31 | ||
Tuen Ma line | 56.2 km (34.9 mi) [74] | 27 | 8 | KCR Size (24.1 meters long, 3.1 meters wide, max 160km/h) | 2003-12-20 | ||
Tung Chung line | 31.1 km (19.3 mi) | 8 | 8 | A (maximum140km/h) | 1998-06-21 | ||
Line 1 | Jinan | 26.27 km (16.32 mi) | 11 | 4 | B1 | 2019-04-01 | |
Line 2 | 36.39 km (22.61 mi) | 19 | 6 | B1 | 2021-03-26 | ||
Line 3 | 21.592 km (13.417 mi) | 12 | 6 | B | 2019-12-28 [75] | ||
Jinyi Line | Jinhua | 58.071 km (36.084 mi) | 17 | 6 | B | 2022-08-30 | |
Yidong Line | 48.38 km (30.06 mi) | 15 | 6 | B | 2022-12-28 | ||
Line 1 | Kunming | 34.0 km (21.1 mi) [36] | 22 | 6 | B1 | 2013-05-20 | |
Line 2 | 12.4 km (7.7 mi) [36] | 14 | 6 | B1 | 2014-04-30 | ||
Line 3 | 23.36 km (14.52 mi) [46] | 20 | 6 | B1 | 2017-08-29 | ||
Line 4 | 43.4 km (27.0 mi) | 29 | 6 | B1 | 2020-09-23 | ||
Line 5 | 26.45 km (16.44 mi) | 22 | 6 | B1 | 2022-06-29 | ||
Line 6 | 25.3 km (15.7 mi) | 8 | 6 | B1 | 2012-06-28 | ||
Line 1 | Lanzhou | 25.9 km (16.1 mi) [26] | 20 | 6 | A | 2019-06-23 | |
Line 2 | 9.06 km (5.63 mi) | 9 | 6 | A | 2023-06-29 | ||
Line 1 | Luoyang | 25.342 km (15.747 mi) | 19 | 6 | B | 2021-03-28 | |
Line 2 | 18.216 km (11.319 mi) | 15 | 6 | B | 2021-12-26 | ||
Taipa line | Macau | 12.5 km (7.8 mi) [27] | 12 | 2 (max 4 in future) | P | 2019-12-10 [27] | |
Line 1 | Nanchang | 28.74 km (17.86 mi) [36] | 24 | 6 | B2 | 2015-12-26 | |
Line 2 | 31.51 km (19.58 mi) [76] | 28 | 6 | B2 | 2017-08-18 | ||
Line 3 | 28.5 km (17.7 mi) [77] | 22 | 6 | B2 | 2020-12-26 | ||
Line 4 | 39.6 km (24.6 mi) | 29 | 6 | B2 | 2021-12-26 | ||
Line 1 | Nanjing | 45.44 km (28.24 mi) [36] | 32 | 6 | A | 2005-09-03 | |
Line 2 | 43.35 km (26.94 mi) [36] | 30 | 6 | A | 2010-05-28 | ||
Line 3 | 44.87 km (27.88 mi) [36] | 29 | 6 | A | 2015-04-01 | ||
Line 4 | 33.75 km (20.97 mi) [46] | 18 | 6 | B2 | 2017-01-18 | ||
Line 7 | 24.50 km (15.22 mi) [46] | 19 | 6 | B2 | 2022-12-28 | ||
Line 10 | 21.6 km (13.4 mi) [36] | 14 | 6 | A | 2014-07-01 | ||
Line S1 | 36.32 km (22.57 mi) [36] | 9 | 6 | B2 | 2014-07-01 | ||
Line S3 | 36.26 km (22.53 mi) [46] | 19 | 6 | B2 | 2017-12-06 | ||
Line S4 | 46.2 km (28.7 mi) | 10 | 4 | D | 2023-06-28 | ||
Line S6 | 43.59 km (27.09 mi) | 13 | 4 | B2 | 2021-12-28 | ||
Line S7 | 28.87 km (17.94 mi) | 9 | 4 | B2 | 2018-05-26 | ||
Line S8 | 47.29 km (29.38 mi) [36] | 19 | 4 | B2 | 2014-08-01 | ||
Line S9 | 52.39 km (32.55 mi) [46] | 6 | 3 | B2 | 2017-12-30 | ||
Line 1 | Nanning | 32.1 km (19.9 mi) [36] | 25 | 6 | B2 | 2016-06-28 | |
Line 2 | 27.5 km (17.1 mi) [46] | 23 | 6 | B2 | 2017-12-28 | ||
Line 3 | 27.9 km (17.3 mi) [78] | 23 | 6 | B2 | 2019-06-06 | ||
Line 4 | 20.7 km (12.9 mi) | 16 | 6 | B2 | 2020-11-23 | ||
Line 5 | 20.2 km (12.6 mi) [79] | 17 | 6 | B2 | 2021-12-16 [79] | ||
Line 1 | Nantong | 39.182 km (24.347 mi) | 28 | 6 | B | 2022-11-10 | |
Line 2 | 20.85 km (12.96 mi) | 17 | 6 | B | 2023-12-27 | ||
Line 1 | Ningbo | 46.17 km (28.69 mi) [36] | 29 | 6 | B2 | 2014-05-30 | |
Line 2 | 36.85 km (22.90 mi) | 27 | 6 | B2 | 2015-09-26 | ||
Line 3 | 38.63 km (24.00 mi) [80] | 24 | 6 | B2 | 2019-06-30 | ||
Line 4 | 35.95 km (22.34 mi) | 25 | 6 | B2 | 2020-12-23 | ||
Line 5 | 27.6 km (17.1 mi) | 22 | 6 | B2 | 2021-12-28 | ||
Line 1 | Qingdao | 60.11 km (37.35 mi) | 41 | 6 | B1 | 2020-12-24 | |
Line 2 | 25.09 km (15.59 mi) | 22 | 6 | B1 | 2017-12-10 | ||
Line 3 | 24.95 km (15.50 mi) [36] | 22 | 6 | B1 | 2015-12-16 | ||
Line 4 | 30.71 km (19.08 mi) | 25 | 6 | B1 | 2022-12-26 | ||
Line 6 | 30.762 km (19.115 mi) [81] [82] | 21 | 6 | B1 | 2024-04-26 [83] | ||
Line 8 | 49.61 km (30.83 mi) | 11 | 6 | B1 | 2020-12-24 | ||
Line 11 | 58.35 km (36.26 mi) | 22 | 4 | B1 | 2018-04-23 | ||
Line 13 | 69.63 km (43.27 mi) | 23 | 4 | B1 | 2018-12-26 | ||
Line 1 | Shanghai | 36.76 km (22.84 mi) [36] | 28 | 8 | A | 1993-05-28 | |
Line 2 | 59.71 km (37.10 mi) [36] | 30 | 8 | A | 2000-06-11 | ||
Line 3 | 40.12 km (24.93 mi) [36] | 29 | 6 | A | 2000-12-26 | ||
Line 4 | 33.81 km (21.01 mi) [36] | 26 | 6 | A | 2005-12-31 | ||
Line 5 | 32.73 km (20.34 mi) [36] | 19 | 4/6 | C (High-floor heavy rail) | 2003-11-25 | ||
Line 6 | 32.54 km (20.22 mi) [36] | 28 | 4 | C (High-floor heavy rail) | 2007-12-29 | ||
Line 7 | 43.13 km (26.80 mi) [36] | 33 | 6 | A | 2009-12-05 | ||
Line 8 | 36.73 km (22.82 mi) [36] | 30 | 6/7 | C (High-floor heavy rail) | 2007-12-29 | ||
Line 9 | 63.80 km (39.64 mi) [36] [46] | 35 | 6 | A | 2007-12-29 | ||
Line 10 | 44.94 km (27.92 mi) [36] | 37 | 6 | A | 2010-04-10 | ||
Line 11 | 79.27 km (49.26 mi) [36] | 39 | 6 | A | 2009-12-31 | ||
Line 12 | 39.49 km (24.54 mi) [36] | 32 | 6 | A | 2013-12-29 | ||
Line 13 | 38.27 km (23.78 mi) [36] | 31 | 6 | A | 2012-12-30 | ||
Line 14 | 38.18 km (23.72 mi) | 30 | 8 | A | 2021-12-30 | ||
Line 15 | 41.22 km (25.61 mi) | 30 | 6 | A | 2021-01-23 | ||
Line 16 | 57.80 km (35.92 mi) [36] | 13 | 3/6 | A | 2013-12-29 | ||
Line 17 | 34.72 km (21.57 mi) [36] | 13 | 6 | A | 2017-12-30 | ||
Line 18 | 36.50 km (22.68 mi) | 26 | 6 | A | 2020-12-26 | ||
Pujiang line | 6.60 km (4.10 mi) | 6 | 4 | P | 2018-03-31 | ||
Maglev line | Shanghai ML | 29.863 km (18.556 mi) [36] | 2 | 5 | MH | 2004-01-01 | |
Line 1 | Shaoxing | 51.2 km (31.8 mi) [30] | 30 | 6 | B | 2021-06-28 [30] | |
Line 2 | 10.73 km (6.67 mi) | 9 | 4 | B | 2023-07-26 | ||
Line 1 | Shenyang | 27.80 km (17.27 mi) [36] | 22 | 6 | B2 | 2009-09-23 | |
Line 2 | 45.58 km (28.32 mi) [36] | 33 | 6 | B2 | 2012-01-08 | ||
Line 4 | 34.112 km (21.196 mi) | 23 | 6 | B2 | 2023-09-29 | ||
Line 9 | 28.996 km (18.017 mi) [84] | 23 | 6 | B2 | 2019-05-25 | ||
Line 10 | 27.21 km (16.91 mi) | 21 | 6 | B2 | 2020-04-29 [85] | ||
Line 1 | Shenzhen | 41.04 km (25.50 mi) [36] | 30 | 6 | A | 2004-12-28 | |
Line 2 | 39.78 km (24.72 mi) [36] | 32 | 6 | A | 2010-12-08 | ||
Line 3 | 43.45 km (27.00 mi) [36] | 31 | 6 | B1 | 2010-12-28 | ||
Line 4 | 31.3 km (19.4 mi) [36] | 23 | 6 | A | 2004-12-28 | ||
Line 5 | 47.393 km (29.449 mi) [86] | 34 | 6 | A | 2011-06-22 | ||
Line 6 | 49.4 km (30.7 mi) | 27 | 6 | A | 2020-08-18 [87] | ||
Line 6B | 6.13 km (3.81 mi) | 4 | 6 | B | 2022-11-28 | ||
Line 7 | 30.173 km (18.749 mi) [36] | 27 | 6 | A | 2016-10-28 | ||
Line 8 | 20.38 km (12.66 mi) | 11 | 6 | A | 2020-10-28 | ||
Line 9 | 36.18 km (22.48 mi) | 32 | 6 | A | 2016-10-28 | ||
Line 10 | 29.34 km (18.23 mi) | 24 | 8 | A | 2020-08-18 [87] | ||
Line 11 | 53.14 km (33.02 mi) [36] | 19 | 8 | A | 2016-06-28 | ||
Line 12 | 40.56 km (25.20 mi) | 33 | 6 | A | 2022-11-28 | ||
Line 14 | 50.34 km (31.28 mi) | 18 | 8 | A | 2022-10-28 | ||
Line 16 | 29.20 km (18.14 mi) | 24 | 6 | A | 2022-12-28 | ||
Line 20 | 8.43 km (5.24 mi) | 5 | 8 | A | 2021-12-28 | ||
Line 1 | Shijiazhuang | 34.3 km (21.3 mi) | 26 | 6 | A | 2017-06-26 | |
Line 2 | 15.5 km (9.6 mi) [88] | 15 | 6 | A | 2020-08-26 [88] | ||
Line 3 | 26.7 km (16.6 mi) | 22 | 6 | A | 2017-06-26 | ||
Line 1 | Suzhou | 25.739 km (15.993 mi) [36] | 24 | 4 | B1 | 2012-04-28 | |
Line 2 | 40.4 km (25.1 mi) [36] | 35 | 5 | B1 | 2013-12-28 | ||
Line 3 | 45.272 km (28.1 mi) [89] | 37 | 6 | B1 | 2019-12-25 [90] | ||
Line 4 | 52.8 km (32.8 mi) [46] | 38 | 6 | B1 | 2017-04-15 | ||
Line 5 | 44.1 km (27.4 mi) | 34 | 6 | B | 2021-06-29 | ||
Line 11 | 41.27 km (25.64 mi) | 28 | 6 | B | 2023-06-24 | ||
Line 2 | Taiyuan | 23.647 km (14.694 mi) | 23 | 6 | A | 2020-12-26 | |
Line S1 | Taizhou | 52.396 km (32.557 mi) | 15 | 4 | D | 2022-12-28 | |
Line 1 | Tianjin | 42.227 km (26.2 mi) | 28 | 6 | B1 | 1980-08-10 | |
Line 2 | 27.157 km (16.875 mi) [36] | 20 | 6 | B1 | 2012-07-01 | ||
Line 3 | 33.6 km (20.9 mi) [36] | 26 | 6 | B1 | 2012-10-01 | ||
Line 4 | 19.4 km (12.1 mi) | 14 | 6 | B2 | 2021-12-28 | ||
Line 5 | 34.8 km (21.6 mi) [91] [92] | 28 | 6 | B2 | 2018-10-22 | ||
Line 6 | 43.6 km (27.1 mi) [36] | 39 | 6 | B2 | 2016-08-06 | ||
Line 8 | 13.42 km (8.34 mi) | 9 | 6 | A | 2021-12-28 | ||
Line 9 | 52.759 km (32.783 mi) [36] | 21 | 4 | B2 | 2004-03-28 | ||
Line 10 | 21.18 km (13.16 mi) | 21 | 6 | B | 2022-11-18 | ||
Line 11 | 12.27 km (7.62 mi) | 11 | 6 | B | 2023-12-28 | ||
Line 1 | ĂrĂŒmqi | 27.615 km (17.159 mi) | 21 | 6 | A | 2018-10-25 | |
Line S1 | Wenzhou | 53.507 km (33.248 mi) | 18 | 4 | D | 2019-01-23 | |
Line S2 | 62.945 km (39.112 mi) | 20 | 4 | D | 2023-08-26 | ||
Line 1 | Wuhan | 37.936 km (23.572 mi) [36] [46] | 32 | 4 | B1 | 2004-07-28 | |
Line 2 | 60.304 km (37.471 mi) | 38 | 6 | B1 | 2012-12-28 | ||
Line 3 | 29.660 km (18.430 mi) [36] | 24 | 6 | B1 | 2015-12-28 | ||
Line 4 | 49.693 km (30.878 mi) | 37 | 6 | B1 | 2013-12-28 | ||
Line 5 | 37.216 km (23.125 mi) | 27 | 6 | A | 2021-12-26 | ||
Line 6 | 42.537 km (26.431 mi) [36] | 32 | 6 | A | 2016-12-28 | ||
Line 7 | 67.853 km (42.162 mi) | 33 | 6 | A | 2018-10-01 | ||
Line 8 | 38.197 km (23.735 mi) [46] | 26 | 6 | A | 2017-12-26 | ||
Line 11 | 22.530 km (13.999 mi) | 14 | 6 | A | 2018-10-01 | ||
Line 16 | 36.458 km (22.654 mi) | 14 | 4 | A | 2021-12-26 | ||
Line 19 | 23.3 km (14.5 mi) | 7 | 6 | A | 2023-12-30 | ||
Yangluo line | 34.575 km (21.484 mi) [46] | 16 | 4 | A | 2017-12-26 | ||
Line 1 | Wuhu | 30.46 km (18.93 mi) | 25 | 6 | HL | 2021-11-03 [93] | |
Line 2 | 15.787 km (9.810 mi) | 11 | 4 | HL | 2021-12-28 | ||
Line 1 | Wuxi | 65.007 km (40.393 mi) | 36 | 6 | B1 | 2014-07-01 | |
Line 2 | 26.3 km (16.3 mi) [94] [36] | 21 | 6 | B1 | 2014-12-28 | ||
Line 3 | 28.493 km (17.70 mi) [95] | 21 | 6 | B | 2020-10-28 | ||
Line 4 | 25.4 km (15.8 mi) | 18 | 6 | B | 2021-12-17 | ||
Line 1 | Xi'an | 42.20 km (26.22 mi) [96] | 30 | 6 | B2 | 2013-09-15 | |
Line 2 | 33.637 km (20.901 mi) [97] | 25 | 6 | B2 | 2011-09-16 | ||
Line 3 | 39.15 km (24.33 mi) [36] | 26 | 6 | B2 | 2016-11-08 | ||
Line 4 | 35.2 km (21.9 mi) | 29 | 6 | B2 | 2018-12-26 | ||
Line 5 | 41.6 km (25.8 mi) | 31 | 6 | B2 | 2020-12-28 | ||
Line 6 | 35.1 km (21.8 mi) | 30 | 6 | B2 | 2020-12-28 | ||
Line 9 | 25.296 km (15.718 mi) | 15 | 6 | B2 | 2020-12-28 | ||
Line 14 | 42.96 km (26.69 mi) | 17 | 6 | B2 | 2019-09-29 | ||
Line 16 | 15.03 km (9.34 mi) | 9 | 6 | B2 | 2023-06-27 | ||
Line 1 | Xiamen | 30.30 km (18.83 mi) [46] | 24 | 6 | B2 | 2017-12-31 | |
Line 2 | 41.64 km (25.87 mi) | 30 | 6 | B2 | 2019-12-25 [98] | ||
Line 3 | 26.52 km (16.48 mi) [99] | 21 | 4 | B | 2021-06-25 [99] | ||
Line 1 | Xuzhou | 21.967 km (13.650 mi) [100] | 18 | 6 | B | 2019-09-28 | |
Line 2 | 24.25 km (15.07 mi) [101] | 20 | 6 | B | 2020-11-28 | ||
Line 3 | 18.13 km (11.27 mi) [102] | 16 | 6 | B | 2021-06-28 [102] | ||
Line 1 | Zhengzhou | 41.21 km (25.61 mi) [103] | 30 | 6 | B2 | 2013-12-28 [104] | |
Line 2 | 30.85 km (19.17 mi) [105] [106] | 22 | 6 | B2 | 2016-08-19 | ||
Line 3 | 31.813 km (19.768 mi) | 25 | 6 | A | 2020-12-26 | ||
Line 4 | 29.287 km (18.2 mi) | 27 | 6 | B | 2020-12-26 | ||
Line 5 | 40.4 km (25.1 mi) [107] | 32 | 6 | A | 2019-05-20 | ||
Line 6 | 16.727 km (10.394 mi) | 10 | 6 | A | 2022-09-30 | ||
Line 10 | 21.864 km (13.586 mi) | 12 | 6 | A | 2023-09-28 | ||
Line 12 | 16.538 km (10.276 mi) | 11 | 6 | B | 2023-12-20 | ||
Line 14 | 7.455 km (4.632 mi) [108] | 4 | 6 | B | 2019-09-19 | ||
Zhengxu Line | 67.13 km (41.71 mi) | 26 | 4 | B | 2023-12-28 | ||
Chengjiao line | 40.84 km (25.38 mi) | 18 | 6 | B2 | 2017-01-12 |
â Lines / extensions in operation.
â Lines / extensions under testing.
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hefei Metro ćè„ć°é |
Locale | Hefei |
2 East extension |
|||
Began operation | 26 December 2016 | |||||
Lines in operation | 5 | |||||
No. of stations | 136 | |||||
Network length | 176.15 km (109 mi) | |||||
Ridership | 1,230,200 (31 December 2020 record). 179.8 million (2019) | |||||
Wuhu Rail Transit èæč蜚éäș€é |
Locale | Wuhu | ||||
Began operation | 3 November 2021 | |||||
Lines in operation | 2 | |||||
No. of stations | 35 | |||||
Network length | 46.25 km (29 mi) | |||||
Ridership | N/A | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Beijing Subway (BGD) ćäșŹć°é |
Locale | Beijing & Langfang |
1
2
4
5
6
7
8
9
10
11
13
14
15
16
17
19
S1 |
1 Military section renovation and branch |
[Note 1] [215] [216] [217] | |
Began operation | 1 October 1969 | |||||
Lines in operation | 25 | |||||
No. of stations | 369 ( List) | |||||
Network length | 785.7 km (488.2 mi) [h] | |||||
Ridership | 10,824,301 (2019 daily avg.)
[20] 13,738,800 (12 July 2019 record). 3,950.9 million (2019). | |||||
Shijiazhuang Metro çłćź¶ćșć°é |
Locale | Shijiazhuang | ||||
Began operation | 26 June 2017 | |||||
Lines in operation | 3 | |||||
No. of stations | 60 ( List) | |||||
Network length | 76.5 km (47.5 mi) [31] | |||||
Ridership | 479,900 (31 December 2020 record). 95.7 million (2019). | |||||
Tianjin Metro ć€©æŽ„ć°é |
Locale | Tianjin |
4 Northern Section |
[Note 2] | ||
Began operation | 30 September 2003 (10 August 1980 old system) | |||||
Lines in operation | 9 | |||||
No. of stations | 181 ( List) | |||||
Network length | 288.25 km (179.1 mi) | |||||
Ridership | 1,869,000 (31 December 2019 record). 523.5 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Chengdu Metro æéœć°é |
Locale | Chengdu | ||||
Began operation | 27 September 2010 | |||||
Lines in operation | 12 | |||||
No. of stations | 284 ( List) | |||||
Network length | 518.5 km (322.2 mi) | |||||
Ridership | 5,649,500 (daily record) 1398 million (2019 annual) | |||||
Chongqing Rail Transit (CRT) Chongqing Metro éćș蜚éäș€é |
Locale | Chongqing |
4 Phase 2 & Western extension |
[218] [219] [220] | ||
Began operation | 6 November 2004 | |||||
Lines in operation | 10 | |||||
No. of stations | 238 ( List) | |||||
Network length | 485.02 km (301 mi) | |||||
Ridership | 3,872,000 (peak day) 2,846,356 (daily avg.) 1038.9 million (2019) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Fuzhou Metro çŠć·ć°é |
Locale | Fuzhou | 1 2 4 5 6 |
2 Eastern extension |
||
Began operation | 18 May 2016 | |||||
Lines in operation | 5 | |||||
No. of stations | 90 | |||||
Network length | 139 km (86 mi) | |||||
Ridership | 553,600 (31 December 2020 Record) 227.766 million (2023 annual) | |||||
Xiamen Metro (AMTR) ćŠéšć°é |
Locale | Xiamen | ||||
Began operation | 31 December 2017 | |||||
Lines in operation | 3 | |||||
No. of stations | 70 | |||||
Network length | 98.4 km (61.1 mi) | |||||
Ridership | 944,200 (2 May 2021 Record) 246.4158 million (2023 annual) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Lanzhou Metro ć °ć·èœšéäș€é |
Locale | Lanzhou | ||||
Began operation | 23 June 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 27 | |||||
Network length | 34.96 km (21.7 mi) [26] | |||||
Ridership | 301,300 (1 Oktober 2020 Record) 32.4 million (2019 annual) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dongguan Rail Transit Dongguan Metro äžè蜚éäș€é |
Locale | Dongguan | ||||
Began operation | 27 May 2016 | |||||
Lines in operation | 1 | |||||
No. of stations | 15 | |||||
Network length | 37.743 km (23 mi) | |||||
Ridership | 300,300 (1 Oktober 2019 record). 53.6 million (2019). | |||||
Foshan Metro (FMetro) äœć±±ć°é |
Locale | Foshan & Guangzhou |
[Note 3] [Note 4] | |||
Began operation | 3 November 2010 | |||||
Lines in operation | 3 | |||||
No. of stations | 61 ( List) | |||||
Network length | 112.7 km (70 mi) | |||||
Ridership | 677,900 (31 December 2020 record). | |||||
Guangzhou Metro ćčżć·ć°é |
Locale | Guangzhou |
3 Eastern extension |
[Note 3] [221] [222] [223] | ||
Began operation | 28 June 1997 | |||||
Lines in operation | 16 | |||||
No. of stations | 261 ( List) | |||||
Network length | 621.05 km (385.9 mi) | |||||
Ridership | 11,569,400 (31 December 2019 record). 3305.9 million (2019 annual) | |||||
Macau Light Rapid Transit (Metro Ligeiro de Macau, MLM) æŸłéèŒè» |
Locale | Macau | Taipa |
Seac Pai Van Hengqin |
||
Began operation | 10 December 2019 [27] | |||||
Lines in operation | 1 | |||||
No. of stations | 11 | |||||
Network length | 9.3 km (6 mi) [27] | |||||
Ridership | 48,700 (25 December 2019 record). 0.6 million (2019) | |||||
Mass Transit Railway (MTR) æžŻé” Including KowloonâCanton Railway |
Locale | Hong Kong |
Kwun Tong line Tuen Ma line South Island line Tung Chung line East Rail line Island line Tseung Kwan O line Tsuen Wan line Disneyland Resort line Airport Express |
Tuen Ma line Extension Tung Chung line Extension
|
[Note 5] | |
Began operation | 2 December 2007 (1 October 1979 old MTR) (1 October 1910 KCR) | |||||
Lines in operation | 10 | |||||
No. of stations | 99 ( List) | |||||
Network length | 209.0 km (129.9 mi) | |||||
Ridership | 8,864,700 (22 January 2020 record). 3128.1 million (2019 annual) | |||||
Shenzhen Metro æ·±ćłć°é |
Locale | Shenzhen |
3 East Ext |
[224] [225] [226] | ||
Began operation | 28 December 2004 | |||||
Lines in operation | 16 | |||||
No. of stations | 303 ( List) | |||||
Network length | 547.42 km (340 mi) | |||||
Ridership | 7,708,300 (31 December 2010). 2017.6 million (2019 annual) | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanning Metro ććźć°é |
Locale | Nanning |
4 Eastern extension |
|||
Began operation | 28 June 2016 | |||||
Lines in operation | 5 | |||||
No. of stations | 93 | |||||
Network length | 128.2 km (80 mi) | |||||
Ridership | 1,432,600 (1 January 2021 record). 273.3 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Guiyang Metro (GYURT) 莔éłć°éïŒèŽ”éłèœšéäș€éïŒ |
Locale | Guiyang | S1 | |||
Began operation | 28 December 2017 | |||||
Lines in operation | 2 | |||||
No. of stations | 55 | |||||
Network length | 75.7 km (47.0 mi) | |||||
Ridership | 183,000 (2 December 2018 record). 50.6 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Harbin Metro ćć°æ»šć°é |
Locale | Harbin |
3 Phase 2 |
|||
Began operation | 26 September 2013 | |||||
Lines in operation | 3 | |||||
No. of stations | 62 | |||||
Network length | 79.4 km (49 mi) | |||||
Ridership | 392,400 (31 December 2019). 103.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Luoyang Subway æŽéłć°é |
Locale | Luoyang | 1 2 | N/A | ||
Began operation | 28 March 2021 | |||||
Lines in operation | 2 | |||||
No. of stations | 33 | |||||
Network length | 43.558 km (27 mi) | |||||
Ridership | ||||||
Zhengzhou Metro éć·ć°é |
Locale | Zhengzhou | ||||
Began operation | 28 December 2013 | |||||
Lines in operation | 8 | |||||
No. of stations | 143 | |||||
Network length | 232.5 km (144 mi) | |||||
Ridership | 2,221,760 (31 December 2020 record). 411.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Wuhan Metro æŠæ±ć°é |
Locale | Wuhan |
3 Southern extension
6 Southwest extension |
[227] [228] | ||
Began operation | 28 July 2004 | |||||
Lines in operation | 11 | |||||
No. of stations | 255 [34] ( List) | |||||
Network length | 460.944 km (286 mi) [34] | |||||
Ridership | 1229 million (2019 annual)
[20] 4,456,200 (4 April 2019 Peak) [229] | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changsha Maglev Express éżæČçŁæ”źćż«çșż |
Locale | Changsha | N/A | |||
Began operation | 6 May 2016 | |||||
Lines in operation | 1 | |||||
No. of stations | 3 | |||||
Network length | 18.55 km (12 mi) | |||||
Ridership | ||||||
Changsha Metro éżæČć°é |
Locale | Changsha |
1 Northern extension |
|||
Began operation | 29 April 2014 | |||||
Lines in operation | 6 | |||||
No. of stations | 135 | |||||
Network length | 207.9 km (129.2 mi) | |||||
Ridership | 2,656,900 (31 December 2020 record). 378.2 million (2020). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hohhot Metro ćŒć攩çčć°é |
Locale | Hohhot | 1 2 | N/A | ||
Began operation | 29 December 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 43 | |||||
Network length | 49.039 km (30.5 mi) | |||||
Ridership | 239,400 (31 December 2020 record). 0.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanchang Metro ćæć°é |
Locale | Nanchang | 1 2 3 4 | |||
Began operation | 26 December 2015 | |||||
Lines in operation | 4 | |||||
No. of stations | 94 | |||||
Network length | 128.3 km (80 mi) | |||||
Ridership | 1,447,000 (31 December 2020 record). 174.9 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changchun Rail Transit éżæ„蜚éäș€é |
Locale | Changchun | ||||
Began operation | 30 October 2002 | |||||
Lines in operation | 5 | |||||
No. of stations | 93 | |||||
Network length | 111.2 km (69 mi) | |||||
Ridership | 938,000 (20 December 2019). 213.9 million (2019 annual) [21] | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dalian Metro 性èżć°é |
Locale | Dalian | [230] | |||
Began operation | 8 November 2002 | |||||
Lines in operation | 6 | |||||
No. of stations | 99 ( List) | |||||
Network length | 237.74 km (148 mi) [57] | |||||
Ridership | 724,900 (7 August 2019 record). 203.9 million (2019). | |||||
Shenyang Metro æČéłć°é |
Locale | Shenyang | ||||
Began operation | 27 September 2010 | |||||
Lines in operation | 4 | |||||
No. of stations | 85 ( List) | |||||
Network length | 115.9 km (72 mi) | |||||
Ridership | 1,375,300 (15 November 2019 record). 358.6 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Xi'an Metro è„żćźć°é |
Locale | Xi'an & Xianyang | ||||
Began operation | 16 September 2011 | |||||
Lines in operation | 9 | |||||
No. of stations | 184 | |||||
Network length | 300.4 km (187 mi) | |||||
Ridership | 4,073,041 (31 December 2020). 945.4 (2019 annual). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Jinan Metro æ”ćć°é |
Locale | Jinan | ||||
Began operation | 1 April 2019 | |||||
Lines in operation | 3 | |||||
No. of stations | 40 | |||||
Network length | 84.25 km (52 mi) | |||||
Ridership | 66,800 (31 December 2020 record). 5.75 million (2019). | |||||
Qingdao Metro éćČć°é |
Locale | Qingdao |
2 Phases 1 & 2 adjustments |
|||
Began operation | 16 December 2015 | |||||
Lines in operation | 7 | |||||
No. of stations | 146 | |||||
Network length | 315.86 km (196.3 mi) | |||||
Ridership | (2 May 2021 record). 187.5 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changzhou Metro ćžžć·ć°é |
Locale | Changzhou | 1 2 | 5 | ||
Began operation | 21 September 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 43 | |||||
Network length | 54.03 km (34 mi) | |||||
Ridership | 243,000 (31 October 2019 record). 10.3 million (2019). | |||||
Hangzhou Metro æć·ć°é |
Locale | Hangzhou |
3 Eastern extension |
|||
Began operation | 24 November 2012 | |||||
Lines in operation | 12 | |||||
No. of stations | 251 ( List) | |||||
Network length | 516.2 km (321 mi) | |||||
Ridership | 3,141,400 (31 December 2020 record). 634 million (2019). | |||||
Jinhua Rail Transit éć蜚éäș€é |
Locale | Jinhua |
N/A |
|||
Began operation | 30 August 2022 | |||||
Lines in operation | 2 | |||||
No. of stations | 30 | |||||
Network length | 106.45 km (66 mi) | |||||
Ridership | N/A | |||||
Nanjing Metro ćäșŹć°é |
Locale | Nanjing |
1 Northern extension |
[231] [232] [233] [234] | ||
Began operation | 3 September 2005 | |||||
Lines in operation | 13 | |||||
No. of stations | 201 ( List) | |||||
Network length | 498.66 km (310 mi) | |||||
Ridership | 4,219,000 (31 December 2020 record). 1151.9 million (2019). | |||||
Nantong Rail Transit ćé蜚éäș€é |
Locale | Nantong |
1 South extension |
|||
Began operation | 10 November 2022 | |||||
Lines in operation | 1 | |||||
No. of stations | 28 | |||||
Network length | 39.182 km (24 mi) | |||||
Ridership | N/A | |||||
Ningbo Rail Transit Ningbo Metro ćźæłąèœšéäș€é |
Locale | Ningbo | ||||
Began operation | 30 May 2014 | |||||
Lines in operation | 6 | |||||
No. of stations | 116 | |||||
Network length | 185.36 km (115.18 mi) | |||||
Ridership | 1,014,600 (31 December 2020 record). 167.2 million (2019). | |||||
Shanghai Maglev Train (SMT) äžæ”·çŁæ”źç€șèèżè„çșż |
Locale | Shanghai | N/A | |||
Began operation | 31 December 2002 | |||||
Lines in operation | 1 | |||||
No. of stations | 2 | |||||
Network length | 29.863 km (19 mi) | |||||
Ridership | ||||||
Shanghai Metro äžæ”·ć°é |
Locale | Shanghai (and Kunshan) |
2 Western extension |
[235] [236] [237] [238] | ||
Began operation | 28 May 1993 | |||||
Lines in operation | 19 | |||||
No. of stations | 396 [239] ( List) | |||||
Network length | 802.2 km (498.5 mi) | |||||
Ridership | 13,294,400 (8 March 2019 record). 3880.1 million (2019). | |||||
Shaoxing Metro ç»ć Žèœšéäș€é |
Locale | Shaoxing | 1 2 |
2 Phase 2 |
||
Began operation | 28 June 2021 [30] | |||||
Lines in operation | 2 | |||||
No. of stations | 36 | |||||
Network length | 57.83 km (36 mi) | |||||
Ridership | ||||||
Suzhou Rail Transit Suzhou Metro èć·èœšéäș€é |
Locale | Suzhou | ||||
Began operation | 28 April 2012 | |||||
Lines in operation | 6 | |||||
No. of stations | 181 ( List) | |||||
Network length | 249.47 km (155 mi) | |||||
Ridership | 1,548,000 (2 May 2019 record). 363 million (2019). | |||||
Taizhou Rail Transit ć°ć·èœšéäș€é |
Locale | Taizhou | ||||
Began operation | 28 December 2022 | |||||
Lines in operation | 1 | |||||
No. of stations | 15 | |||||
Network length | 52.566 km (33 mi) | |||||
Ridership | N/A | |||||
Wenzhou Metro æž©ć·èœšéäș€é |
Locale | Wenzhou | ||||
Began operation | 23 January 2019 | |||||
Lines in operation | 1 | |||||
No. of stations | 18 | |||||
Network length | 53.507 km (33 mi) | |||||
Ridership | 71,800 (1 December 2020 not free record). 7.75 million (2019). | |||||
Wuxi Metro æ éĄć°é |
Locale | Wuxi | ||||
Began operation | 1 July 2014 | |||||
Lines in operation | 4 | |||||
No. of stations | 80 | |||||
Network length | 114.8 km (71 mi) | |||||
Ridership | 526,900 (19 December 2020 record). 109.5 million (2019). | |||||
Xuzhou Metro ćŸć·ć°é |
Locale | Xuzhou | ||||
Began operation | 28 September 2019 | |||||
Lines in operation | 3 | |||||
No. of stations | 51 | |||||
Network length | 64.35 km (40 mi) [35] | |||||
Ridership | 256,700 (31 December 2020 record). 7.5 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Taiyuan Metro ć€Șć蜚éäș€é |
Locale | Taiyuan | 2 | 1 | ||
Began operation | 26 December 2020 | |||||
Lines in operation | 1 | |||||
No. of stations | 23 | |||||
Network length | 23.647 km (15 mi) | |||||
Ridership | 216,100 (1 January 2021 record). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
ĂrĂŒmqi Metro äčéČæšéœć°é |
Locale | ĂrĂŒmqi | ||||
Began operation | 25 October 2018 | |||||
Lines in operation | 1 | |||||
No. of stations | 21 | |||||
Network length | 27.615 km (17 mi) | |||||
Ridership | 124,667 (13 October 2019 record). 25.57 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Kunming Metro ææć°é |
Locale | Kunming |
1 Northwestern extension
|
|||
Began operation | 28 June 2012 | |||||
Lines in operation | 6 | |||||
No. of stations | 103 | |||||
Network length | 164.3 km (102 mi) | |||||
Ridership | 811,800 (30 September 2020 record). 214.1 million (2019). | |||||
Notes
- In operation.
- Under test run.
Tram and light rail systems | ||||||||
---|---|---|---|---|---|---|---|---|
System | Locale | Length | Stations | Opened | ||||
Trams in Beijing ( Xijiao line and Yizhuang T1 line) | Beijing | 20.762 km (12.901 mi) | 20 | 2017-12-30 | ||||
Changchun Tram | Changchun | 12.759 km (7.928 mi) | 24 | 1941-11-01 | ||||
Changchun Rail Transit [i] | Changchun | 68.2 km (42.4 mi) | 62 | 2002-10-30 | ||||
Line 2 (Chengdu Tram) | Chengdu | 39.3 km (24.4 mi) | 35 | 2018-12-26 | ||||
Bishan SkyShuttle | Chongqing | 15.4 km (9.6 mi) | 15 | 2021-04-16 [142] | ||||
Dalian Tram | Dalian | 23.4 km (14.5 mi) | 37 | 1909-09-25 | ||||
Trams in Foshan ( Gaoming tram and Nanhai tram) | Foshan | 19.915 km (12.375 mi) [247] | 25 | 2019-12-30 [247] | ||||
Guangzhou Trams ( Haizhu Tram and Huangpu Tram Line 1) | Guangzhou | 22.0 km (13.7 mi) | 30 | 2014-12-31 | ||||
MTR Light Rail | Hong Kong | 36.2 km (22.5 mi) | 68 | 1988-09-18 | ||||
Hong Kong Tramways | Hong Kong | 30.0 km (18.6 mi) | 120 | 1904-07-30 | ||||
Huai'an Tram | Huai'an | 20.07 km (12.47 mi) | 23 | 2015-12-28 | ||||
Huangshi Rail Transit | Huangshi | 26.88 km (16.70 mi) | 28 | 2022-12-28 | ||||
Honghe tram | Mengzi | 13.3 km (8.3 mi) | 15 | 2020-10-01 | ||||
Jiaxing Tram | Jiaxing | 13.8 km (8.6 mi) [248] | 16 [248] | 2021-06-25 | ||||
Nanjing Tram | Nanjing | 16.86 km (10.48 mi) | 26 | 2014-08-01 | ||||
Qingdao Tram | Qingdao | 8.77 km (5.45 mi) | 12 | 2016-03-05 | ||||
Sanya Tram | Sanya | 8.37 km (5.20 mi) [249] | 15 | 2019-01-01 | ||||
Shanghai Songjiang Tram | Shanghai | 31.394 km (19.507 mi) | 45 | 2018-12-26 | ||||
Shenyang Tram | Shenyang | 65 km (40 mi) | 85 | 2013-08-31 | ||||
Shenzhen Tram | Shenzhen | 11.683 km (7.259 mi) | 20 | 2017-10-28 | ||||
Suzhou Tram | Suzhou | 44.36 km (27.56 mi) | 27 | 2014-10-26 | ||||
Tianshui Tram | Tianshui | 12.926 km (8.0 mi) | 11 | 2020-05-01 [250] | ||||
Wenshan Tram | Qiubei | 13.960 km (8.7 mi) [251] | 10 | 2021-05-15 | ||||
Trams in Wuhan | Wuhan | 53.9 km (33.5 mi) | 61 | 2017-07-28 | ||||
Wuyi Tram | Wuyi New Area ( Nanping) | 26.185 km (16.271 mi) [252] | 6 | 2022-01-01 [252] | ||||
Chongli Tram | Zhangjiakou | 1.6 km (0.99 mi) | 6 | 2022-02-04 |
Monorail/maglev systems | ||||||||
---|---|---|---|---|---|---|---|---|
System | Locale | Length | Stations | Opened | ||||
Line S1 (Beijing Subway) | Beijing | 10.2 km (6.3 mi) | 8 | 2017-12-30 | ||||
Changsha Maglev Express | Changsha | 18.55 km (11.5 mi) | 3 | 2016-05-06 | ||||
Chongqing Rail Transit ( Line 2 and Line 3) | Chongqing | 96.5 km (60.0 mi) | 68 | 2004-11-06 | ||||
Fenghuang Maglev | Fenghuang County | 9.121 km (5.7 mi) | 4 | 2022-07-30 | ||||
Liupanshui Tourism Monorail | Liupanshui | 11.0 km (6.8 mi) | 6 | 2019-??-?? | ||||
Shanghai maglev train | Shanghai | 29.86 km (18.6 mi) | 2 | 2002-12-31 | ||||
Wuhu Rail Transit | Wuhu | 46.2 km (28.7 mi) | 35 | 2021-11-03 | ||||
Xishui County Tourist Train | Xishui County | 11.5 km (7.1 mi) | 6 | 2020-??-?? | ||||
Yinchuan Flower Expo Park Cloud Rail | Yinchuan | 5.7 km (3.5 mi) | 8 | 2017-??-?? | ||||
Optics Valley Suspended Monorail Line | Wuhan | 10 km (6.2 mi) | 6 | 2023-09-23 |
Vehicle type | Length (m) | Width (m) | Capacity |
---|---|---|---|
Type A | 22.8 | 3.0-3.08 | 310 |
Type B [a] | 19.0 | 2.8-2.88 | 240 |
Type AS [b] | 19.0 | 3.0-3.08 | 254-266 |
Type AH [c] | 19.52 | 3.0-3.08 | 254 |
Type LB | 16.8 | 2.8 | 215-240 |
Type C [d] | 18.9-30.4 | 2.6 | 200-315 |
Type D | 22.0 | 3.3 | - |
çłćź¶ćș蜚éäș€éèżè„éçšć°ćąèł61.6ć Źé
èżè„éçš9.7ć ŹéïŒćŒéćć°äžæąææćčłçșżèŽŻéèżè„ăć±æ¶ïŒćäșŹććžèœšéäș€éçșżè·Żć ±èźĄ27æĄïŒèżè„æ»éçšèŸŸ807ć Źé
ćè”·äž°ć°ćșéć Źćșç«ïŒćèłæżć±±ćșèćșç«ăć šéż24.79ć ŹéïŒèźŸ11ćș§èœŠç«
30æ„èżć°ćŒéæżć±±çșżéæäžèłèćșçäžç«äžćșéŽïŒéżćșŠçșŠ2.2ć Źé
2ć·çșżèżè„éçšćąéż4.4ć ŹéïŒèŸŸć°24.9ć Źé
èżæć°æć „èŻèżè„çéŠéæź”è”·äșéœäŸŻèæșȘć汿ç«ïŒç»äșä»ć±±èșæŽČć€éç«ïŒć ±èźŸç«17ćș§ïŒć ¶äžéć±±ăæŽȘćĄè·Żç«ăćžć°æ±ç«äžșæąäčç«ăçșżè·Żć šéżçșŠ22.4ć ŹéïŒćäžșć°äžçșżïŒćŒèĄæ¶éŽçșŠ40ćé
6ć·çșżè”·äșæœćą©ç«ïŒæąäșäžćŻżç«ïŒć šéżçșŠ31.346ć ŹéïŒèźŸ16äžȘç«ïŒć ¶äžé«æ¶ç«1ćș§ïŒć°äžç«15ćș§
ćčżć·ćž2021ćčŽć件æ°çćźäșæŸç€șïŒ2021ćčŽćčżć·ć°ćäșćŒéèŻèżè„ć°é18ć·çșżć éæź”ïŒäžéĄ·æČ-ćŒæïŒ58.3ć ŹéïŒă22ć·çșżć éæź”ïŒçȘçŠșćčżćș-é怎ćČïŒ18.2ć ŹéïŒ
äžș9ć·çșżçäžæź”ïŒç±æąæ1ć·çșżäžŽćčłæŻçșżæćçŹç«èżè„ææïŒéżçșŠ12.5ć Źé
æŁçșżć šéż27.32km
汯銏ç·äžæçè”°ç·ç±çæșȘæČèłććŸ·ć ±12ćè»ç«...ć šç·é·ćșŠçŽ17ć Źé
5ć·çșżèżè„æ»éçšć°ć»¶éżèł47.393ć Źé
éć·ćžèœšéäș€é1ć·çșżć šéż41.2kmïŒèźŸç«30ćș§ïŒćäžșć°äžèœŠç«ăć ¶äžïŒ1ć·çșżäžæć·„çšçșżè·ŻéżçșŠ26.2kmïŒèźŸç«20ćș§...1ć·çșżäșæć·„çšçșżè·Żć šéżçșŠ15 kmïŒèźŸç«10ćș§...
ć šéżçșŠ14.2ć Źé
çșżè·Żć šéż9.7ć ŹéïŒćäžșć°äžçșż
18ć·çșżäžćČç«ïŒäžć«ïŒèłć€©ćșæșćșćç«æź”äșæĄçșżè·Żć°ćæ„ćŒéćæèżè„
6ć·çșżć šéżçșŠ68.88kmïŒć ±èźŸæ56ćș§èœŠç«
éæ”æ©ć Žć°ć€©ćșæ©ć Ž30ćéŸ-æéœć°é”19èç·äșæä»æ„/
5ć·çșżćć»¶äŒžæź”è”·äșććäžćżç«ïŒäžć«ïŒïŒæąäșæŠæžŻćè·Żç«ïŒçșżè·Żć šéż8.95ć Źé
çșżè·Żć šéżçșŠ28.22 kmïŒć ¶äžïŒé«æ¶çșżćć°éąçșż22.42 kmïŒć°äž5.8 kmïŒèźŸèœŠç«7ćș§
æŹæćłć°ćŒéèżè„23äžȘ蜊ç«ïŒæ°æĄ„ç«ăéźèœźæŻæžŻç«ăćźćŁæčç«3äžȘç«çčæäžćŒæŸ
éćșć°é9ć·çșżäșæć·„çš(ć Žç§ć€§éâè±çłæČ)çșżè·Żć šéżçșŠ7.8ć ŹéïŒć ±èźŸ5ćș§èœŠç«
éćș蜚éäș€é10ć·çșżäșæ(éČ€é±Œæ± èłćć Ą)ćććè”°ćïŒçșżè·Żć šéż6ć Źé
ć šéżçșŠ13.447ć米ïŒæ»æè”çșŠ99.01äșżć ïŒć šçșżć°äžïŒć ±èźŸ8ćș§èœŠç«
çșżè·Żć šéżçșŠ6.2km
æć·æșćș蜚éćż«çșżć·„çšè”·çčèæșȘç«ïŒç»çčéæ±ç«ïŒçșżè·Żéż59.14ć ŹéïŒć°äžçșżéżćșŠ47.105ć ŹéïŒé«æ¶æź”éżćșŠ12.034ć ŹéïŒć ¶äžäžæçŹé«éćć»ș10.266ć Źéăć šçșżć ±èźŸèœŠç«17ćș§ïŒć ¶äžé«æ¶ç«4ćș§ïŒć°äžç«13ćș§
çźćć°é3ć·çșżäžæć·„çšçșżè·Żć šéż5.45ć Źé
ćè„蜚éäș€é4ć·çșżć»¶éżçșżćźäș5æ1æ„10:00æŁćŒćŒéèżè„ïŒèżæćłçïŒè„è„żćłć°èżć „ćć°éæ¶ä»Łă4ć·çșżć滶çșżć šéż13.97ć Źé
äčäžçșżéŠéæź”éż26.8kmïŒè”·äșćäșç«ïŒç»ç±äčäčćœé ć莞ćăäžéłćžäž»ććșć°èŸŸäœèČéŠç«ïŒć ±æ11ćș§èœŠç«ïŒć ¶äžé«æ¶ç«6ćș§ïŒć°äžç«5ćș§
ć äžć·Čäș2012ćčŽ6æ28æ„ćŒéèżè„çć°é6ć·çșżäžæ18.018ć Źé
11ć·çșżçŠç°èłćČćŠććșéŽïŒçșżæź”ć šéż1.6ć Źé
ćčŽćșćæćŒéé«ćșćç«ăćæŽæç«ăćœć±è·Żç«ăäžæČœè·Żç« (Stations will open in this year: Gaozhuangzi, Beiyangcun, Guozhanlu, Donggulu.)
è„żæź”äžć ±10äžȘ蜊ç«ïŒçșŠ16.7ć Źé
æ»éż26.185km