From Wikipedia, the free encyclopedia
Line 5
  5 
Overview
StatusOperational
Owner Nanning
Locale Nanning, Guangxi, China
Termini
Stations17
Service
Type Rapid transit
System Nanning Metro
Services1
Operator(s) Nanning Rail Transit Corporation
Rolling stock6-car Type B
History
OpenedDecember 16, 2021; 2 years ago (2021-12-16)
Technical
Line length20.2 km (12.55 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Line 5 train interior LCDs

Line 5 of the Nanning Metro is a rapid transit line in Nanning which opened on 16 December 2021. The line is 20.2 km long with 17 stations and uses driverless 6-car Type B trains. [1] [2] [3]

Opening timeline

Segment Commencement Length Station(s) Name
Guokai Dadao — Jinqiao Coach Station 16 December 2021 20.2 km (12.55 mi) 17 Phase 1

Stations

Station name Transfer Distance
km
Location
English Chinese Zhuang
Guokai Dadao 国凯大道 Daihloh Gozgaij 0 0 Jiangnan
Nahong Overpass 那洪立交 Nazhungz Lizgyauh   4 
Jinkai Lu 金凯路 Roen Ginhgaij
Jiangnan Park 江南公园 Gyanghnanz Gunghyenz
Zhoujiapo 周家坡 Couhgyahboh
Wuyi Overpass 五一立交 Vujyiz Lizgyauh
Xinxiu Park 新秀公园 Sinhsiu Gunghyenz Xixiangtang
Guangxi University 广西大学 Gvangjsih Dayoz   1 
Xiuling Lu 秀灵路 Roen Siulingz
Mingxiu Lu 明秀路 Roen Mingzsiu   2 
Beihu Nanlu 北湖南路 Roen Namz Bwzhuz
Huqiu 虎邱 Hujgiuh Xingning
Shishan Park 狮山公园 Swhsanh Gunghyenz
Xiaojicun 小鸡村 Siujgihcunh   3 
Yongbin Overpass 邕宾立交 Yunghbinh Lizgyauh
Jiangqiao 降桥 Gyanggyauz
Jinqiao Coach Station 金桥客运站 Camh Yinhhek Ginhgyauz

References

  1. ^ "Nanning opens driverless Line 5". Metro Report International. 2021-12-23. Retrieved 2022-03-29.
  2. ^ "1st automatic metro line on run in Nanning". gxzf.gov.cn. 2021-12-24. Retrieved 2022-03-29.
  3. ^ "Initial operation of Nanning Metro Line 5 enters into stage of no-load test run". nanning.gov.cn. 2021-08-20. Retrieved 2022-03-29.
From Wikipedia, the free encyclopedia
Line 5
  5 
Overview
StatusOperational
Owner Nanning
Locale Nanning, Guangxi, China
Termini
Stations17
Service
Type Rapid transit
System Nanning Metro
Services1
Operator(s) Nanning Rail Transit Corporation
Rolling stock6-car Type B
History
OpenedDecember 16, 2021; 2 years ago (2021-12-16)
Technical
Line length20.2 km (12.55 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Line 5 train interior LCDs

Line 5 of the Nanning Metro is a rapid transit line in Nanning which opened on 16 December 2021. The line is 20.2 km long with 17 stations and uses driverless 6-car Type B trains. [1] [2] [3]

Opening timeline

Segment Commencement Length Station(s) Name
Guokai Dadao — Jinqiao Coach Station 16 December 2021 20.2 km (12.55 mi) 17 Phase 1

Stations

Station name Transfer Distance
km
Location
English Chinese Zhuang
Guokai Dadao 国凯大道 Daihloh Gozgaij 0 0 Jiangnan
Nahong Overpass 那洪立交 Nazhungz Lizgyauh   4 
Jinkai Lu 金凯路 Roen Ginhgaij
Jiangnan Park 江南公园 Gyanghnanz Gunghyenz
Zhoujiapo 周家坡 Couhgyahboh
Wuyi Overpass 五一立交 Vujyiz Lizgyauh
Xinxiu Park 新秀公园 Sinhsiu Gunghyenz Xixiangtang
Guangxi University 广西大学 Gvangjsih Dayoz   1 
Xiuling Lu 秀灵路 Roen Siulingz
Mingxiu Lu 明秀路 Roen Mingzsiu   2 
Beihu Nanlu 北湖南路 Roen Namz Bwzhuz
Huqiu 虎邱 Hujgiuh Xingning
Shishan Park 狮山公园 Swhsanh Gunghyenz
Xiaojicun 小鸡村 Siujgihcunh   3 
Yongbin Overpass 邕宾立交 Yunghbinh Lizgyauh
Jiangqiao 降桥 Gyanggyauz
Jinqiao Coach Station 金桥客运站 Camh Yinhhek Ginhgyauz

References

  1. ^ "Nanning opens driverless Line 5". Metro Report International. 2021-12-23. Retrieved 2022-03-29.
  2. ^ "1st automatic metro line on run in Nanning". gxzf.gov.cn. 2021-12-24. Retrieved 2022-03-29.
  3. ^ "Initial operation of Nanning Metro Line 5 enters into stage of no-load test run". nanning.gov.cn. 2021-08-20. Retrieved 2022-03-29.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook