The result was: promoted by
SL93 (
talk) 17:22, 5 February 2022 (UTC)
DYK toolbox |
---|
5x expanded by Bloom6132 ( talk). Self-nominated at 02:40, 12 January 2022 (UTC).
"Zeidler first joined an architectural firm with Blackwell and Craig in Peterborough, Ontario. He later relocated to Toronto in 1963 and worked for the firm became Craig, Zeidler and Strong until 1975. One of the essential elements of his early works is his employment of striking interior atrium space, which became widespread on an international level during the 1970s. Moreover, his experience in the Bauhaus school made him familiar with the technological matters in building design. These included structural and mechanical services (most notably, exposed air-handling ducts), as well as aspects that ease movement and communication. This was exemplified in the McMaster University Health Science Centre, his breakthrough project, which was meant to resemble a large construction set for children. The building utilized regular geometric building modules, coupled with glazed service and circulation towers, internally exposed steel trusses, ducts, and an automated materials delivery system. Most of Zeidler's structures were public buildings."
Apart from that:
The result was: promoted by
SL93 (
talk) 17:22, 5 February 2022 (UTC)
DYK toolbox |
---|
5x expanded by Bloom6132 ( talk). Self-nominated at 02:40, 12 January 2022 (UTC).
"Zeidler first joined an architectural firm with Blackwell and Craig in Peterborough, Ontario. He later relocated to Toronto in 1963 and worked for the firm became Craig, Zeidler and Strong until 1975. One of the essential elements of his early works is his employment of striking interior atrium space, which became widespread on an international level during the 1970s. Moreover, his experience in the Bauhaus school made him familiar with the technological matters in building design. These included structural and mechanical services (most notably, exposed air-handling ducts), as well as aspects that ease movement and communication. This was exemplified in the McMaster University Health Science Centre, his breakthrough project, which was meant to resemble a large construction set for children. The building utilized regular geometric building modules, coupled with glazed service and circulation towers, internally exposed steel trusses, ducts, and an automated materials delivery system. Most of Zeidler's structures were public buildings."
Apart from that: