This article is within the scope of WikiProject Pennsylvania, a collaborative effort to improve the coverage of
Pennsylvania on Wikipedia. If you would like to participate, please visit the project page, where you can join
the discussion and see a list of open tasks.PennsylvaniaWikipedia:WikiProject PennsylvaniaTemplate:WikiProject PennsylvaniaPennsylvania articles
This article is within the scope of the U.S. Roads WikiProject, an attempt to build a comprehensive and detailed guide to
state highways and other major
roads in the
United States. If you would like to participate, you can edit the article attached to this page, or visit the
project page, where you can join the project and/or contribute to the
discussion.U.S. RoadsWikipedia:WikiProject U.S. RoadsTemplate:WikiProject U.S. RoadsU.S. road transport articles
The Brandywine-river bridge-section, of PA-52, in Pocobson, is now supposedly CLOSED, for widening, and reconstruction of the bridge-approach, on the North[east], side of the river [as of early-NOV 2019]. — Preceding
unsigned comment added by
Leftblank15 (
talk •
contribs)
02:27, 7 November 2019 (UTC)reply
This article is within the scope of WikiProject Pennsylvania, a collaborative effort to improve the coverage of
Pennsylvania on Wikipedia. If you would like to participate, please visit the project page, where you can join
the discussion and see a list of open tasks.PennsylvaniaWikipedia:WikiProject PennsylvaniaTemplate:WikiProject PennsylvaniaPennsylvania articles
This article is within the scope of the U.S. Roads WikiProject, an attempt to build a comprehensive and detailed guide to
state highways and other major
roads in the
United States. If you would like to participate, you can edit the article attached to this page, or visit the
project page, where you can join the project and/or contribute to the
discussion.U.S. RoadsWikipedia:WikiProject U.S. RoadsTemplate:WikiProject U.S. RoadsU.S. road transport articles
The Brandywine-river bridge-section, of PA-52, in Pocobson, is now supposedly CLOSED, for widening, and reconstruction of the bridge-approach, on the North[east], side of the river [as of early-NOV 2019]. — Preceding
unsigned comment added by
Leftblank15 (
talk •
contribs)
02:27, 7 November 2019 (UTC)reply