![]() | ||||
Route information | ||||
Maintained by ODOT | ||||
Length | 50.43 mi [1] (81.16 km) | |||
Existed | 1928–present | |||
Major junctions | ||||
South end | ![]() ![]() | |||
North end | ![]() | |||
Location | ||||
Country | United States | |||
State | Ohio | |||
Counties | Holmes, Wayne, Stark, Summit | |||
Highway system | ||||
| ||||
|
State Route 241 (SR 241) is a north–south state highway in the northeastern portion of the U.S. state of Ohio. Its southern terminus is at U.S. Route 62 in Millersburg, and its northern terminus is at State Route 18 in Akron.
SR 241 was commissioned in 1924, between Massillon and Akron. [2] [3] The route was extended south to Millersburg in 1937. [4] [5] In 2009 the northern terminus was changed from Massillon Road to Seiberling Street and Innovation Way in Akron. [6]
County | Location | mi [1] | km | Destinations | Notes |
---|---|---|---|---|---|
Holmes | Millersburg | 0.00 | 0.00 | ![]() ![]() | |
Wayne | Mount Eaton | 16.10 | 25.91 | ![]() ![]() ![]() ![]() | Western end of US 250 concurrency; southern terminus of SR 94 |
16.23 | 26.12 | ![]() ![]() | Eastern end of US 250 concurrency | ||
Stark | Tuscarawas Township | 24.02 | 38.66 | ![]() ![]() | Western end of SR 93 concurrency |
24.16 | 38.88 | ![]() ![]() | Eastern end of SR 93 concurrency | ||
24.74 | 39.82 | ![]() | |||
Massillon | 28.33– 28.69 | 45.59– 46.17 | ![]() | ||
29.48 | 47.44 | ![]() ![]() | Western end of SR 172 concurrency | ||
30.23 | 48.65 | ![]() ![]() | Eastern end of SR 172 concurrency | ||
Jackson Township | 34.79 | 55.99 | ![]() ![]() | Western terminus of SR 687 | |
Summit | Green | 42.31 | 68.09 | ![]() | |
43.02 | 69.23 | ![]() | |||
Akron | 46.76 | 75.25 | ![]() | ||
48.83 | 78.58 | ![]() ![]() | Eastern terminus of SR 764 | ||
50.30 | 80.95 | ![]() | |||
50.43 | 81.16 | ![]() | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
![]() | ||||
Route information | ||||
Maintained by ODOT | ||||
Length | 50.43 mi [1] (81.16 km) | |||
Existed | 1928–present | |||
Major junctions | ||||
South end | ![]() ![]() | |||
North end | ![]() | |||
Location | ||||
Country | United States | |||
State | Ohio | |||
Counties | Holmes, Wayne, Stark, Summit | |||
Highway system | ||||
| ||||
|
State Route 241 (SR 241) is a north–south state highway in the northeastern portion of the U.S. state of Ohio. Its southern terminus is at U.S. Route 62 in Millersburg, and its northern terminus is at State Route 18 in Akron.
SR 241 was commissioned in 1924, between Massillon and Akron. [2] [3] The route was extended south to Millersburg in 1937. [4] [5] In 2009 the northern terminus was changed from Massillon Road to Seiberling Street and Innovation Way in Akron. [6]
County | Location | mi [1] | km | Destinations | Notes |
---|---|---|---|---|---|
Holmes | Millersburg | 0.00 | 0.00 | ![]() ![]() | |
Wayne | Mount Eaton | 16.10 | 25.91 | ![]() ![]() ![]() ![]() | Western end of US 250 concurrency; southern terminus of SR 94 |
16.23 | 26.12 | ![]() ![]() | Eastern end of US 250 concurrency | ||
Stark | Tuscarawas Township | 24.02 | 38.66 | ![]() ![]() | Western end of SR 93 concurrency |
24.16 | 38.88 | ![]() ![]() | Eastern end of SR 93 concurrency | ||
24.74 | 39.82 | ![]() | |||
Massillon | 28.33– 28.69 | 45.59– 46.17 | ![]() | ||
29.48 | 47.44 | ![]() ![]() | Western end of SR 172 concurrency | ||
30.23 | 48.65 | ![]() ![]() | Eastern end of SR 172 concurrency | ||
Jackson Township | 34.79 | 55.99 | ![]() ![]() | Western terminus of SR 687 | |
Summit | Green | 42.31 | 68.09 | ![]() | |
43.02 | 69.23 | ![]() | |||
Akron | 46.76 | 75.25 | ![]() | ||
48.83 | 78.58 | ![]() ![]() | Eastern terminus of SR 764 | ||
50.30 | 80.95 | ![]() | |||
50.43 | 81.16 | ![]() | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|