Shaoxing Metro | |||
---|---|---|---|
Overview | |||
Locale | Shaoxing, Zhejiang Province, China | ||
Transit type | Rapid transit | ||
Number of lines | 2 | ||
Number of stations | 37 | ||
Daily ridership | 105,151 (ave. 2023) | ||
Annual ridership | 34,38 M (2023) | ||
Website |
www | ||
Operation | |||
Began operation | 28 June 2021[1] | ||
Operator(s) | Shaoxing Rail Transit Group Co., Ltd. | ||
Technical | |||
System length | 61.9 km (38.5 mi) (in operation) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
|
Shaoxing Metro ( Chinese: 绍兴轨道交通; pinyin: Shàoxīng Guǐdào Jiāotōng), also known as Shaoxing Rail Transit, is the metro system in Shaoxing, Zhejiang province, China.
Line | Terminals | Commencement | Newest Extension |
Length km |
Stations | Operator | |
---|---|---|---|---|---|---|---|
1 | Guniangqiao | Fangquan | 28 June 2021 | 1 April 2024 | 51.2 | 30 | Shaoxing Rail Transit Group Co., Ltd. |
2 | Jinghu Hospital | Tandu | 26 July 2023 [2] | 10.73 [3] | 9 | Shaoxing Rail Transit Group Co., Ltd. | |
Total | 61.9 | 38 |
Line 1 began construction in 2016. The section from Guniangqiao to China Textile City opened on 28 June 2021, [1] the remaining section from China Textile City to Fangquan opened on 29 April 2022. A branch line from Huangjiu Town to Convention & Exhibition Center will open in 2024. [4]
The western terminus, Guniangqiao, is also the eastern terminus of Hangzhou Metro Line 5.
Line 2 is 10.73 km in length with 9 stations. [3] [5] All stations are located underground. [2] Line 2 opened on 26 July 2023. [2]
Route | Name | Termini | Planned Opening | Length | Stations | Status | Notes | |
---|---|---|---|---|---|---|---|---|
1 | Branch | Exhibition And Convention Center | Huangjiu Town | 2024 [4] | 7.3 km | 6 | Under construction | [4] |
The Phase II Construction Plan of Shaoxing Metro, including Line 2 (Phase 2) and Lines 3, 4, 5, is under planning. Line 4 is a southern extension of the Line 1 branch which is currently under construction. [6]
Lines S2 (Shaoxing–Zhuji) and S3 (Shaoxing–Shengzhou–Xinchang) are under planning. [7]
目前,绍兴地铁1号线支线共5座车站中,除绍兴北站站外,其余4座车站土建工程已完工,计划至2024年底支线全线开通
4号线一期:将现有1号线支线拆分为4号线,并在此基础上向南延伸
Shaoxing Metro | |||
---|---|---|---|
Overview | |||
Locale | Shaoxing, Zhejiang Province, China | ||
Transit type | Rapid transit | ||
Number of lines | 2 | ||
Number of stations | 37 | ||
Daily ridership | 105,151 (ave. 2023) | ||
Annual ridership | 34,38 M (2023) | ||
Website |
www | ||
Operation | |||
Began operation | 28 June 2021[1] | ||
Operator(s) | Shaoxing Rail Transit Group Co., Ltd. | ||
Technical | |||
System length | 61.9 km (38.5 mi) (in operation) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
|
Shaoxing Metro ( Chinese: 绍兴轨道交通; pinyin: Shàoxīng Guǐdào Jiāotōng), also known as Shaoxing Rail Transit, is the metro system in Shaoxing, Zhejiang province, China.
Line | Terminals | Commencement | Newest Extension |
Length km |
Stations | Operator | |
---|---|---|---|---|---|---|---|
1 | Guniangqiao | Fangquan | 28 June 2021 | 1 April 2024 | 51.2 | 30 | Shaoxing Rail Transit Group Co., Ltd. |
2 | Jinghu Hospital | Tandu | 26 July 2023 [2] | 10.73 [3] | 9 | Shaoxing Rail Transit Group Co., Ltd. | |
Total | 61.9 | 38 |
Line 1 began construction in 2016. The section from Guniangqiao to China Textile City opened on 28 June 2021, [1] the remaining section from China Textile City to Fangquan opened on 29 April 2022. A branch line from Huangjiu Town to Convention & Exhibition Center will open in 2024. [4]
The western terminus, Guniangqiao, is also the eastern terminus of Hangzhou Metro Line 5.
Line 2 is 10.73 km in length with 9 stations. [3] [5] All stations are located underground. [2] Line 2 opened on 26 July 2023. [2]
Route | Name | Termini | Planned Opening | Length | Stations | Status | Notes | |
---|---|---|---|---|---|---|---|---|
1 | Branch | Exhibition And Convention Center | Huangjiu Town | 2024 [4] | 7.3 km | 6 | Under construction | [4] |
The Phase II Construction Plan of Shaoxing Metro, including Line 2 (Phase 2) and Lines 3, 4, 5, is under planning. Line 4 is a southern extension of the Line 1 branch which is currently under construction. [6]
Lines S2 (Shaoxing–Zhuji) and S3 (Shaoxing–Shengzhou–Xinchang) are under planning. [7]
目前,绍兴地铁1号线支线共5座车站中,除绍兴北站站外,其余4座车站土建工程已完工,计划至2024年底支线全线开通
4号线一期:将现有1号线支线拆分为4号线,并在此基础上向南延伸