RiyadhâQurayyat line | |||
---|---|---|---|
Overview | |||
Other name(s) | North-South Line North-South Railway | ||
Owner | Saudi Railway Company (SAR) | ||
Locale | Al Jawf Region, Ha'il Region, Al-Qassim Region and Riyadh Region | ||
Termini | |||
Stations | 6 | ||
Website | http://www.sar.com.sa/ | ||
Service | |||
Type | Inter-city rail | ||
Rolling stock | CAF Diesel push-pull train | ||
History | |||
Opened | 26 February 2017 | ||
Technical | |||
Line length | 1,242 km (772 mi) | ||
Number of tracks | 1 | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | None | ||
Operating speed | 200 km/h (120 mph) | ||
|
The RiyadhâQurayyat line is a railway line in Saudi Arabia that connects the cities of Riyadh and Qurayyat. The 1,242 km line [1] [2] begins at Al-Qurrayat and passes through Al-Jouf, Hail and Al-Qassim regions before terminating in Riyadh. The line shares infrastructure with the SAR NorthâSouth Railway line between Buraidah and Al Nafud.
The line was built at an estimated cost of SAR 20 billion. In March 2012, the Saudi Railways Organization (SRO) signed a contract worth SAR 553 million with CAF to design and manufacture six 200 km/h diesel push-pull trains. [3] [4] CAF handed over the first train to the Saudi Railway Company (SAR) in September 2015. [5]
A trial run was conducted on the line between Riyadh and Majmah in October 2016. [6] Passengers services between Riyadh and Qassim began on 26 February 2017. [7] The service was in 2018 expanded to Al-Qurayyat. [8]
There are six stations on the line: Riyadh, Majma'a, Qassim, Hail, Al-Jawf, and Al-Qurayyat.
RiyadhâQurayyat line | |||
---|---|---|---|
Overview | |||
Other name(s) | North-South Line North-South Railway | ||
Owner | Saudi Railway Company (SAR) | ||
Locale | Al Jawf Region, Ha'il Region, Al-Qassim Region and Riyadh Region | ||
Termini | |||
Stations | 6 | ||
Website | http://www.sar.com.sa/ | ||
Service | |||
Type | Inter-city rail | ||
Rolling stock | CAF Diesel push-pull train | ||
History | |||
Opened | 26 February 2017 | ||
Technical | |||
Line length | 1,242 km (772 mi) | ||
Number of tracks | 1 | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | None | ||
Operating speed | 200 km/h (120 mph) | ||
|
The RiyadhâQurayyat line is a railway line in Saudi Arabia that connects the cities of Riyadh and Qurayyat. The 1,242 km line [1] [2] begins at Al-Qurrayat and passes through Al-Jouf, Hail and Al-Qassim regions before terminating in Riyadh. The line shares infrastructure with the SAR NorthâSouth Railway line between Buraidah and Al Nafud.
The line was built at an estimated cost of SAR 20 billion. In March 2012, the Saudi Railways Organization (SRO) signed a contract worth SAR 553 million with CAF to design and manufacture six 200 km/h diesel push-pull trains. [3] [4] CAF handed over the first train to the Saudi Railway Company (SAR) in September 2015. [5]
A trial run was conducted on the line between Riyadh and Majmah in October 2016. [6] Passengers services between Riyadh and Qassim began on 26 February 2017. [7] The service was in 2018 expanded to Al-Qurayyat. [8]
There are six stations on the line: Riyadh, Majma'a, Qassim, Hail, Al-Jawf, and Al-Qurayyat.