The Medina Metro or Madinah Metro is a planned three-line metro system for the city of Medina, Saudi Arabia. [1]
On 4 November 2013 the Saudi cabinet announced that a metro would be built in Madinah within eight years. [2] A committee for the project was to be chaired by the Governor of Medina, Prince Faisal bin Salman. [2]
In March 2015 the Madinah Metro Development Authority (MMDA) awarded French companies Systra (consortium leader) and Egis Group a 12-month contract to carry out feasibility studies and produce preliminary design for the metro. [1] The network is to be built in two phases for opening in 2020s. [1]
Total route length of 95 km. 25 km would be underground and 48 km elevated. [1]
This article needs additional citations for
verification. (July 2016) |
Madinah Metro | |
---|---|
Overview | |
Owner | Madinah Metro Development Authority (MMDA) |
Locale | Medina |
Transit type | Rapid transit |
Number of lines | 3 (projected) [1] |
Operation | |
Operation will start | after 2024 [1][ needs update] |
Technical | |
System length | 95 km (59 mi) (projected) |
The Medina Metro or Madinah Metro is a planned three-line metro system for the city of Medina, Saudi Arabia. [1]
On 4 November 2013 the Saudi cabinet announced that a metro would be built in Madinah within eight years. [2] A committee for the project was to be chaired by the Governor of Medina, Prince Faisal bin Salman. [2]
In March 2015 the Madinah Metro Development Authority (MMDA) awarded French companies Systra (consortium leader) and Egis Group a 12-month contract to carry out feasibility studies and produce preliminary design for the metro. [1] The network is to be built in two phases for opening in 2020s. [1]
Total route length of 95 km. 25 km would be underground and 48 km elevated. [1]