Name | Span | Length | Type | Carries Crosses |
Opened | Location | District | Ref. | ||
---|---|---|---|---|---|---|---|---|---|---|
1 | Okavango River Bridge | 200 m (660 ft) | 1,161 m (3,809 ft) |
Cable-stayed Composite steel/concrete deck, steel pylons 100+200+100 |
Road bridge Okavango River |
2022 |
Shakawe–
Goa 18°16′22.8″S 21°47′43.4″E / 18.273000°S 21.795389°E |
North-West District |
[S 1] [1] [2] | |
![]() |
2 | Kazungula Bridge | 129 m (423 ft) | 923 m (3,028 ft) |
Extradosed Concrete box girder deck, 6 concrete pylons Rail-road bridge 54+85+5x129+85+54 |
2020 |
Kasane–
Kazungula 17°47′28.4″S 25°15′45.0″E / 17.791222°S 25.262500°E |
Chobe District![]() |
[Note 1] [S 2] [3] [4] |
Name | Span | Length | Type | Carries Crosses |
Opened | Location | District | Ref. | ||
---|---|---|---|---|---|---|---|---|---|---|
1 | Okavango River Bridge | 200 m (660 ft) | 1,161 m (3,809 ft) |
Cable-stayed Composite steel/concrete deck, steel pylons 100+200+100 |
Road bridge Okavango River |
2022 |
Shakawe–
Goa 18°16′22.8″S 21°47′43.4″E / 18.273000°S 21.795389°E |
North-West District |
[S 1] [1] [2] | |
![]() |
2 | Kazungula Bridge | 129 m (423 ft) | 923 m (3,028 ft) |
Extradosed Concrete box girder deck, 6 concrete pylons Rail-road bridge 54+85+5x129+85+54 |
2020 |
Kasane–
Kazungula 17°47′28.4″S 25°15′45.0″E / 17.791222°S 25.262500°E |
Chobe District![]() |
[Note 1] [S 2] [3] [4] |