This article has multiple issues. Please help
improve it or discuss these issues on the
talk page. (
Learn how and when to remove these template messages)
|
The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela. As of 2015 [update], including Los Teques Metro, the Caracas Metro is made up of 52 stations. [1]
Below is a list of the Caracas Metro lines and the stations that they serve.
Line 1 of the Caracas Metro currently serves 22 stations, and has a route length of 20.4 kilometres (12.7 mi). [2] Its initial section opened in 1983 as the city's first rapid transit line. [2] It was extended thrice during the 1980s, reaching Palo Verde, current eastern terminus, in 1989.
Line 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 2 operates on much of the same route that Line 4 does. From north-east to south-west its stations are:
Line 3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 3 of the Caracas Metro currently serves 8 stations besides the interchange to Line 1, Plaza Venezuela, and has a route length of 10.4 kilometres (6.5 mi). [2] It started revenue service between Plaza Venezuela and El Valle in 1994; [2] it was later extended to La Rinconada in 2006, but this section did not become fully operational until 2010, with the opening of the three intermediate stations. [4]
Line 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Line 4 was operates on much of the same route that Line 2 does.
From east to west:
This line is still under construction.
First phase – from west to east:
The following stations found in the City of Caracas are under construction, as part of the project known as the Guarenas / Guatire Metro:
Most of this line is still in planning. It will connect Line 2 and Line 3.
The following stations are under construction:
This is a light rail line. The following stations are under construction, as part of the project known as the Guarenas / Guatire Metro:
This article has multiple issues. Please help
improve it or discuss these issues on the
talk page. (
Learn how and when to remove these template messages)
|
The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela. As of 2015 [update], including Los Teques Metro, the Caracas Metro is made up of 52 stations. [1]
Below is a list of the Caracas Metro lines and the stations that they serve.
Line 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 1 of the Caracas Metro currently serves 22 stations, and has a route length of 20.4 kilometres (12.7 mi). [2] Its initial section opened in 1983 as the city's first rapid transit line. [2] It was extended thrice during the 1980s, reaching Palo Verde, current eastern terminus, in 1989.
Line 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 2 operates on much of the same route that Line 4 does. From north-east to south-west its stations are:
Line 3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Line 3 of the Caracas Metro currently serves 8 stations besides the interchange to Line 1, Plaza Venezuela, and has a route length of 10.4 kilometres (6.5 mi). [2] It started revenue service between Plaza Venezuela and El Valle in 1994; [2] it was later extended to La Rinconada in 2006, but this section did not become fully operational until 2010, with the opening of the three intermediate stations. [4]
Line 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Line 4 was operates on much of the same route that Line 2 does.
From east to west:
This line is still under construction.
First phase – from west to east:
The following stations found in the City of Caracas are under construction, as part of the project known as the Guarenas / Guatire Metro:
Most of this line is still in planning. It will connect Line 2 and Line 3.
The following stations are under construction:
This is a light rail line. The following stations are under construction, as part of the project known as the Guarenas / Guatire Metro: