Englewood Avenue | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location |
Beacon Street at Englewood Avenue Brookline, Massachusetts | ||||||||||
Coordinates | 42°20′13″N 71°08′43″W / 42.337049°N 71.145357°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Passengers | |||||||||||
2011 | 555 (weekday average boardings) [1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Englewood Avenue station is a light rail station on the MBTA Green Line C branch located in the median of Beacon Street just west of Englewood Avenue in Brookline, Massachusetts. The station consists of two low side platforms which serve the C branch's two tracks. Englewood Avenue is not accessible.
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [2] Design work for Englewood Avenue and seven other C Branch stations was 15% complete by December 2022. [3] As of November 2023 [update], construction is expected to take place from mid-2025 to spring 2026. [4] Designs shown in February 2024 called for the inbound platform to be shifted to the east side of the intersection. [5]
Media related to Englewood Avenue station at Wikimedia Commons
Englewood Avenue | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location |
Beacon Street at Englewood Avenue Brookline, Massachusetts | ||||||||||
Coordinates | 42°20′13″N 71°08′43″W / 42.337049°N 71.145357°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Passengers | |||||||||||
2011 | 555 (weekday average boardings) [1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Englewood Avenue station is a light rail station on the MBTA Green Line C branch located in the median of Beacon Street just west of Englewood Avenue in Brookline, Massachusetts. The station consists of two low side platforms which serve the C branch's two tracks. Englewood Avenue is not accessible.
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [2] Design work for Englewood Avenue and seven other C Branch stations was 15% complete by December 2022. [3] As of November 2023 [update], construction is expected to take place from mid-2025 to spring 2026. [4] Designs shown in February 2024 called for the inbound platform to be shifted to the east side of the intersection. [5]
Media related to Englewood Avenue station at Wikimedia Commons