BharuchâDahej line | |
---|---|
![]() | |
Overview | |
Status | Operational |
Owner | Indian Railways |
Locale | Gujarat |
Termini | |
Stations | 4 |
Service | |
Operator(s) | Western Railway |
Technical | |
Track length | 62 km (39 mi) |
Number of tracks | 1 |
Track gauge | 5 ft 6 in (1,676 mm) broad gauge |
Electrification | Yes |
The BharuchâDahej line belongs to Vadodara division of Western Railway zone in Gujarat State. [1]
BharuchâJambusar branch was opened in 1914. The length of BharuchâJambusar branch was 47 km. SamniâDahej branch was opened in 1930. The length of SamniâDahej branch was 39 km. Foundation stone for BharuchâDahej line Gauge conversion was laid in 2008. [2] [3] [4] The Narrow gauge to Broad gauge conversion of BharuchâDahej line was completed in 2011. Regular train operations was started in 2012. [5] [6] [7] [8] [9]
BharuchâDahej line | |
---|---|
![]() | |
Overview | |
Status | Operational |
Owner | Indian Railways |
Locale | Gujarat |
Termini | |
Stations | 4 |
Service | |
Operator(s) | Western Railway |
Technical | |
Track length | 62 km (39 mi) |
Number of tracks | 1 |
Track gauge | 5 ft 6 in (1,676 mm) broad gauge |
Electrification | Yes |
The BharuchâDahej line belongs to Vadodara division of Western Railway zone in Gujarat State. [1]
BharuchâJambusar branch was opened in 1914. The length of BharuchâJambusar branch was 47 km. SamniâDahej branch was opened in 1930. The length of SamniâDahej branch was 39 km. Foundation stone for BharuchâDahej line Gauge conversion was laid in 2008. [2] [3] [4] The Narrow gauge to Broad gauge conversion of BharuchâDahej line was completed in 2011. Regular train operations was started in 2012. [5] [6] [7] [8] [9]