This article relies largely or entirely on a
single source. (March 2016) |
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location |
Xishan District,
Wuxi,
Jiangsu China | ||||||||||
Operated by | Wuxi Metro Corporation | ||||||||||
Line(s) | Line 2 | ||||||||||
Platforms | 2 (1 side platform) | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
History | |||||||||||
Opened | 28 December 2014 | ||||||||||
Services | |||||||||||
|
Zhaqiao Station ( Chinese: 查桥站), is a metro station of Line 2, Wuxi Metro. It started operations on 28 December 2014. [1]
3F | Side Platform, doors will open on the right | |
West | ←█ towards Meiyuan Kaiyuan Temple | |
East | █towards Anzhen→ | |
Side Platform, doors will open on the right |
2F | Station Hall | Service Center, Ticket vending machine, Toilet, Elevator |
Ground | |
Exits |
There are 3 exits for this station.
31°34′58″N 120°25′36″E / 31.58278°N 120.42667°E
This article relies largely or entirely on a
single source. (March 2016) |
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location |
Xishan District,
Wuxi,
Jiangsu China | ||||||||||
Operated by | Wuxi Metro Corporation | ||||||||||
Line(s) | Line 2 | ||||||||||
Platforms | 2 (1 side platform) | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
History | |||||||||||
Opened | 28 December 2014 | ||||||||||
Services | |||||||||||
|
Zhaqiao Station ( Chinese: 查桥站), is a metro station of Line 2, Wuxi Metro. It started operations on 28 December 2014. [1]
3F | Side Platform, doors will open on the right | |
West | ←█ towards Meiyuan Kaiyuan Temple | |
East | █towards Anzhen→ | |
Side Platform, doors will open on the right |
2F | Station Hall | Service Center, Ticket vending machine, Toilet, Elevator |
Ground | |
Exits |
There are 3 exits for this station.
31°34′58″N 120°25′36″E / 31.58278°N 120.42667°E