Yunus Emre power station is a coal-fired power station in Turkey in Eskişehir Province. [1] [2] [3] [4] As of 2023 [update] it is partially operational. [5]
The power station was originally owned by Adularya Energy, one of the Naksan Holding companies. [6]: 68 An environmental impact assessment was done in 2009. [7] Adularya contracted with the builders in 2010 and construction started in 2011. [2]
The power station was financed by the Czech Export Bank, [6]: 59 which loaned 433 million euros interest free, [3] with export guarantee from the Export Guarantee and Insurance Corporation. [8] After the 2016 Turkish coup d'état attempt Naksan Holding was confiscated for allegedly helping to finance the attempt. [3] The Savings Deposit Insurance Fund made several attempts to reprivatize the power station and eventually sold it to Doruk (part of Yıldızlar SSS Holding). [9]: 17
All the lignite is mined locally then washed. [6]: 41 The 2 units of 145 MW each are fluidized bed with electrostatic precipitators to control dust emissions. The plant was built with desulphurisation technology (Andritz dry FGD (Turbo-CDS) which was up to EU standard in 2014 [6]: 64 ) but without controls on emissions of nitrogen oxides. No electricity was generated in 2019. [10]: 39 Two million tonnes of lignite can be burned each year and net generation efficiency was estimated at 35%. [3] The engineering, procurement, and construction contractor was Czech company Vitkovice Power Engineering. [6]: 59 Electrical and control equipment was supplied by ABB. [11] An ash pond was constructed. [12] Although Turkey's net zero target is the year 2053 [13] the power station is licensed to 2054. [14]
Licence number EÜ/11539-1/05338
Yunus Emre Power Station | |
---|---|
| |
Country |
|
Coordinates | 39°59′06″N 31°38′10″E / 39.985°N 31.6361°E |
Owner(s) |
|
Thermal power station | |
Primary fuel | |
Power generation | |
Nameplate capacity |
|
Annual net output |
|
Yunus Emre power station is a coal-fired power station in Turkey in Eskişehir Province. [1] [2] [3] [4] As of 2023 [update] it is partially operational. [5]
The power station was originally owned by Adularya Energy, one of the Naksan Holding companies. [6]: 68 An environmental impact assessment was done in 2009. [7] Adularya contracted with the builders in 2010 and construction started in 2011. [2]
The power station was financed by the Czech Export Bank, [6]: 59 which loaned 433 million euros interest free, [3] with export guarantee from the Export Guarantee and Insurance Corporation. [8] After the 2016 Turkish coup d'état attempt Naksan Holding was confiscated for allegedly helping to finance the attempt. [3] The Savings Deposit Insurance Fund made several attempts to reprivatize the power station and eventually sold it to Doruk (part of Yıldızlar SSS Holding). [9]: 17
All the lignite is mined locally then washed. [6]: 41 The 2 units of 145 MW each are fluidized bed with electrostatic precipitators to control dust emissions. The plant was built with desulphurisation technology (Andritz dry FGD (Turbo-CDS) which was up to EU standard in 2014 [6]: 64 ) but without controls on emissions of nitrogen oxides. No electricity was generated in 2019. [10]: 39 Two million tonnes of lignite can be burned each year and net generation efficiency was estimated at 35%. [3] The engineering, procurement, and construction contractor was Czech company Vitkovice Power Engineering. [6]: 59 Electrical and control equipment was supplied by ABB. [11] An ash pond was constructed. [12] Although Turkey's net zero target is the year 2053 [13] the power station is licensed to 2054. [14]