Vilnius Biofuel Power Plant | |
---|---|
| |
Official name | Vilniaus kogeneracinė jėgainė |
Country | Lithuania |
Location | Vilnius |
Coordinates | 54°40′4″N 25°9′24″E / 54.66778°N 25.15667°E |
Status | Operational |
Construction began | 2016 |
Commission date | 2021 |
Construction cost | 340 million € [1] |
Owner(s) | Ignitis grupė |
Thermal power station | |
Primary fuel | Waste |
Secondary fuel | Biofuel |
Power generation | |
Nameplate capacity | 88
MW (electricity) 227 MW (heat) |
Vilnius Biofuel Power Plant is a waste-to-energy plant in Vilnius, Lithuania. [2] [3] The plant produces 40% of all annual heating requirements for the city of Vilnius. [1]
It was built next to decommissioned Vilnius Combined Heat and Power Plant and utilises some of the infrastructure.
Vilnius Biofuel Power Plant | |
---|---|
| |
Official name | Vilniaus kogeneracinė jėgainė |
Country | Lithuania |
Location | Vilnius |
Coordinates | 54°40′4″N 25°9′24″E / 54.66778°N 25.15667°E |
Status | Operational |
Construction began | 2016 |
Commission date | 2021 |
Construction cost | 340 million € [1] |
Owner(s) | Ignitis grupė |
Thermal power station | |
Primary fuel | Waste |
Secondary fuel | Biofuel |
Power generation | |
Nameplate capacity | 88
MW (electricity) 227 MW (heat) |
Vilnius Biofuel Power Plant is a waste-to-energy plant in Vilnius, Lithuania. [2] [3] The plant produces 40% of all annual heating requirements for the city of Vilnius. [1]
It was built next to decommissioned Vilnius Combined Heat and Power Plant and utilises some of the infrastructure.