Vader Piet Wind Farm | |
---|---|
![]() | |
| |
Country |
|
Location | Aruba |
Coordinates | 12°28′27″N 69°53′28″W / 12.47411°N 69.89111°W |
Status | Operational |
Commission date |
|
Construction cost | US$75 million |
Wind farm | |
Hub height | 80 m |
Rotor diameter |
|
Rated wind speed |
|
Power generation | |
Units operational | 10 × 3 MW |
Make and model | Vestas V90/3000 (10) |
Nameplate capacity |
|
External links | |
Website |
www |
Commons | Related media on Commons |
The Vader Piet Wind Farm is a wind farm in Aruba. It is the first wind farm in the territory.
The establishment of the wind farm was proposed in February 2008. [1] The wind farm was then commissioned in December 2009, making it the first wind farm in Aruba. [2] [3]
The wind farm has an installed capacity of 30 MW, which consists of ten units of 3.0 MW turbines. [4] Each wind turbine tower stands at a height of 80 m. [2] [5]
The wind farm was constructed at a cost of US$75 million. [6]
Vader Piet Wind Farm | |
---|---|
![]() | |
| |
Country |
|
Location | Aruba |
Coordinates | 12°28′27″N 69°53′28″W / 12.47411°N 69.89111°W |
Status | Operational |
Commission date |
|
Construction cost | US$75 million |
Wind farm | |
Hub height | 80 m |
Rotor diameter |
|
Rated wind speed |
|
Power generation | |
Units operational | 10 × 3 MW |
Make and model | Vestas V90/3000 (10) |
Nameplate capacity |
|
External links | |
Website |
www |
Commons | Related media on Commons |
The Vader Piet Wind Farm is a wind farm in Aruba. It is the first wind farm in the territory.
The establishment of the wind farm was proposed in February 2008. [1] The wind farm was then commissioned in December 2009, making it the first wind farm in Aruba. [2] [3]
The wind farm has an installed capacity of 30 MW, which consists of ten units of 3.0 MW turbines. [4] Each wind turbine tower stands at a height of 80 m. [2] [5]
The wind farm was constructed at a cost of US$75 million. [6]