Toruń tramway network | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operation | |||||||||||||||||||||
Locale | Toruń, Poland | ||||||||||||||||||||
| |||||||||||||||||||||
|
The Toruń tram system is a tramway in Toruń, Poland that has been in operation since 1891. The system is operated by Miejski Zakład Komunikacji w Toruniu (MZK Toruń). There are 7 tramlines with a total line length of 54.3 kilometres (33.7 mi). The system operates on 28 kilometres (17 mi) of route on 1,000 mm (3 ft 3+3⁄8 in) metre gauge ( narrow gauge) track. A total of 45 trams of the 805Na type are in operation.
A 1.7-kilometre (1.1 mi) extension was built to serve Nicolaus Copernicus University in Toruń. It was originally projected to open in 2013, [1] but the extension ultimately opened for service on 24 June 2014. [2]
The most recent extension, built to serve the Osiedle Jar housing estate in the north of the town, was inaugurated on 25 August 2023 and started normal passenger operations on 1 September 2023. [3]
Type | Production | Number | |
---|---|---|---|
805Na | 1980 | 27 | |
805NaND
(modernised 805Na) |
2007 | 18 [4] | |
122NbT Swing | 2014 | 6 [5] | |
121NbT Swing | 2015 | 6 [6] | |
122NbTDuo Swing | 2015 | 5 [7] | |
122NaT Swing | 2021-2022 | 5 [8] | |
Total | 67 |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 (Seasonal) |
|
|
|
|
|
|
|
|
Toruń tramway network | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Operation | |||||||||||||||||||||
Locale | Toruń, Poland | ||||||||||||||||||||
| |||||||||||||||||||||
|
The Toruń tram system is a tramway in Toruń, Poland that has been in operation since 1891. The system is operated by Miejski Zakład Komunikacji w Toruniu (MZK Toruń). There are 7 tramlines with a total line length of 54.3 kilometres (33.7 mi). The system operates on 28 kilometres (17 mi) of route on 1,000 mm (3 ft 3+3⁄8 in) metre gauge ( narrow gauge) track. A total of 45 trams of the 805Na type are in operation.
A 1.7-kilometre (1.1 mi) extension was built to serve Nicolaus Copernicus University in Toruń. It was originally projected to open in 2013, [1] but the extension ultimately opened for service on 24 June 2014. [2]
The most recent extension, built to serve the Osiedle Jar housing estate in the north of the town, was inaugurated on 25 August 2023 and started normal passenger operations on 1 September 2023. [3]
Type | Production | Number | |
---|---|---|---|
805Na | 1980 | 27 | |
805NaND
(modernised 805Na) |
2007 | 18 [4] | |
122NbT Swing | 2014 | 6 [5] | |
121NbT Swing | 2015 | 6 [6] | |
122NbTDuo Swing | 2015 | 5 [7] | |
122NaT Swing | 2021-2022 | 5 [8] | |
Total | 67 |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 (Seasonal) |
|
|
|
|
|
|
|
|