From Wikipedia, the free encyclopedia
Tianshui–Pingliang railway
Overview
Native name天平é“è·¯
Locale Gansu, China
Connecting lines Longhai Railway

Baozhong Railway

Tianlong Railway
Stations9
History
Commenced2008
Opened2015
Technical
Line length123 km (76 mi)
Number of tracks1
Minimum radius800 m (2,600 ft)
Electrificationoverhead line
Operating speed120 km/h (75 mph)

The Tianshui–Pingliang railway is a railway line in Gansu, connecting Tianshui and Pingliang. The line is jointly funded by the Ministry of Railways, Gansu Province, and China Huaneng Group Gansu Energy Development Co., Ltd. The line is primarily used for coal transportation, while also carrying local passenger trains and cargo other than coal.

The line has a maximum slope of 13‰ for the direction of loaded trains and 18‰ for the direction of unloaded trains. The minimum curve radius is 1200 meters, 800 meters in the mountainous section. The total length of bridges and tunnels is 78 kilometers, accounting for 68.14% of the line length. Among them, the Guanshan Tunnel passing through the Guanshan section of the Liupan Mountain is 15,600 meters long, and the Liupanshan Tunnel is 16,390 meters long, which is the longest single-track and non-main line railway tunnel in China. There are a total of nine stations along the line. [1]

The design speed is 120km/h, it is expected that the freight volume transported will be 16 million tons in the near future and 18.2 million tons in the long term.

History

The railway line was a key project of the Eleventh five-year plan in Gansu province. [1]

The project investment amount was 5.4 billion yuan, and the construction period was estimated to be 42 months. Surveying and design was performed by the China Railway First Survey and Design Institute. The construction was officially started on 4 December 2008 and the line was completed and opened to traffic on 30 December 2015. [2]

References

  1. ^ a b "天平é“è·¯7月1日正å¼è¿è¡Œ 终结甘肃张家å·ã€æ¸…水两县ä¸é€šç«è½¦çš„历å²-æ–°åŽç½‘". www.xinhuanet.com. Retrieved 2021-09-23.[ dead link]
  2. ^ 张磊 æŽåƒ (2015-12-30). "天平é“路今天正å¼å¼€é€šè¿è¥ 结æŸå¤©æ°´è‡³å¹³å‡‰ä¸é€šé“路的历å²". 央广网. Archived from the original on 2016-03-06. Retrieved 2015-12-30.
From Wikipedia, the free encyclopedia
Tianshui–Pingliang railway
Overview
Native name天平é“è·¯
Locale Gansu, China
Connecting lines Longhai Railway

Baozhong Railway

Tianlong Railway
Stations9
History
Commenced2008
Opened2015
Technical
Line length123 km (76 mi)
Number of tracks1
Minimum radius800 m (2,600 ft)
Electrificationoverhead line
Operating speed120 km/h (75 mph)

The Tianshui–Pingliang railway is a railway line in Gansu, connecting Tianshui and Pingliang. The line is jointly funded by the Ministry of Railways, Gansu Province, and China Huaneng Group Gansu Energy Development Co., Ltd. The line is primarily used for coal transportation, while also carrying local passenger trains and cargo other than coal.

The line has a maximum slope of 13‰ for the direction of loaded trains and 18‰ for the direction of unloaded trains. The minimum curve radius is 1200 meters, 800 meters in the mountainous section. The total length of bridges and tunnels is 78 kilometers, accounting for 68.14% of the line length. Among them, the Guanshan Tunnel passing through the Guanshan section of the Liupan Mountain is 15,600 meters long, and the Liupanshan Tunnel is 16,390 meters long, which is the longest single-track and non-main line railway tunnel in China. There are a total of nine stations along the line. [1]

The design speed is 120km/h, it is expected that the freight volume transported will be 16 million tons in the near future and 18.2 million tons in the long term.

History

The railway line was a key project of the Eleventh five-year plan in Gansu province. [1]

The project investment amount was 5.4 billion yuan, and the construction period was estimated to be 42 months. Surveying and design was performed by the China Railway First Survey and Design Institute. The construction was officially started on 4 December 2008 and the line was completed and opened to traffic on 30 December 2015. [2]

References

  1. ^ a b "天平é“è·¯7月1日正å¼è¿è¡Œ 终结甘肃张家å·ã€æ¸…水两县ä¸é€šç«è½¦çš„历å²-æ–°åŽç½‘". www.xinhuanet.com. Retrieved 2021-09-23.[ dead link]
  2. ^ 张磊 æŽåƒ (2015-12-30). "天平é“路今天正å¼å¼€é€šè¿è¥ 结æŸå¤©æ°´è‡³å¹³å‡‰ä¸é€šé“路的历å²". 央广网. Archived from the original on 2016-03-06. Retrieved 2015-12-30.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook