From Wikipedia, the free encyclopedia

Grammar

I'm not a native speaker, therefore I didn't want to change the text by myself, but is the following sentence correct?

Logical connector In the event-driven process chain the logical relationships between elements in the control flow, that is, events and functions are described by logical connectors. -- TheFamilyBusiness ( talk) 10:49, 17 February 2016 (UTC) reply

Picture is not correct

Splits with xor, or, and musst always be merged again with xor, or, and — Preceding unsigned comment added by 91.213.169.5 ( talk) 12:23, 16 October 2012 (UTC) reply

No merge with ARIS

No merge with ARIS! EPC is referenced in ARIS. EPC is the main diagram of the ARIS method, but ARIS also includes other diagrams like organigrams etc. —Preceding unsigned comment added by 217.85.97.87 ( talkcontribs) 08:43, 3 February 2007

Copyright?

Some of this material was apparently copied unchanged from some other source. The evidence is that there were reference markers in the text, but the references were not provided.-- Cherlin 23:27, 5 April 2007 (UTC) reply

Background, references

I added some background at the beginning, and put in some references. Can we remove these tags?-- Cherlin 23:25, 5 April 2007 (UTC) reply

Bad example picture?

Some of the items in this picture don't seem to match up with the descriptions on the main "Elements of an event-driven process chain" section. For example, what is a "support system" and why is organizational unit item in the picture not "an ellipse with a vertical line"?

From Wikipedia, the free encyclopedia

Grammar

I'm not a native speaker, therefore I didn't want to change the text by myself, but is the following sentence correct?

Logical connector In the event-driven process chain the logical relationships between elements in the control flow, that is, events and functions are described by logical connectors. -- TheFamilyBusiness ( talk) 10:49, 17 February 2016 (UTC) reply

Picture is not correct

Splits with xor, or, and musst always be merged again with xor, or, and — Preceding unsigned comment added by 91.213.169.5 ( talk) 12:23, 16 October 2012 (UTC) reply

No merge with ARIS

No merge with ARIS! EPC is referenced in ARIS. EPC is the main diagram of the ARIS method, but ARIS also includes other diagrams like organigrams etc. —Preceding unsigned comment added by 217.85.97.87 ( talkcontribs) 08:43, 3 February 2007

Copyright?

Some of this material was apparently copied unchanged from some other source. The evidence is that there were reference markers in the text, but the references were not provided.-- Cherlin 23:27, 5 April 2007 (UTC) reply

Background, references

I added some background at the beginning, and put in some references. Can we remove these tags?-- Cherlin 23:25, 5 April 2007 (UTC) reply

Bad example picture?

Some of the items in this picture don't seem to match up with the descriptions on the main "Elements of an event-driven process chain" section. For example, what is a "support system" and why is organizational unit item in the picture not "an ellipse with a vertical line"?


Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook