Route information | |
---|---|
Length | 12 km (7.5 mi) |
Major junctions | |
North end | Luv Kush Square |
South end | Gandhi Nagar Square |
Location | |
Country | India |
State | Madhya Pradesh |
Highway system | |
State Highways in Madhya Pradesh |
Kushabhau Thakre Marg commonly known as Super Corridor (MR10) is a road that connects AH47 Agra - Mumbai National Highway with MP SH 27 and Indore Airport. Kushabhau Thakre Marg is one of the busiest roads of the city of Indore and has become a new hub in the city. [1] [2] [3] [4]
The work for the Phase-1 of the Indore Metro is currently in full swing slated to be operational by late 2023. A depot is also being developed near Gandhi Nagar Square. [5] [6] [7]
Route information | |
---|---|
Length | 12 km (7.5 mi) |
Major junctions | |
North end | Luv Kush Square |
South end | Gandhi Nagar Square |
Location | |
Country | India |
State | Madhya Pradesh |
Highway system | |
State Highways in Madhya Pradesh |
Kushabhau Thakre Marg commonly known as Super Corridor (MR10) is a road that connects AH47 Agra - Mumbai National Highway with MP SH 27 and Indore Airport. Kushabhau Thakre Marg is one of the busiest roads of the city of Indore and has become a new hub in the city. [1] [2] [3] [4]
The work for the Phase-1 of the Indore Metro is currently in full swing slated to be operational by late 2023. A depot is also being developed near Gandhi Nagar Square. [5] [6] [7]