Srinagarind Dam
Power station
Srinagarind Dam is located in Thailand
Srinagarind Dam
Location of Srinagarind Dam in Thailand
Country Thailand
Location Si Sawat, Kanchanaburi
Coordinates 14°24′31″N 99°07′42″E / 14.40861°N 99.12833°E / 14.40861; 99.12833
StatusIn use
Construction began1974
Opening date1980
Owner(s) Electricity Generating Authority of Thailand
Dam and spillways
Type of damEmbankment
Impounds Khwae Yai
Height140 m (460 ft)
Length610 m (2,000 ft)
Reservoir
CreatesSrinagarind Reservoir
Total capacity17,745,000,000 m3 (14,386,106  acre⋅ft)
Power Station
Commission date1980–1991
Turbines3 × 120 MW (160,000 hp) Francis-type, 2 × 180 MW (240,000 hp) Francis pump-turbine.
Installed capacity720 MW (970,000 hp)
Annual generation1,160 gigawatt-hours (4,200 TJ)

The Srinagarind Dam (also known as the Srinakarin Dam; Thai: เขื่อนศรีนครินทร์, RTGSKhuean Si Nakharin, pronounced [kʰɯ̀a̯n sǐː ná(ʔ).kʰā.rīn]) is an embankment dam on the Khwae Yai River in Si Sawat District of Kanchanaburi Province, Thailand. The purposes of the dam are river regulation and hydroelectric power generation. The dam's power station has a 720 megawatts (970,000 hp) capacity of which 360 megawatts (480,000 hp) is pumped storage. The dam was named after Princess Srinagarindra.

Background

Feasibility studies for the dam were carried out between May 1967 and May 1969 and designs from September 1970 to December 1977. Construction began in 1974 and it was completed in 1980. [1] The first of the dam's generators was commissioned in 1980 and the last in 1991. [2] The original cost of the dam was estimated to be US$45 million but because the dam was constructed on a fault line, the dam's foundation had to be reinforced which raised the cost to US$114 million. [3]

Design

The Srinagarind Dam is a 140 metres (460 ft) tall and 610 metres (2,000 ft) long embankment dam. It contains a reservoir with a capacity of 17,745 million cubic metres (14.386×10^6 acre⋅ft). [4] The dam's power station has an installed capacity of 720 MW and contains three 120 megawatts (160,000 hp) Francis turbines and two 180 MW Francis pump-turbines. The pump-turbines serve the dam's pumped-storage capability and generate electricity during peak hours. In off-peak hours, the pump turbines return water from the lower reservoir back into the upper reservoir. [2]

See also

References

  1. ^ "SRINAGARIND (BAN CHAO NEN) Thailand" (PDF). JPower. Retrieved 6 March 2011.
  2. ^ a b "Hydroelectric Power Plants in Thailand". Industcards. Retrieved 6 March 2011.
  3. ^ "The Salween Under Threat" (PDF). Living River Siam. p. 29. Retrieved 6 March 2011.
  4. ^ "Srinagarind Dam". Electricity Generating Authority of Thailand (EGAT). Retrieved 14 November 2016.

srinagarind+dam Latitude and Longitude:

14°24′31″N 99°07′42″E / 14.40861°N 99.12833°E / 14.40861; 99.12833
From Wikipedia, the free encyclopedia
Srinagarind Dam
Power station
Srinagarind Dam is located in Thailand
Srinagarind Dam
Location of Srinagarind Dam in Thailand
Country Thailand
Location Si Sawat, Kanchanaburi
Coordinates 14°24′31″N 99°07′42″E / 14.40861°N 99.12833°E / 14.40861; 99.12833
StatusIn use
Construction began1974
Opening date1980
Owner(s) Electricity Generating Authority of Thailand
Dam and spillways
Type of damEmbankment
Impounds Khwae Yai
Height140 m (460 ft)
Length610 m (2,000 ft)
Reservoir
CreatesSrinagarind Reservoir
Total capacity17,745,000,000 m3 (14,386,106  acre⋅ft)
Power Station
Commission date1980–1991
Turbines3 × 120 MW (160,000 hp) Francis-type, 2 × 180 MW (240,000 hp) Francis pump-turbine.
Installed capacity720 MW (970,000 hp)
Annual generation1,160 gigawatt-hours (4,200 TJ)

The Srinagarind Dam (also known as the Srinakarin Dam; Thai: เขื่อนศรีนครินทร์, RTGSKhuean Si Nakharin, pronounced [kʰɯ̀a̯n sǐː ná(ʔ).kʰā.rīn]) is an embankment dam on the Khwae Yai River in Si Sawat District of Kanchanaburi Province, Thailand. The purposes of the dam are river regulation and hydroelectric power generation. The dam's power station has a 720 megawatts (970,000 hp) capacity of which 360 megawatts (480,000 hp) is pumped storage. The dam was named after Princess Srinagarindra.

Background

Feasibility studies for the dam were carried out between May 1967 and May 1969 and designs from September 1970 to December 1977. Construction began in 1974 and it was completed in 1980. [1] The first of the dam's generators was commissioned in 1980 and the last in 1991. [2] The original cost of the dam was estimated to be US$45 million but because the dam was constructed on a fault line, the dam's foundation had to be reinforced which raised the cost to US$114 million. [3]

Design

The Srinagarind Dam is a 140 metres (460 ft) tall and 610 metres (2,000 ft) long embankment dam. It contains a reservoir with a capacity of 17,745 million cubic metres (14.386×10^6 acre⋅ft). [4] The dam's power station has an installed capacity of 720 MW and contains three 120 megawatts (160,000 hp) Francis turbines and two 180 MW Francis pump-turbines. The pump-turbines serve the dam's pumped-storage capability and generate electricity during peak hours. In off-peak hours, the pump turbines return water from the lower reservoir back into the upper reservoir. [2]

See also

References

  1. ^ "SRINAGARIND (BAN CHAO NEN) Thailand" (PDF). JPower. Retrieved 6 March 2011.
  2. ^ a b "Hydroelectric Power Plants in Thailand". Industcards. Retrieved 6 March 2011.
  3. ^ "The Salween Under Threat" (PDF). Living River Siam. p. 29. Retrieved 6 March 2011.
  4. ^ "Srinagarind Dam". Electricity Generating Authority of Thailand (EGAT). Retrieved 14 November 2016.