13:3013:30, 11 August 2021diffhist−161
EMD GP9
Undid revision 1038258954 by
Trainsandotherthings (
talk)You've already accepted the Extra 2200 South issue #32 as gospel. Why confuse things with wrong information"? Why leave out the 15 units export to South America?Tag: Undo
11:0511:05, 11 August 2021diffhist−161
EMD GP9
There are two builders with the same start and different end dates, 4272 is the correct total as of December 1971 cited in Extra 2200 SouthTag: Reverted
09:2509:25, 4 August 2021diffhist−660
EMD GP9
EMD did not built 4257 GP9s as 646 of those units were built by GMD. GP9 production in Canada was followed by the GP30.
09:2309:23, 4 August 2021diffhist−188
EMD GP9
Neither of those statements are correct. Some 646 GP9s were built in Canada. Canadian production lasted until August 1963.
13:4913:49, 5 July 2021diffhist+66
EMD SW9
Undid revision 1032063839 by
JustAnotherNZWikipedian (
talk)Weyerhaeuser 305 is the only SW9 built with a 12-567C engine. The December 1953 date is at the end of SW9 production. SW1200 production started in January 1954. Data from EMD.Tag: Undo
08:5008:50, 23 June 2021diffhist+98
GE C30-7
BN #5500 was shown at the Chicago Railroad Equipment Show in September 1976. BN #5501-5509 were built in December 1976. Diesel Era V3 N3.
13:3013:30, 11 August 2021diffhist−161
EMD GP9
Undid revision 1038258954 by
Trainsandotherthings (
talk)You've already accepted the Extra 2200 South issue #32 as gospel. Why confuse things with wrong information"? Why leave out the 15 units export to South America?Tag: Undo
11:0511:05, 11 August 2021diffhist−161
EMD GP9
There are two builders with the same start and different end dates, 4272 is the correct total as of December 1971 cited in Extra 2200 SouthTag: Reverted
09:2509:25, 4 August 2021diffhist−660
EMD GP9
EMD did not built 4257 GP9s as 646 of those units were built by GMD. GP9 production in Canada was followed by the GP30.
09:2309:23, 4 August 2021diffhist−188
EMD GP9
Neither of those statements are correct. Some 646 GP9s were built in Canada. Canadian production lasted until August 1963.
13:4913:49, 5 July 2021diffhist+66
EMD SW9
Undid revision 1032063839 by
JustAnotherNZWikipedian (
talk)Weyerhaeuser 305 is the only SW9 built with a 12-567C engine. The December 1953 date is at the end of SW9 production. SW1200 production started in January 1954. Data from EMD.Tag: Undo
08:5008:50, 23 June 2021diffhist+98
GE C30-7
BN #5500 was shown at the Chicago Railroad Equipment Show in September 1976. BN #5501-5509 were built in December 1976. Diesel Era V3 N3.