From Wikipedia, the free encyclopedia
Expressway No.29 shield}}
Expressway No.29
Sejong–Pocheon Expressway
세종í¬ì²œê³ ì†ë„ë¡œ
Route information
Length121.7 km [1] (75.6 mi)
Existed30 June 2017–present
Major junctions
South end Anseong, Gyeonggi Province
North end Pocheon, Gyeonggi Province
Location
Country South Korea
Highway system
Sejong–Pocheon Expressway
Hangul
세종í¬ì²œê³ ì†ë„ë¡œ
Hanja
Revised RomanizationSejong Pocheon Gosok Doro
McCune–ReischauerSejong P'och'Ån Kosok Toro

The Sejong–Pocheon Expressway ( Korean: 세종í¬ì²œê³ ì†ë„ë¡œ; Sejong Pocheon Gosok Doro), is an expressway in South Korea, connecting Anseong to Guri, Seoul, Namyangju, Uijeongbu and Pocheon.

Construction on the Guri–Pocheon section was started on June 30, 2012, and finished on June 30, 2017. [2] It is a private investment project so the toll rates are cheaper than other expressways in South Korea. The highway operated is by the Seoul Northern Highway Corporation.
The Sejong–Guri section has been called Sejong–Seoul Expressway or 2nd Gyeongbu Expressway, and it is planned to reduce traffic congestion between Gyeongbu Expressway and Jungbu Expressway. The first section of Seongnam–Guri is Anseong–Guri section, was finished on April 25, 2017. The remaining sections between Anseong and Seongnam will be completed in 2022. The second section, Sejong–Anseong, will be started in 2020 and completed in 2025.

Currently the National Route 43, National Route 47 and Dongbu Expressway, which connects Pocheon and Seoul have many vehicles and traffic lights. This expressway has reduced the travel time between two cities from 1 hour 30 minutes to 40 minutes.

Main stopovers

Jungnang Interchange.
Gyeonggi Province
Seoul
Gyeonggi Province
Seoul
Gyeonggi Province

Compositions

Lanes

  • S.Guri IC - Soheul JCT: 6 (30.46 km)
  • Soheul JCT - Sinbuk IC: 4 (14.14 km)
  • Soheul JCT - Yangju IC: 4 (5.94 km)

Tunnel

Tunnel name Hangul Location Length Opened Notes
Guri Tunnel êµ¬ë¦¬í„°ë„ Gyeonggi Guri Topyeong-dong 3,483.5m 2017 Pocheon-bound
3,605m Guri-bound
Jungnang IC Underpass 중랑IC 1ì§€í•˜ì°¨ë„ Seoul Jungnang District Sinnae-dong 140m 2017
Jungnang IC 2 Underpass 중랑IC 2ì§€í•˜ì°¨ë„ Seoul Jungnang District Sinnae-dong 3.3m 2017
Galmae Underpass ê°ˆë§¤ì§€í•˜ì°¨ë„ Seoul Jungnang District Sinnae-dong 100m 2017
Namyangju Tunnel ë‚¨ì–‘ì£¼í„°ë„ Gyeonggi Namyangju Byeollae-myeon 1,235m 2017 Pocheon-bound
1,255m Guri-bound
Jageum Underpass ìžê¸ˆì§€í•˜ì°¨ë„ Gyeonggi Uijeongbu Geumo-dong 180m 2017
Chukseokryeong Tunnel 축ì„ë ¹í„°ë„ Gyeonggi Uijeongbu Geumo-dong 495m 2017
Igapal Underpass ì´ê°€íŒ”ì§€í•˜ì°¨ë„ Gyeonggi Pocheon Soheul-eup 360m 2017

List of facilities

  • IC: Interchange, JCT: Junction, SA: Service Area, TG:Tollgate

Guri ~ Pocheon

No. Name Hangul Connection Location Notes
1 S.Guri 남구리 Gangbyeonbuk-ro Gyeonggi Province Guri
2 Jungnang 중랑 Bukbu Expressway Seoul Jungnang District Tollgate
TG Galmae-Donggureung TG 갈매ë™êµ¬ë¦‰ 요금소 Gyeonggi Province Guri Main-line Tollgate
3 S.Byeollae 남별내 Songsan-ro Namyangju
SA Byeollae SA 별내휴게소 Pocheon-bound
4 E.Uijeongbu ë™ì˜ì •ë¶€ National Route 43 (Songsan-ro) Uijeongbu
SA Uijeongbu SA ì˜ì •ë¶€íœ´ê²Œì†Œ Sejong-bound
5 Millak ë¯¼ë½ Millak-ro 298beon-gil
National Route 3 (Sinpyeonghwa-ro), Millak-ro
6 Soheul ì†Œí˜ National Route 43 (Hoguk-ro)
Prefectural Route 98 (Hoguk-ro)
Pocheon
7 Soheul JCT ì†Œí˜ ë¶„ê¸°ì  Soheul ~ Yangju section
8 Seondan 선단 National Route 43 (Hoguk-ro)
Prefectural Route 56 (Hoguk-ro)
Prefectural Route 364 (Samyuksa-ro)
9 Pocheon í¬ì²œ National Route 87 (Pocheon-ro)
TG Sinbuk TG ì‹ ë¶ ìš”ê¸ˆì†Œ Main-line Tollgate
10 Sinbuk ì‹ ë¶ National Route 43 (Hoguk-ro)

Soheul ~ Yangju section

This section is officially opened as the branch line of Sejong–Pocheon Expressway. However, it is guided to the Capital Region 2nd Ring Expressway.

No. Name Hangul Connection Location Notes
1 Soheul JCT ì†Œí˜ ë¶„ê¸°ì  Sejong–Pocheon Expressway (Main) Gyeonggi Province Pocheon
2 Okjeong 옥정 Prefectural Route 56 (Hwahap-ro) Yangju Yangju-bound Only
3 Yangju 양주 Prefectural Route 56 (Hwahap-ro)
National Route 3 (Sinpyeonghwa-ro)

See also

References

  1. ^ Guri–Pocheon 50.60 km, Anseong–Guri 71.10 km
  2. ^ '경기 중ë¶ë¶€ 대ë™ë§¥' 구리~í¬ì²œ 민ìžê³ ì†é“ 6ì›” 개통, 연합뉴스, 2017ë…„ 2ì›” 22ì¼ ìž‘ì„±.

External links

From Wikipedia, the free encyclopedia
Expressway No.29 shield}}
Expressway No.29
Sejong–Pocheon Expressway
세종í¬ì²œê³ ì†ë„ë¡œ
Route information
Length121.7 km [1] (75.6 mi)
Existed30 June 2017–present
Major junctions
South end Anseong, Gyeonggi Province
North end Pocheon, Gyeonggi Province
Location
Country South Korea
Highway system
Sejong–Pocheon Expressway
Hangul
세종í¬ì²œê³ ì†ë„ë¡œ
Hanja
Revised RomanizationSejong Pocheon Gosok Doro
McCune–ReischauerSejong P'och'Ån Kosok Toro

The Sejong–Pocheon Expressway ( Korean: 세종í¬ì²œê³ ì†ë„ë¡œ; Sejong Pocheon Gosok Doro), is an expressway in South Korea, connecting Anseong to Guri, Seoul, Namyangju, Uijeongbu and Pocheon.

Construction on the Guri–Pocheon section was started on June 30, 2012, and finished on June 30, 2017. [2] It is a private investment project so the toll rates are cheaper than other expressways in South Korea. The highway operated is by the Seoul Northern Highway Corporation.
The Sejong–Guri section has been called Sejong–Seoul Expressway or 2nd Gyeongbu Expressway, and it is planned to reduce traffic congestion between Gyeongbu Expressway and Jungbu Expressway. The first section of Seongnam–Guri is Anseong–Guri section, was finished on April 25, 2017. The remaining sections between Anseong and Seongnam will be completed in 2022. The second section, Sejong–Anseong, will be started in 2020 and completed in 2025.

Currently the National Route 43, National Route 47 and Dongbu Expressway, which connects Pocheon and Seoul have many vehicles and traffic lights. This expressway has reduced the travel time between two cities from 1 hour 30 minutes to 40 minutes.

Main stopovers

Jungnang Interchange.
Gyeonggi Province
Seoul
Gyeonggi Province
Seoul
Gyeonggi Province

Compositions

Lanes

  • S.Guri IC - Soheul JCT: 6 (30.46 km)
  • Soheul JCT - Sinbuk IC: 4 (14.14 km)
  • Soheul JCT - Yangju IC: 4 (5.94 km)

Tunnel

Tunnel name Hangul Location Length Opened Notes
Guri Tunnel êµ¬ë¦¬í„°ë„ Gyeonggi Guri Topyeong-dong 3,483.5m 2017 Pocheon-bound
3,605m Guri-bound
Jungnang IC Underpass 중랑IC 1ì§€í•˜ì°¨ë„ Seoul Jungnang District Sinnae-dong 140m 2017
Jungnang IC 2 Underpass 중랑IC 2ì§€í•˜ì°¨ë„ Seoul Jungnang District Sinnae-dong 3.3m 2017
Galmae Underpass ê°ˆë§¤ì§€í•˜ì°¨ë„ Seoul Jungnang District Sinnae-dong 100m 2017
Namyangju Tunnel ë‚¨ì–‘ì£¼í„°ë„ Gyeonggi Namyangju Byeollae-myeon 1,235m 2017 Pocheon-bound
1,255m Guri-bound
Jageum Underpass ìžê¸ˆì§€í•˜ì°¨ë„ Gyeonggi Uijeongbu Geumo-dong 180m 2017
Chukseokryeong Tunnel 축ì„ë ¹í„°ë„ Gyeonggi Uijeongbu Geumo-dong 495m 2017
Igapal Underpass ì´ê°€íŒ”ì§€í•˜ì°¨ë„ Gyeonggi Pocheon Soheul-eup 360m 2017

List of facilities

  • IC: Interchange, JCT: Junction, SA: Service Area, TG:Tollgate

Guri ~ Pocheon

No. Name Hangul Connection Location Notes
1 S.Guri 남구리 Gangbyeonbuk-ro Gyeonggi Province Guri
2 Jungnang 중랑 Bukbu Expressway Seoul Jungnang District Tollgate
TG Galmae-Donggureung TG 갈매ë™êµ¬ë¦‰ 요금소 Gyeonggi Province Guri Main-line Tollgate
3 S.Byeollae 남별내 Songsan-ro Namyangju
SA Byeollae SA 별내휴게소 Pocheon-bound
4 E.Uijeongbu ë™ì˜ì •ë¶€ National Route 43 (Songsan-ro) Uijeongbu
SA Uijeongbu SA ì˜ì •ë¶€íœ´ê²Œì†Œ Sejong-bound
5 Millak ë¯¼ë½ Millak-ro 298beon-gil
National Route 3 (Sinpyeonghwa-ro), Millak-ro
6 Soheul ì†Œí˜ National Route 43 (Hoguk-ro)
Prefectural Route 98 (Hoguk-ro)
Pocheon
7 Soheul JCT ì†Œí˜ ë¶„ê¸°ì  Soheul ~ Yangju section
8 Seondan 선단 National Route 43 (Hoguk-ro)
Prefectural Route 56 (Hoguk-ro)
Prefectural Route 364 (Samyuksa-ro)
9 Pocheon í¬ì²œ National Route 87 (Pocheon-ro)
TG Sinbuk TG ì‹ ë¶ ìš”ê¸ˆì†Œ Main-line Tollgate
10 Sinbuk ì‹ ë¶ National Route 43 (Hoguk-ro)

Soheul ~ Yangju section

This section is officially opened as the branch line of Sejong–Pocheon Expressway. However, it is guided to the Capital Region 2nd Ring Expressway.

No. Name Hangul Connection Location Notes
1 Soheul JCT ì†Œí˜ ë¶„ê¸°ì  Sejong–Pocheon Expressway (Main) Gyeonggi Province Pocheon
2 Okjeong 옥정 Prefectural Route 56 (Hwahap-ro) Yangju Yangju-bound Only
3 Yangju 양주 Prefectural Route 56 (Hwahap-ro)
National Route 3 (Sinpyeonghwa-ro)

See also

References

  1. ^ Guri–Pocheon 50.60 km, Anseong–Guri 71.10 km
  2. ^ '경기 중ë¶ë¶€ 대ë™ë§¥' 구리~í¬ì²œ 민ìžê³ ì†é“ 6ì›” 개통, 연합뉴스, 2017ë…„ 2ì›” 22ì¼ ìž‘ì„±.

External links


Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook