PhotosLocation


sebiș+solar+park Latitude and Longitude:

46°22′22″N 22°7′46″E / 46.37278°N 22.12944°E / 46.37278; 22.12944
From Wikipedia, the free encyclopedia
Sebiș Solar Park
Country Romania
Location Sebiș, Arad County
Coordinates 46°22′22″N 22°7′46″E / 46.37278°N 22.12944°E / 46.37278; 22.12944
StatusCompleted
Commission date2013
Construction cost€100 million
Owner(s)Promocion Inversolar 65
Solar farm
Type Flat-panel PV
Power generation
Units operational317,000
Nameplate capacity65 MW
Annual net output91 GWh

Sebiș Solar Park is a large thin-film photovoltaic (PV) power system, built on a 200 ha (490 acres) plot of land located in Sebiș, Arad County, in western Romania.

The solar park has around 317,000 state-of-the-art thin film PV panels for a total nameplate capacity of 65-megawatts, and was completed in December 2013. [1] The solar park was expected to supply around 91 GWh of electricity per year, enough to power some 100,000 average homes. [1] [2]

The investment cost for the Sebiș solar park amounted to some 100 million. [1]

See also

References

  1. ^ a b c "Investitie de 100 mil. euro intr-un parc fotovoltaic la Arad". www.wall-street.ro (in Romanian). 2013-02-06. Retrieved 2014-01-03.
  2. ^ "Arad, județul care va avea cel mai mare parc fotovoltaic din țară" (in Romanian). Digi24. 2013-03-27. Retrieved 2014-01-03.

sebiș+solar+park Latitude and Longitude:

46°22′22″N 22°7′46″E / 46.37278°N 22.12944°E / 46.37278; 22.12944
From Wikipedia, the free encyclopedia
Sebiș Solar Park
Country Romania
Location Sebiș, Arad County
Coordinates 46°22′22″N 22°7′46″E / 46.37278°N 22.12944°E / 46.37278; 22.12944
StatusCompleted
Commission date2013
Construction cost€100 million
Owner(s)Promocion Inversolar 65
Solar farm
Type Flat-panel PV
Power generation
Units operational317,000
Nameplate capacity65 MW
Annual net output91 GWh

Sebiș Solar Park is a large thin-film photovoltaic (PV) power system, built on a 200 ha (490 acres) plot of land located in Sebiș, Arad County, in western Romania.

The solar park has around 317,000 state-of-the-art thin film PV panels for a total nameplate capacity of 65-megawatts, and was completed in December 2013. [1] The solar park was expected to supply around 91 GWh of electricity per year, enough to power some 100,000 average homes. [1] [2]

The investment cost for the Sebiș solar park amounted to some 100 million. [1]

See also

References

  1. ^ a b c "Investitie de 100 mil. euro intr-un parc fotovoltaic la Arad". www.wall-street.ro (in Romanian). 2013-02-06. Retrieved 2014-01-03.
  2. ^ "Arad, județul care va avea cel mai mare parc fotovoltaic din țară" (in Romanian). Digi24. 2013-03-27. Retrieved 2014-01-03.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook