![]() | This article includes a list of general
references, but it lacks sufficient corresponding
inline citations. (January 2013) |
![]() Samar patrolling at sea
| |
Class overview | |
---|---|
Name | Samar class |
Builders | Goa Shipyard Limited |
Operators | Indian Coast Guard |
Preceded by | Vikram class |
Succeeded by | Sankalp class |
Planned | 4 |
Completed | 4 |
Active | 2 |
Retired | 2 |
General characteristics | |
Type | Offshore patrol vessel |
Displacement | 1,800 t (1,800 long tons) [1] |
Length | 102 m (334 ft 8 in) [1] |
Beam | 11.5 m (37 ft 9 in) [1] |
Draught | 3.4 m (11 ft 2 in) [1] |
Propulsion | 2 x SEMT Pielstick 16 PA6V280 (4,707 kW or 6,312 hp each) diesel engines [1] |
Speed | 22 knots (41 km/h; 25 mph) [1] |
Range | 6,000 nmi (11,000 km; 6,900 mi) at 14 kn (26 km/h; 16 mph) [1] |
Boats & landing craft carried | 5 boats |
Complement | 15 officers and 113 sailors [1] |
Sensors and processing systems |
|
Armament |
|
Aircraft carried |
|
Samar class of offshore patrol vessels are series of five ships built by Goa Shipyard Limited, Vasco da Gama, Goa for the Indian Coast Guard. [3]
The construction of vessels was ordered in April 1990 and these ships are half-sisters to seven Sukanya-class patrol vessel units in the Indian Navy. A total of twelve were originally planned and then cut to six. The vessels are intended for offshore patrol duties for the protection of oil platforms and the Indian exclusive economic zone.
The vessels in this class are 102 meters (334 ft 8 in) long with a beam of 11.6 meters (38 ft 1 in). They are powered by two Kirloskar-SEMT-Pielstick diesel engines (8,000 hp, 6,000 kW) driving two propellers and have a range 7,000 nautical miles (13,000 km; 8,100 mi) at a cruising speed of 15 knots (28 km/h; 17 mph). The Samar-class ships feature an Integrated Bridge System (IBS), Integrated Machinery Control System (IMCS), high power External Fire Fighting System, two Indian-built 30 mm gun mounts and one 76 mm OTO Melara dual-purpose gun. Besides, the ships are provided with a BEL-made onboard day/night infrared surveillance system to detect elusive targets which can evade radar detection due to their small radar cross-section (RCS) or higher sea state. [4]
Each ship carries a single Dhruv Advanced Light Helicopter (ALH), with dedicated hangar and flight deck, and five high speed boats. The vessels also have towing capacity for salvage and Inmarsat satellite communications. They have accommodation for a crew of 12 officers and 112 enlisted sailors. Additional accommodation has also been provided for passengers. [3]
Name | Pennant | Builder | Laid down | Launched | Commissioned | Decommissioned | Homeport |
---|---|---|---|---|---|---|---|
ICGS Samar | 42 | Goa Shipyard | 1990 | 26 August 1992 | 14 February 1996 [2] | 5 November 2023 [5] | Kochi [6] |
ICGS Sangram | 43 | 1992 | 18 March 1995 | 29 March 1997 [2] | 8 November 2023 [7] [8] | Goa | |
ICGS Sarang | 44 | 1993 | 8 March 1997 | 21 June 1999 [2] | Chennai [9] | ||
ICGS Sagar | 45 | 1999 | 14 December 2001 | 3 November 2003 [2] | Chennai [10] |
![]() | This article includes a list of general
references, but it lacks sufficient corresponding
inline citations. (January 2013) |
![]() Samar patrolling at sea
| |
Class overview | |
---|---|
Name | Samar class |
Builders | Goa Shipyard Limited |
Operators | Indian Coast Guard |
Preceded by | Vikram class |
Succeeded by | Sankalp class |
Planned | 4 |
Completed | 4 |
Active | 2 |
Retired | 2 |
General characteristics | |
Type | Offshore patrol vessel |
Displacement | 1,800 t (1,800 long tons) [1] |
Length | 102 m (334 ft 8 in) [1] |
Beam | 11.5 m (37 ft 9 in) [1] |
Draught | 3.4 m (11 ft 2 in) [1] |
Propulsion | 2 x SEMT Pielstick 16 PA6V280 (4,707 kW or 6,312 hp each) diesel engines [1] |
Speed | 22 knots (41 km/h; 25 mph) [1] |
Range | 6,000 nmi (11,000 km; 6,900 mi) at 14 kn (26 km/h; 16 mph) [1] |
Boats & landing craft carried | 5 boats |
Complement | 15 officers and 113 sailors [1] |
Sensors and processing systems |
|
Armament |
|
Aircraft carried |
|
Samar class of offshore patrol vessels are series of five ships built by Goa Shipyard Limited, Vasco da Gama, Goa for the Indian Coast Guard. [3]
The construction of vessels was ordered in April 1990 and these ships are half-sisters to seven Sukanya-class patrol vessel units in the Indian Navy. A total of twelve were originally planned and then cut to six. The vessels are intended for offshore patrol duties for the protection of oil platforms and the Indian exclusive economic zone.
The vessels in this class are 102 meters (334 ft 8 in) long with a beam of 11.6 meters (38 ft 1 in). They are powered by two Kirloskar-SEMT-Pielstick diesel engines (8,000 hp, 6,000 kW) driving two propellers and have a range 7,000 nautical miles (13,000 km; 8,100 mi) at a cruising speed of 15 knots (28 km/h; 17 mph). The Samar-class ships feature an Integrated Bridge System (IBS), Integrated Machinery Control System (IMCS), high power External Fire Fighting System, two Indian-built 30 mm gun mounts and one 76 mm OTO Melara dual-purpose gun. Besides, the ships are provided with a BEL-made onboard day/night infrared surveillance system to detect elusive targets which can evade radar detection due to their small radar cross-section (RCS) or higher sea state. [4]
Each ship carries a single Dhruv Advanced Light Helicopter (ALH), with dedicated hangar and flight deck, and five high speed boats. The vessels also have towing capacity for salvage and Inmarsat satellite communications. They have accommodation for a crew of 12 officers and 112 enlisted sailors. Additional accommodation has also been provided for passengers. [3]
Name | Pennant | Builder | Laid down | Launched | Commissioned | Decommissioned | Homeport |
---|---|---|---|---|---|---|---|
ICGS Samar | 42 | Goa Shipyard | 1990 | 26 August 1992 | 14 February 1996 [2] | 5 November 2023 [5] | Kochi [6] |
ICGS Sangram | 43 | 1992 | 18 March 1995 | 29 March 1997 [2] | 8 November 2023 [7] [8] | Goa | |
ICGS Sarang | 44 | 1993 | 8 March 1997 | 21 June 1999 [2] | Chennai [9] | ||
ICGS Sagar | 45 | 1999 | 14 December 2001 | 3 November 2003 [2] | Chennai [10] |