From Wikipedia, the free encyclopedia
(Redirected from Railway in Haryana)

Numbered, colour-coded map of Indian Railways zones
Indian Railways zones in Haryana: 1=Northern Railway (Ambala-Yamunanagar-Kalka), 11=North Western Railway (Loharu-Hisar-Fatehabad-Sirsa), and 13=North Central Railway (Delhi and the rest of Haryana)
Overview
Headquarters New Delhi railway station
Dates of operation1952 (1952)–present
Technical
Track gaugeMixed
Other
Website www.nr.indianrailways.gov.in

Rail transport in the state of Haryana, India, is conducted by five rail divisions in three zones: the North Western Railway zone (the Bikaner and Jaipur railway divisions), Northern Railway zone (the Delhi and Ambala railway divisions), and North Central Railway zone (the Agra railway division). The Diamond Quadrilateral high-speed rail network, [1] Eastern Dedicated Freight Corridor, [2] and Western Dedicated Freight Corridor [3] pass through Haryana.

History

19th century

1909 Indian rail map
The Indian railway network in 1909

On 3 March 3 1859, the Allahabad- Kanpur line ( North India's first passenger railway line) opened; it is now part of the Northern Railway zone. [4] Tracks passing through Haryana were completed in 1864, when a broad gauge track from Calcutta to Delhi was laid. [5] In 1866, trains started running on the East Indian Railway Company's Howrah-Delhi line. [6] In 1870, the Scinde, Punjab & Delhi Railway completed its 483-kilometre (300 mi) long Amritsar- Ambala- Jagadhri- Saharanpur- Ghaziabad line connecting Multan (in present-day Pakistan) with Delhi. [7] The Sarai Rohilla railway station was built in 1872, when the metre gauge railway line from Delhi to Jaipur and Ajmer was laid. It was a small station just outside Delhi, which was then a walled city. All metre-gauge trains between Delhi and Rewari, Punjab, Rajasthan and Gujarat passed through Sarai Rohilla. Metre-gauge track from Delhi to Rewari and Ajmer was laid in 1873 by the Rajputana State Railway. [5]

In 1884, the Rajputana-Malwa Railway extended the 1,000 mm (3 ft 3+38 in)-wide (metre-gauge) Delhi-Rewari section of its Delhi–Fazilka line to Bathinda. [8] [9][ unreliable source?] It became the Delhi-Bathinda-Samasatta line, and was opened by the Southern Punjab Railway Company in 1897. [10] The line passed through the Muktasar and Fazilka tehsils and connected Samma Satta (in present-day Pakistan) directly to Karachi. [11] [12] The Bathinda-Rewari metre-gauge line was converted to 1,676 mm (5 ft 6 in)-wide broad gauge in 1994. [13]

The Delhi-Panipat-Ambala-Kalka line was opened in 1891. [14] The 610 mm (2 ft)-wide narrow gauge Kalka-Shimla Railway, built by the Delhi-Panipat-Ambala-Kalka Railway Company, opened in 1903. [15] In 1905, the line became 762 mm (2 ft 6 in)-wide narrow gauge.

20th century

In 1900, the Jodhpur–Bikaner line was merged with the Jodhpur-Hyderabad Railway. Part of this railway is in present-day Pakistan, with connections to Hyderabad in Sindh. In 1901–1902, the line was extended to Bathinda to connect it with the metre-gauge section of the Bombay, Baroda and Central India Railway and the metre gauge of the North Western Railway Delhi–Fazilka line via Hanumangarh. [16] [17] On the Indian border, it was later converted to broad gauge. [18] Mahatma Gandhi was arrested at the Palwal station on his way to Punjab for an April 1919 non-cooperation movement meeting, and a six-foot commemorative statue of Gandhi was installed in October 2013. [19] [20] [21]

In 1926, the New Delhi railway station opened to serve the new imperial capital. Before the capital was founded in 1911, the Old Delhi Railway Station served the city. The Agra-Delhi railway line ran through Lutyens' Delhi, known for its India Gate war memorial and the Rajpath, but was moved to the Yamuna river and opened in 1924 to make way for the new capital. The Minto (Shivaji) and Hardinge (Tilak) rail bridges were built for the rerouting.

The East Indian Railway Company, who oversaw railways in the region, sanctioned the construction of a single-story building with one platform between Ajmeri Gate and Paharganj in 1926; this was later known as New Delhi railway station. Government plans to have the station built inside the Central Park of Connaught Place were rejected by the rail company as impractical. [22]

Work continued after the station opened, and the New Delhi Capital works project to construct 4.79 miles (7.71 km) of new lines was completed in 1927 and 1928. The viceroy and royal retinue entered the city through the new station during the 1931 New Delhi inauguration. New structures were added to the station, and the original building became the parcel office. [23] [24]

On 5 November 1951, the Jodhpur–Bikaner line was merged with the Western Railway. [25] Construction began to convert its metre gauge to 1,676 mm (5 ft 6 in) broad gauge and build a link to Phulera, [26] and it was the Jodhpur–Merta City–Bikaner– Bathinda line by 2008. [27] On April 14, 1952, the Northern Railway zone was created with the merger of the Jodhpur State, Bikaner State and Eastern Punjab Railways and three East Indian Railway divisions northwest of Mughalsarai, Uttar Pradesh.

In 1976-77, the Ghaziabad-Nizamuddin-New Delhi-Delhi line was electrified. [28] On 1 July 1987, the Ambala railway division was created when 639 km of tracks were transferred from the Delhi Division and 348 km were transferred from the Firozpur Division; it became operational on 15 August 1988. Sixty-two percent of the division is in Punjab, with the rest in Haryana, Himachal Pradesh, Uttar Pradesh, Rajasthan and Chandigarh. The division has 141 stations, including the World Heritage Site Kalka Shimla Railway. [29]

Electrification continued during the 1990s, and the Sabjimandi-Karnal sector was electrified between 1992 and 1995. [30] The Ambala-Chandigarh sector was electrified in 1998 and 1999 [31] and was followed by Chandigarh-Kalka, electrified in 1999 and 2000. [31]

Before December 1994, the Delhi-Rewari line had double metre-gauge tracks; that year, one track was converted to broad gauge as part of the Ajmer-Delhi line conversion. [32] Both tracks between the Sarai Rohilla and Delhi railway stations were converted to broad gauge within a few years, and metre-gauge trains stopped operating from the Delhi station. [33]

21st century

The North Western Railway zone was created on 1 October 2002, [34] followed by the North Central Railway zone on 1 April 2003. The second metre-gauge track from Sarai Rohilla to Rewari was converted to broad gauge by September 2006, and metre-gauge trains stopped operating between the stations; the converted track opened for public use in October 2007. [33] [35] Broad-gauge conversions were adjusted for the Bikaner–Rewari line between 2008 and 2011, [13] and for the metre-gauge Hisar-Sadulpur section in 2009. [13] [36]

A 104-km survey for the Panipat–Meerut line was part of the 2010–11 rail budget. The project, costing 948 crore, was approved in the 2017-18 budget. [37] New lines were built and opened in 2013. The Chandigarh–Sahnewal line (also known as the Ludhiana-Chandigarh rail link) was inaugurated, [38] the broad-gauge, electrified Rewari–Rohtak line was built, [39] and the foundation stone for the shifting of a section of the Rohtak-Gohana-Panipat line was laid. [40]

A re-survey of the Yamunanagar–Chandigarh line, costing ₹25 crore, was part of the 2016–17 rail budget. The total cost of the project was 875 crore. [37] In the 2017-18 rail budget, Indian Railways approved the Panipat-Jind line and Panipat-Rohtak line electrification plans costing 980 core. A Panipat-Shamli-Baghpat-Meerut line was approved for 2,200 crore.

By December 2017, 6,095 GPS-enabled Fog Pilot Assistance System railway-signaling devices had been installed in the Northern, North Central, North Eastern and North Western Railway zones. The devices ended the practice of putting firecrackers on train tracks to alert train drivers to reduce speed; the location of signals, level-crossing gates and other such markers is known in advance. [41] The Rewari Railway Heritage Museum, built in 1893, is India's only surviving steam locomotive shed.

Network

Haryana Space Applications Centre, Hisar (HARSAC) has produced the state's railway map, and its lines are included in the rail "pink book". [42] [43] [44]

Divisions and workshops

Haryana has five divisions in three rail zones, and each division has its own workshops.

Lines

Projects

Current

Undertaken by IR and "Rail Infrastructure Development Company (Haryana) Limited" (H-RIDE, also called Haryana Rail Infrastructure Development Corporation).

  • Announced projects (planned and/or being executed, c. Jan 2018)
    Feasibility study survey was completed for the first 7 projects in 10 months from Jan 1, 2018 - Oct 31, 2018. [59]
  • Yamunanagar-Adi Badri-Paonta Sahib-Dehradun line, via Bilaspur, connecting to Chota Char Dham Railway is proposed for future implementation, yet unapproved and an un-surveyed project.
  • Delhi-Sohna-Nuh-Ferozpur Zhirka-Alwar line [59] 104 km link sent to planning commission in 2013 [61] MoU was signed in 2015 [62] , and is included in 2018 pink book. [63] Additional budget was allocated in 2019-20 union railway budget. [60]
  • Kaithal-Patiala line, survey was announced in 2016-17 budget and completed in January 2019. Pending railway board approval for inclusion in the pink book as of Jan 2019. [64]
  • Bhiwani-Loharu line via Kairu-Jui [59] MoU was signed in 2015 and H-RIDE will undertake Bhiwani-Loharu section to connect it to the existing Loharu-Pilani-Jhunjhunu railway link. [65] Additional budget was allocated in 2019-20 union railway budget. [60] Note, Jaipur-Reengas-Churu line was surveyed in 2015-2016. [65]
  • Narwana-Hisar line, 65 km, survey commenced in 2018, [66] direct and shortest route via Narnaund [59]
  • Ukalana-Narwana line 29 km, previously announced connection for direct connectivity to Kurukshetra and Chandigarh [67]
  • Hansi-Jind line 45 km via Narnaund, previously announced complementary connection [67] Additional budget was allocated for Jind-Hisar line in 2019-20 union railway budget. [60]
  • Farrukhnagar-Jhajjar-Charkhi Dadri line, 72 km, [59] Bijwasan-Jhajjar-Charki Dadri was surveyed in 2010, [62] and the next stage survey commenced in 2018, [66] but conducted in 2015. [68] Additional budget was allocated in 2019-20 union railway budget. [60] Extend this along new Charkhi Dadri-Jui-Kairu-Isharwal-Jhunpa route.
  • Jhajjar-Palwal line 95 km including Jhajjar- Farukh Nagar new 30 km link and Patli- Sohna- Manesar- Asaoti( Palwal) new 60 km link along Western Peripheral Expressway was approved by the Haryana government in December 2018 and approval from the railway board is expected shortly. [69] Extend it further to Noida International Airport, Jewar.
  • Note: Hisar-Rajgarh link exists. Survey for Rajgarh-Taranagar-Sardarshar line and Sardarshar-Bhadra-Sirsa line was completed in 2015-16 [65] km [65]
  • Hisar Airport rail line: Existing Hisar-Jakhal line will be extended to Hisar airport as integrated transport hub, DPR will be ready soon (dec 2018 update. [70]
  • Chandigarh(Kalka)- Baddi line, 23.33 km route included in 2018 NR pink book. [63] Preliminary engineering-cum-traffic surveyed in 2010. [71] LOA signed, state released 175 crore, 22 hectares land acquisition in progress (c. Nov 2017). [72] IMT and fruit logistics hub at former HMT site in Pinjore.
  • Announced projects (planned and/or being executed, c. Feb 2015)
  • Previously surveyed (2010) [71]
  • Kaithal-Pundri-Karnal line, 92 km surveyed in 2010 [71]
  • Patiala-Samana-Jakhal-Narwana line, 93 km surveyed in 2010 [71]
  • Bahadurgarh-Jhajjar line, 40 km surveyed in 2010 [71]
  • Yamunanagar-Kurukshetra-Patiala line, 174 km surveyed in 2010 [71]
  • Rajgarh-Taranagar-Sardarshar line survey completed in 2015-16, [65] as well as 100 km Sardarshar-Bhadra-Sirsa line. [65] Sardarshar-Loonkaransar survey (to connect to mahajan firing range and Bikaner) was completed in 2014. Hisar-Rajgarh and Jaipur-Reengas-Churu lines already exist. [65]
Under consideration projects

Under consideration for future inclusion, not yet approved, not yet surveyed:

  • Bilaspur-Paonta Sahib line (to connect proposed Chandigan-Yamunanagr line to Paonta Sahib), to connect to Chota Char Dham Railway
  • Jhumpa Khurd-Bahal-Loharu line, short distance, this missing link will complete railway across western Haryana from Sirsa to Narnaul
  • Jhumpa-Bhiwani line
  • Narnaul-Charki Dadri-Meham line, NE-SW diagonal across Haryana
  • Bhadra-Adampur-Fatehabad-Budhlada line to connect with already surveyed Sardarshahar-Sirsa line,
  • Hisar-Kanwari-Tosham-Kairu-Jui-Mahendragarh line, as western Haryana link
  • Charkhi Dadri- Jhumpa Khurd line
  • Charkhi Dadri-Loharu line
  • Yamunanagar-Indri-Karnal line,
  • Fatehabad-Uklana line (to connect with proposed Uklana-Narwana line), for direct link across north Haryana from Sirsa to Chandigarh
  • Jind-Barwala-Agroha-Adampur line,
  • Karnal-Jind-Hansi-Kanwari-Tosham-Jhumpa line, note that Kaithal-Pundri-Karnal line (also needs further new link to Patra-Sangrur-Barnala-Faridkot) was surveyed in 2010 [71]
  • Karnal-Deoband line, Mujaffarnagar-Deoband-Roorkee line is under construction which will connect Haryana to Haridwar
  • Mujaffarnagar-Shamli-Panipat line, Mujaffarnagar-Deoband-Roorkee line is under construction which will connect Haryana to Haridwar
  • Meerut-Sonipat line
  • Hisar-Anupgarh line via Balsamand-Bhadra-Nohar-Ryanwali-Anupgarh route
  • Bawanikhera-Mahajan line via Gohana-Meham-Bawanikhera-Kanwari-Tosham-Siwani-Sahwa-Pallu-Mahajan-Anupgarh route
  • Mandkola-Dhaulpur line via Mandkola-Hathin-Uttawar-Punhana-Barsana-Govardhan-Deeg-Bharatpur-Dhaulpur route from where it connects to existing Delhi-Dhaulpur-Gwalior-Nagpur route. Also provides alternate route to Agra and Mathura. [75]
Under construction projects

Pink book projects under construction as per live map in the citation: [76]

  • Hisar-Hansi-Rohtak line, Rohtak-Meham under construction with all land in possession of IR and will be completed by June 2019, and Hansi-Hisar tender planning was underway in Nov 2017. [72]
  • Palwal-Firozepure Jhirka-Alwar line, via Palwal-Mandkola-Nuh-Bhadas-Firozepure Jhirka-Ootwar-Alwar, as per pink book. [76]
NCR projects


  • Hisar as CMG links
  • Hisar-Patiala rail link: exists (a) Ukalana-Narwana link and Kaithal-CheekaGuhla-Samana link in Haryana or (b) Jakhal/Moonak-Patra-Samana link in Punjab as an alternate route
  • Hisar-Karnal-Ambala rail link: Missing links are (a) Uklana-Narwana link and Kaithal-Pundri-Karnal link (b) Hansi-Jind link (under survey) and (c) Jind-Karnal link
  • Hisar-Gwaliar rail link: exists except Bhopal-Beora-Ramganj-Jhalawar link which is being implementation and tenders were issued in 2014 [78] [79]
  • Hisar-Jaipur-Kota-Bhopal rail link: exists except Bhopal-Beora-Ramganj-Jhalawar link which is being implementation and tenders were issued in 2014 [78] [79]


  • Karnal and Ambala as CMG links (includes Patiala as CMG links)
  • Karnal-Dehradun rail link: Karnal-Yamunanagar missing links is under survey
  • Karnal-Bareilly rail link: Under survey Karnal-Yamunanagar links willprovide indirect route, the direct link Karnal-Shamli-Muzaffarnagar-Bijnor-Shahspur is missing, needs approval and will be of strategic importance to Rajasthan-Pithoragarh (Pakistan to China border) army movement, it will also directly connect Mahabharta religious city of Kurukshetra with the Char Dham rail network
  • Karnal-Jaipur rail link exists via Rohtak-Rewari-Alwar
  • Karnal-Kota rail link exists via Jaipur except the under-construction rail link from Jhalawar to Bhopal (see Hisar Kota link link)


  • Gwaliar as CMG links (concludes Bareilly and Kanpur as CMG)
  • All exist. There is existing Gwaliar-Jhansi-Kanpur line, Gwaliar-Agra-Breilly line and Kanpur-Unnao-Bareilly line.
Other future projects of interest

This is live rail map in citation. [76]

Himachal Pradesh
  • New rail links in Himachal Pradesh
    • Nangal Dam- Talwara line, 83.74 km route included in 2018 pink book. [63]
    • Banopli- Bilaspur-Beri line, 63.1 km route included in 2018 pink book. [63]
      • Chadigarh(Kalka)-Baddi line, 33.23 km route included in 2018 pink book, [63] under construction.
    • Una- Hamirpur line, 50 km route included in 2018 pink book. [63]
  • New rail links from Himchal Pradesh to J&K
  • New rail links from Himachal Pradesh to Uttrakhand
Punjab
  • New rail links in Punjab near Haryana Border
    • Abohar-Fazilka line, 42.717 km route included in 2018 pink book. [63]
    • Chandigarh- Ludhiana line, 112 km route included in 2018 pink book. [63]
  • New rail links from Punjab to Himachal Pradesh
  • New rail links to J&K
  • New rail links from Punjab to Pakistan
Rajasthan
  • Bhatinda-Dabwali-Hanumangarh-Pilibangan-Suratgarh line is operational [80] and electrification work commenced in 2018-19 at the cost of INR350 crore. [81]
  • New rail links in Rajasthan near Haryana Border
    • Sardarshahar
      • Lunkaransar-Sardarshar-Taranagar-Sadulpur (Rajgarh) link
        • Sardarshar-Lunkaransar line (82 km) survey was announced in 2013 to connect existing end points for strategic military requirements. [82] In 2015 budget, additional INR9 lakh allocated for survey work by Railway minister. [83]
        • Sardarshar-Taranagar-Sadulpur (Rajgarh) line (100 km) survey was announced in 2015 to connect existing end points. [83]
      • Sardarshahar-Nohar-Sirsa line via Jingana-GudianaKhera-Arniawali-Bajekan (94 km) survey was announced in 2013 and cost estimates were prepared. [84] In 2015 budget, additional INR14 lakh allocated for survey work by Railway minister. [83]
      • Sardarshahar-Suratgarh-Gajsinghpur line (115 km) survey was announced in 2015. [85] [83]
    • Gajsinghpur (Pak border)-Padampur-Goluwala-Pilibanga-Rawatsar-Sahawa-Taranagar-Daderwa-Sadulpur(Rajgarh) line survey was announced in 2013 to connect existing end points for strategic military requirements [82] In 2015 budget, additional INR44 lakh allocated for survey work by Railway minister. [83]
    • NeemKaThana(on Delhi-Rewari-Jaipur line)-Sikar-Salasar-Sujangarh line (150 km) survey was announced in 2013, [86]
    • Alwar-Behror-Narnaul-Charkhi Dadri line survey was announced in 2013 was pending approval for the financial vetting in 2015. [87] No budget was allocated in 2015. Should be extended to Nokha-Phalodi (to Bikaner).
    • Dausa- Gangapur line, 92.67 km route is included in 2018 NCR pink book. [88] Will provide direct Delhi-Faridabad-Alwar-Dausa-Kota-Gwalior access by bypassing aipur on its west.
    • Ratlam- Banswara- Dungarpur line, 176.47 km route is included in 2018 NCR pink book. [88]
    • Gauge conversion (all gauge conversion across India will be completed by March 2022)
  • New rail links from Rajasthan to Madhya Pradesh
    • Jhalawar-Biaora-Bhopal line tender was issued in 2014 for construction. [89]
    • Gauge conversion (all gauge conversion across India will be completed by March 2022)
      • Jaipur-Bhopal existing link: Gwaliar- Sheopur- Kota line gauge conversion of 284 km route is included in 2018 NCR pink book. [90]
      • Agra-Kota-Ujjain-Khandwa-Akola-Washim existing link: Gangapur, Sawai Madhopur Dhaulpur-Sirmuttra- Gangapur line gauge conversion of 144.6 km route is included in 2018 NCR pink book. [90]
  • New rail links from Rajasthan to Gujrat and Maharashtra
UP
  • New rail links in UP near Haryana Border
    • Karnal-Haridwar: Deoband- Roorkee line, 27.45 km route included in 2018 pink book, [63] Karnal to Deoband is the missing link.
    • Mathura- Vrindavan line, 11 km route is included in 2018 NCR pink book. [90]
  • New rail links from UP to Nepal
Uttrakhand
NCR CMG connectivity
  • Complimentary NCR CMG (counter Magnet City) Interconnectivity NH (National Highways) projects
    • From Hisar:
      • Hisar-Jaipur: Hisar-Kaimri-Isharwal and Gokulpura-RampuraBeri-Pilani and Chirawa-Chanana-Ponkh-Chala(or Neem Ka Thana) are missing links
      • Hisar-kota: Ponkh-Khatu-Renwal and Jobner-Mahlan-Shankarpura-Choru-Chosla, Chandser (NH16)-Tordi(NH37A) and Todraisingh-Botunda-NH52(Deoli) are missing links
      • Hisar-Patiala: Barwala-Surbara-Narwana, Hatho-Kolekhan-Guhna-Attela-Bhuna-Cheeka-Panjola is the missing link
      • Hisar-Ambala: Barwala-Uchana-Titram Kaithal the missing link
      • Hisar-Karnal: NH9-Dhansu-Chanot-Masudpur-Narnaund is missing link (newly constructed SH/MDR can be converted to NH)
      • Hisar-Dehradun: NH8-Newal-Gangoh(needs new Yamuna bridge)-Ambheta-Saharanpur
      • Hisar-Bareilly: Barfeilly-Chandausi-Pawasa-Dhawarsi-Siyana-Kuchesar-Babugarh-Hapur(new northern bypass), Rasoolpur Dhaulri-Doula(NH334B)-Goripur and SOnepat-Farmanah-LakhanMajra-Bass-BhatolJattan-Pal-ki-Dhani(NH12)-Bhatla(NH17)-Niyana-Shikarpur-NH9 (Radha Soami Satsang Beas Hisar-1) are missing direct link
      • Hisar-Kanpur: Kanpur(NH19)-Rura-Dibiyapur(NH234)-Bakewar, Rewari-Tupkara-Nuh-Ujina-Hodal, Mandola-Kosli-Palhawas-Pataudi-Taoru, Dohki(NH17)-Rajgarh(NH709)-Dinod-Tosham(NH17)-Kanwari-Hisar are missing link
      • Hisar-Gwalior: Kanina(NH24)-Palri(NH17)-Jui(NH709)-Kairu(NH12)-Isharwal(NH12)is missing link
      • HisarAirport-Delhi Airport: Hisar-Kanwari-Tigrana-Bamla-Matenhail-Bhindawas-Silana(NH35)-Kiloi(NH15A)-Badli-IGI Airport GREENFIELD EXPRESSWAY is missing link (under plan?) Take note of greenfield and direct route alignment that also connects unconnected Tehsils and various Bird Sanctuaries in Matenhail, Bindhawas, Khaparwas, Macchrauli, etc.
    • From Karnal (includes Ambala and Patiala):
      • Ambala-Jaipur-kota: Ambala-Rehra-CharkhiDadri greenfield NH route has been announced as NH and industrial corridor, Nizampur(Narnaul)-Patan-Shahpur is the missing link
    • Ambala-Dehradun:
      • Ambala-Bareilly: Shamli-Khatoli-Hastinapur-Joya-Kindarki-Shahbad-Bareilly is missing NH link
      • Ambala-Kanpur: Samalkha-Baraut-Hapur-Meerut-Kahangirabad-Dibai-Bahediya-Aliganj-Chibbramau-Talgram-Kakaaan-Shivli-Kanpur
      • Ambala-Gwalior: Nih-Ujina-Uttawar-Punhana-Kaman is missing link
      • Kaithal-Pundri-Karnal
      • Karnal-Haridwar: Deoband- Roorkee line, 27.45 km route included in 2018 pink book, [63] Karnal to Deoband is the missing link.


    • From Barilly:
      • Barilly-Jaipur-Kota: Sirmathura-Mandrayal-Chancheri-Khandar-NJ30-to-Khatoli
      • Barilly-Dehradun: Rampur-Dilari-Sahaspur and Nagina-Nazibabad-Roorkee are missing link
      • Barilly-Kanpur: Farukhabad-Pihan-Sauna-Rapra-Pravea-HarodiaBholapur-Kandharpur
      • Barilly-Gwalior: Badaun-Ganj Dundwara-Sakot-Shikohabad-Porsa-Pariksha-Gwalior is missing NH link


    • From Kanpur:
      • Kanpur-Jaipur-Kota: Fatehabad (Agra)-Khairgrah-Uchena is missing link
      • Kanpur—Kota: Hwaliar-Tentara and Lakshmanpura-Sheopur are missing link
      • Kanpur-Gwalior: Kuthond-Madhogarh-Mihona-Mau is missing link

National freight corridors

Diamond Quadrilateral High-speed rail network, [1] Eastern Dedicated Freight Corridor (72 km) [2] and Western Dedicated Freight Corridor (177 km) [3] pass through Haryana.

Special rail

UNESCO Heritage rails
Tourist circuit rail

Sri Krishna circuit on Vrindavan-Mathura-Govardhan-Barsana-Kurukshetra route and Hemu heritage circuit on Delhi-Rewari-Madhogarh-Panipat route. [91] Other potential circuits are Prithviraj circuit on Faridabad(Surajkund)- Taraori- Asigarh Fort(Hansi)-Hisar-Tosham route, Haryana Buddha circuit on Hisar(ashoka pillar in mosque in Firoz Shah Palace Complex)- Agroha Mound-Fatehabad(Ashoka lat in mosque)-Kurukshetra(Buddha satupa on main sarovar)-Topra-Sugh-Chaneti.

Luxury rail

Luxury rail in Haryana are the Delhi-Rewari Fairy Queen Heritage Train and the proposed Delhi-Rewari-Madhogarh Heritage Rail Circuit. [91]

High-speed rail

Semi-High Speed rail: 160-200 km

Delhi-Agra and Delhi-Chandigarh routes will be converted to the average speed of 160–200 km per hour. [92] [93] The project was conceived in 2014.

Delhi-Chandigarh semi high speed rail corridor with 200 km/h via Ambala Cantt and Panipat will commence construction work in 2019. Cost of this corridor 11,218 crore.

Rapid Rail Transport System (RRTS)

The under-construction Delhi-Alwar RRTS and Delhi-Sonepat-Panipat RRTS will pass through Haryana. In 2017 December, National Capital Region Transport Corporation signed agreements with Administrador de Infraestructuras Ferroviarias (Spain's state-owned company) and Société nationale des chemins de fer français (France's state-owned company) to cooperate on the development of rapid rail smart projects, including Delhi-Meerut Smart Line, Delhi-Panipat Smart Line and Delhi-Alwar Smart Line have been prioritized for implementation in the first phase of NCR RRTS where these three lines will operate from Sarai Kale Khan in Delhi. Designed with 180 km/h design speed, 160 km/h operational speed, and 100 km/h average speed, of six-car trains carrying 1,154 passengers running every 5 to 10 minutes on either underground or elevated point-to-point tracks where passengers will not have to change trains. 35-40% funding will be equity from Centre and state governments and the remaining 60% will come from multilateral funding agencies. [94] [95] [96]

  • Delhi-Alwar RRTS: Delhi-Alwar line will have 19 stations, 9 underground stations from ISBT Kashmere Gate to Kherki Daula and 10 elevated stations on 124.5 km route. [96]
  • Delhi-Sonipat RRTS: INR 30,000 crore Delhi-Panipat Smart Line and 180.5 km will cost around Rs 37,539 crore Delhi-Alwar Smart Line are awaiting DPR approval, construction to commence by the end of 2018 and completed before 2025. Cost of this corridor is 30,000 crore. At four major stops in Panipat: Panipat Depot, Panipat North, Panipat South and Samalkha.
  • Delhi-Rohtak-Hisar RRTS

High Speed 200-500 km/h rail

Delhi-Mumbai high-speed rail and Delhi–Amritsar high-speed rail of Diamond Quadrilateral High-speed rail network via Sohna- Rewari- Narnaul will pass through Haryana. [1] The Ministry of Railways has established the National High-Speed Rail Corporation Limited as a government company on February 12, 2016, to promote high-speed rail corridors. [97] The Indian Ministry of Railways' white-paper "Vision 2020", envisages the implementation of regional high-speed rail projects to provide services at 250–350 km/h, and planning for corridors connecting commercial, tourist, and pilgrimage hubs. Six corridors have been identified for technical studies on setting up of high-speed elevated rail corridors, including the following 2 passing through Haryana: [98]

  • DelhiChandigarhAmritsar: This 458 km corridor costing 1 lakh crore has been approved by the railway board and construction will commence in year 2020. The route alignment is Delhi-Panipat-Ambala-Chandigarh-Ludhiana-Jalandhar-Amritsar
  • Delhi- Agra- Lucknow- Varanasi- Patna

Personal Rail Transport (PRT) Metrino

Dhaula Kuan-Gurugram- Manesar Personal rapid transit, also called Metrino, was initiated in Dec 2017 by the Government of India by inviting fresh expression of interest from the providers. [99]

Metro train

Current

Proposed

  • Chandigarh and Panchkula: Chandigarh Metro (proposed)
  • Sonipat Metro - extension Red Line (Delhi Metro):
    In June 2017, the Government of Haryana's cabinet approved the investment of INR 968.20 (US$150 million), as its share on the 80:20 equity ratio with the union government, for the 4.86 kilometres (3.02 mi) extension of Delhi Metro from the existing Rithala metro station to Sonipat via Bawana with three elevated stations at Sector 5 of Narela in Delhi, on Delhi border at Kundli Industrial Area and Nathupur Industrial Area in Sonipat, which are planned to be built starting from April 2018 and to be completed by March 2022 as part of the Phase IV. [100] There are plans to further extend this line deeper into the Sonipat city (via Rajiv Gandhi Education City) and beyond to Murthal ( Deenbandhu Chhotu Ram University of Science and Technology) in the future.
  • Bahadurgarh Metro - Green Line extension:
    An extension of Green Line from Mundka along the NH 9 will under construction and on schedule to be completed by December 2017 (as of June 2017). [101]
  • Rohtak Metro - Green Line extension:
    An extension of Green Line from Bahadurgarh, proposed only and not yet approved as of July 2017. [102]
  • Kharkhoda Metro - Red Line extension:
    From the existing Rithala metro station to the new stations in Rohini and Bawana industrial area, to Kharkhoda in Haryana, and up to Rohtak via Sisana as second line to Rohtak. As of July 2017, proposed only and not yet approved.
  • Jhajjar Metro - Blue Line extension:
    from existing Blue line to Najafgarh and Kharkari in Delhi to Badli in Haryana on Jhajjar border (not to be confused with Badli Industrial area of Delhi in Sonipat border) and Jhajjar city in Haryana. As of July 2017, proposed only and not yet approved. [103]
  • Dwarka - AIIMS Bhadsa - Farukh Nagar - Gurugram Blue Line extension:
    from the existing Blue line at Dwarka to AIIMS Jhajjar at Badsha, Farukh Nagar and Gurugram in Haryana. As of July 2017, proposed only and not yet approved. [103]
  • Dwarka-Gurugram - Blue Line and Orange Line Airport Express extension:
    As second connection via Kapashera and Bijwasan on Haryana border. [104] To complete the metro ring around Gurugram, a proposal was prepared in November 2017 for the two missing routes, [105]
    (a) for Blue Line (Delhi Metro) "HUDA City Centre metro station" to Dwarka Sector 21 metro station (via Sector-45, Sector-46, Sector-47, Subhash Chawk, Bahrampur, Hero Honda Cross, Udhyog Vihar-6, Sector-37 Pataudi road, Sector-10 Basai road, Sector-9 Dhankot railway station, Sector-7, HUDA Road, Sector-4/5, Ashok Vihar, Palam Vihar, Palam Vihar Sector-1, Palam Vihar Sector-23, Sector-111, Bijwasan border, Bijwasan railway station and Barthal),
    (b) from HUDA City Centre metro station to Gurgaon railway station (via Sector-45, Sector-46, Sector-47, Subhash Chawk, Rajiv Chawk, HUDA road and Sector-4/5).
  • Gurugram - Manesar Yellow Line extension:
    An extension of the existing yellow line at Gurugram to Manesar Industrial township in the west. In May 2017, a joint study by HUDA and Haryana Town and Planning found the proposal to be technically and financially viable and Detailed Project Report is being prepared for the approval. [102]
  • Balramgrah (Faridabad) - Palwal Violet Line extension:
    From existing Balramgarh (Ballabhgarh) to Palwal district headquarters. As of July 2017, proposed only and not yet approved. [102]

Multimodel transit centres (MMTC)

Five multimodel transit centres are being built, each one along the Delhi Western Peripheral Expressway (WPE) in the vicinity of railway stations, metro, RRTS and major national highways. These MMTCs will be located at: [106]

  • Sonipat: Kundli MMTS between Rajiv Gandhi Education City RRTS station and WPE interchange,
  • Bahadurgarh MMTS between Bahadurgarh bus stand and metro station,
  • Ballabhgarh MMTS between Ballabhgarh Metro Station, bus stand and railway station,
  • Panchagaon Chowk MMTS between proposed metro station and Gurugram RRTS station, and
  • Kherki Daula MMTS near proposed metro station and Delhi-Alwar RRTS station and bus stand on the junction of Chhapra and Naihati villages.

Multimodel logistics hubs

Issues

Multiple issues include the lack of progress on announced projects, lack of comprehensive long-term transport needs analysis and planning, lack of funding, lack of connectivity, lack of integration with multimodal transport, lack of effective utilization of existing infrastructure such as integrated logistics and industrial hubs, land acquisition, etc. [108] [109] [110] [111]

See also

References

  1. ^ a b c Address by The President of India to the Joint sitting of Parliament 2014 (PDF), archived from the original (PDF) on 14 July 2014
  2. ^ a b "Eastern DFC". Archived from the original on 26 November 2017. Retrieved 4 December 2017.
  3. ^ a b "Western DFC". Archived from the original on 3 December 2017. Retrieved 4 December 2017.
  4. ^ Asiatradehub.com.com. "India – Infrastructure Railways". Archived from the original on 16 October 2008. Retrieved 23 January 2018.
  5. ^ a b "Delhi District: Trade and communications". The Imperial Gazetteer of India, Vol. 11. Oxford at Clarendon Press. 1909. p. 229.
  6. ^ "IR History: Early History (1832-1869)". IRFCA. Retrieved 28 June 2013.
  7. ^ R. P. Saxena. "Indian Railway History Time line". Irse.bravehost.com. Archived from the original on 29 February 2012. Retrieved 24 January 2014.
  8. ^ "Gazetteer of India, Haryana, Hisar" (PDF). Haryana Government. Communications, page 135. Archived from the original (PDF) on 1 May 2014. Retrieved 10 May 2014.
  9. ^ "Rajputana Malwa State Railway". fibis. Retrieved 10 May 2014.
  10. ^ "IR History: Early Days II (1870-1899)". Retrieved 26 February 2014.
  11. ^ "Chapter VII Communications". Archived from the original on 23 February 2014. Retrieved 26 February 2014.
  12. ^ "Chapter VII Communications". Archived from the original on 23 February 2014. Retrieved 1 March 2014.
  13. ^ a b c d e "Overview of Bikaner Division" (PDF). North Western Railway. Archived from the original (PDF) on 8 May 2014. Retrieved 7 May 2014.
  14. ^ "IR History: Early Days II (1870-1899)". Retrieved 7 March 2014.
  15. ^ "Engineer" journal article, circa 1915, reprinted in Narrow Gauge & Industrial Railway Modelling Review, no. 75, July 2008
  16. ^ "Jodhpur-Bikaner Railway". fibis. Archived from the original on 2 February 2014. Retrieved 10 May 2014.
  17. ^ "IR History: Part II (1870-1899)". IRFCA. Retrieved 10 May 2014.
  18. ^ "Railway line along Indian border". Press Information Bureau, Govt. of India, 21 April 2008. Retrieved 10 May 2014.
  19. ^ "Gandhi's statue damaged in Palwal : The Tribune India".
  20. ^ EMU rams into train near Palwal, driver dies
  21. ^ Chauhan, Arvind (29 October 2015). "India's fastest train Gatimaan Express to become operational by March 2016" – via The Economic Times - The Times of India.
  22. ^ "CP's blueprint: Bath's Crescent". Hindustan Times. 8 February 2011. Archived from the original on 3 January 2013.
  23. ^ "A fine balance of luxury and care". Hindustan Times. 21 July 2011. Archived from the original on 14 December 2014.
  24. ^ "When Railways nearly derailed New Delhi". Hindustan Times. 18 January 2011. Archived from the original on 26 September 2013.
  25. ^ "Western railway history".
  26. ^ "Written answers to Question asked in Parliament". Railway expansion programme in Rajasthan. Government of India. Archived from the original on 8 May 2014. Retrieved 7 May 2014.
  27. ^ "Railway line along Indian border". Press Information Bureau, Govt. of India, 21 April 2008. Retrieved 7 May 2014.
  28. ^ "History of Electrification". IRFCA. Retrieved 28 June 2013.
  29. ^ a b c Ambala Division map and history.
  30. ^ "History of Electrification". IRFCA. Retrieved 3 March 2014.
  31. ^ a b "History of Electrification". IRFCA. Retrieved 21 February 2014.
  32. ^ "[IRFCA] Indian Railways FAQ - IR History - 1970 - 1994". www.irfca.org.
  33. ^ a b Press Information Bureau English Releases
  34. ^ "North Western railway history". Archived from the original on 4 March 2016.
  35. ^ "Delhi-Haryana rail link gets better". The Hindu. 8 October 2007. Archived from the original on 13 October 2007.
  36. ^ "Bathinda–Rewari line route map". India Rail Info.
  37. ^ a b Haryana gets much less than expected in rail budget, Jagran, 25 February 2016.
  38. ^ "New Rail Link". The Tribune, 19 April 2013. Retrieved 21 February 2014.
  39. ^ "Haryana gets first functional railway line after 33 years". Business Standard, 7 January 2013. Retrieved 26 February 2014.
  40. ^ "Minister for Railways Sh. Mallikarjun Kharge lays the foundation stones of 'Rohtak-Meham-Hansi new line and shifting of Rohtak-Makrauli section of Rohtak-Gohana-Panipat section today". Northern Railway. Retrieved 3 March 2014.
  41. ^ Indian Railways to use GPS-enabled devices to fight fog this season, Economic Times, 12 Dec 2017.
  42. ^ Multi-model transport network map of Haryana, Haryana Space Applications Centre, Hisar.
  43. ^ Railway network of Haryana, HARSAC.
  44. ^ Pink book, Indian Railway.
  45. ^ a b Bikaner Division map and history
  46. ^ "infra".
  47. ^ "NWR railway Bikaner division slidings" (PDF).
  48. ^ "North Western Railway / Indian Railways Portal". nwr.indianrailways.gov.in.
  49. ^ a b Jaipur division network map
  50. ^ a b Delhi division map and history
  51. ^ a b "Zones and their Divisions in Indian Railways" (PDF). Indian Railways. Archived from the original (PDF) on 19 March 2015. Retrieved 13 January 2016.
  52. ^ a b "Ambala Railway Division". Railway Board. Northern Railway zone. Retrieved 13 January 2016.
  53. ^ "Statement showing Category-wise No.of stations in IR based on Pass. earning of 2011" (PDF). Archived from the original (PDF) on 28 January 2016. Retrieved 15 January 2016.
  54. ^ a b "PASSENGER AMENITIES - CRITERIA= For Categorisation Of Stations" (PDF). Archived from the original (PDF) on 4 March 2016. Retrieved 15 January 2016.
  55. ^ Kalka workshop
  56. ^ a b "North Central Railways / Indian Railways Portal". ncr.indianrailways.gov.in.
  57. ^ a b "North Central Railways / Indian Railways Portal". www.ncr.indianrailways.gov.in. Retrieved 4 December 2017.
  58. ^ Rly Min gives approval for accelerated speed rail route between Delhi and Hisar, United News, 29 Dec 2017.
  59. ^ a b c d e f g h 7 new projects announced, India Today, 26 January 2018.
  60. ^ a b c d e f New rail projects will get speed in Haryana, Amar Ujala, 3 Feb 2019.
  61. ^ a b c Three railway line projects for Haryana, state government will give 50%: Hooda, Times of India, 28 July 2013.
  62. ^ a b c d e f g h Haryana, Railways for speedy implementation of projects, The Hindu, 1 Feb 2015.
  63. ^ a b c d e f g h i j k l m n o p Northern Railway Pink Book 2018.
  64. ^ Patiala-Kaithal rail line survey complete, Amar Ujala, 1 Feb 2019.
  65. ^ a b c d e f g Rajasthan gets more railines to Haryana and Punjab, Rajasthan Patrika.
  66. ^ a b Haryana Samvad Archived 29 November 2018 at the Wayback Machine, Oct 2018.
  67. ^ a b Hisar MP meets railway minister, seeks more train for his constituency, Times of India, 4 Feb 2017.
  68. ^ State got several railway projects, The Tribune, Feb 2015.
  69. ^ Haryana clears railway link between Panipat and Palwal, awaits centre's nod, Times of India, Dec 2018.
  70. ^ Hissar airport will be connected directly to delhi from railline, Dainik Jagran, 25 Dec 2018.
  71. ^ a b c d e f g Survey of railway lines, Project Today, 2010.
  72. ^ a b NR current survey status 2017.
  73. ^ New raliline between Hissar to Sirsa in Haryana, Amar Ujala, 3 Feb 2019.
  74. ^ छह वर्ष बाद भी अलवर-चरखी दादरी रेलवे लाइन के सर्वे का इंतजार, Amar Ujala, 2017.
  75. ^ "Mandkola to Dholpur". Mandkola to Dholpur.
  76. ^ a b c "Runicha Express/14659 Train Running Status Merta Road/MTD to Phalodi/PLCJ - Railway Enquiry". indiarailinfo.com.
  77. ^ Meerut-Panipat railway line soon, Amar Ujala, 2016.
  78. ^ a b Bhopal-Ramganj rail link tender
  79. ^ a b "Ramganj Mandi to Bhopal". Ramganj Mandi to Bhopal.
  80. ^ "Bathinda to Suratgarh". Bathinda to Suratgarh.
  81. ^ Hisar-Bhatinda-SuratGarh electrification has commenced, Rajasthan Patrika, 2017.
  82. ^ a b "Gajsinghpur to Lunkaransar". Gajsinghpur to Lunkaransar.
  83. ^ a b c d e 4 new rail lines from Sardarshar being surveyed: Sardarshar-Taranagar-Sadulpur (Rajgarh) line, Sardarshar-Loonkaransar line, Sardarshar-Suratgarh-Gajsinghpur line and Sardarshar-Sirsa line.
  84. ^ "Sardarshahar to Sirsa". Sardarshahar to Sirsa.
  85. ^ "Sardarshahar to Gajsinghpur". Sardarshahar to Gajsinghpur.
  86. ^ 3 new surveys and additional budget for 4 previously planned surveys in 2015 budget announced by the Railway Minister Suresh Prabhu, 2015.
  87. ^ "Alwar to Charkhi Dadri". Alwar to Charkhi Dadri.
  88. ^ a b c d e "2018 NWR Pink Book" (PDF).
  89. ^ "Jhalawar to Bhopal". Jhalawar to Bhopal.
  90. ^ a b c 2018 NCR Pink Book.
  91. ^ a b Railway heritage theme park on the anvil at Rewari, Daijiworld, 19 Jan 2018.
  92. ^ "Railways completes pilot project for semi-high-speed train".
  93. ^ "Indian Railways To Launch Semi High Speed Bullet Trains On Three Routes". Archived from the original on 25 March 2016. Retrieved 18 December 2018.
  94. ^ India Spain cooperate in rail, 1 December 2017.
  95. ^ "On track: Direct trains on high-speed rail corridor to and from most NCR towns", Hindustan Times, 28 November 2017.
  96. ^ a b "High speed rail link by 2023 to cut journey time to 30 minutes at 100 km/h between Kashmere Gate and Gurgaon", The Economic Times, 23 April 2017.
  97. ^ "Welcome to HSRC". hsrc.in. Retrieved 20 July 2017.
  98. ^ "Indian Railways: Vision 2020" (PDF). Indian Railways. December 2009. Retrieved 29 November 2014.
  99. ^ Gadkari looking to launch India's first private rapid transit system from Dhaulan Kuan to Manesar, Hindustan Times, 19 Dec 2017.
  100. ^ Delhi Metro to be extended till Haryana's Sonepat Archived 29 July 2017 at the Wayback Machine, The Economic Times, 1 July 2017.
  101. ^ Delhi Metro's longest line: Majlis Park to Shiv Vihar set to open, Eturbo News, Juergen T Steinmetz, 6 June 2017.
  102. ^ a b c Expected PM Narendra Modi to announce Metro's extension to other parts of Haryana, says CM Bhupinder Hooda, DNA India News, September 2015.
  103. ^ a b AIIMS demands metro connectivity to its Jhajjar centre, Drug Today News, 14 May 2015.
  104. ^ Metro to connect HUDA City Centre station with Gurugram railway station , The Hindu, 4 May 2017.
  105. ^ "हुडा सिटी सेंटर से रेलवे स्टेशन व द्वारका तक मेट्रो चलाने की तैयारी.", Amar Ujala, 17 Nov 2017
  106. ^ Haryana govt to set up multi modal transit centres Outlook, 11 Jan 2018.
  107. ^ a b c d Dubai-based company keen on investing in state, The Tribune, 6 Dec 2017.
  108. ^ Critical Issues Related to Metro Rail Projects in India, 21 Dec 2017.
  109. ^ Double-lane rail track to miss another deadline, The Tribune, 12 July 2017.
  110. ^ Railway minister shows green light to pending projects in state, Times of India, 2 April 2015.
  111. ^ Now onus on states to ensure land transfer for rail projects , Indian Express, 15 Nov 2017.

External links

From Wikipedia, the free encyclopedia
(Redirected from Railway in Haryana)

Numbered, colour-coded map of Indian Railways zones
Indian Railways zones in Haryana: 1=Northern Railway (Ambala-Yamunanagar-Kalka), 11=North Western Railway (Loharu-Hisar-Fatehabad-Sirsa), and 13=North Central Railway (Delhi and the rest of Haryana)
Overview
Headquarters New Delhi railway station
Dates of operation1952 (1952)–present
Technical
Track gaugeMixed
Other
Website www.nr.indianrailways.gov.in

Rail transport in the state of Haryana, India, is conducted by five rail divisions in three zones: the North Western Railway zone (the Bikaner and Jaipur railway divisions), Northern Railway zone (the Delhi and Ambala railway divisions), and North Central Railway zone (the Agra railway division). The Diamond Quadrilateral high-speed rail network, [1] Eastern Dedicated Freight Corridor, [2] and Western Dedicated Freight Corridor [3] pass through Haryana.

History

19th century

1909 Indian rail map
The Indian railway network in 1909

On 3 March 3 1859, the Allahabad- Kanpur line ( North India's first passenger railway line) opened; it is now part of the Northern Railway zone. [4] Tracks passing through Haryana were completed in 1864, when a broad gauge track from Calcutta to Delhi was laid. [5] In 1866, trains started running on the East Indian Railway Company's Howrah-Delhi line. [6] In 1870, the Scinde, Punjab & Delhi Railway completed its 483-kilometre (300 mi) long Amritsar- Ambala- Jagadhri- Saharanpur- Ghaziabad line connecting Multan (in present-day Pakistan) with Delhi. [7] The Sarai Rohilla railway station was built in 1872, when the metre gauge railway line from Delhi to Jaipur and Ajmer was laid. It was a small station just outside Delhi, which was then a walled city. All metre-gauge trains between Delhi and Rewari, Punjab, Rajasthan and Gujarat passed through Sarai Rohilla. Metre-gauge track from Delhi to Rewari and Ajmer was laid in 1873 by the Rajputana State Railway. [5]

In 1884, the Rajputana-Malwa Railway extended the 1,000 mm (3 ft 3+38 in)-wide (metre-gauge) Delhi-Rewari section of its Delhi–Fazilka line to Bathinda. [8] [9][ unreliable source?] It became the Delhi-Bathinda-Samasatta line, and was opened by the Southern Punjab Railway Company in 1897. [10] The line passed through the Muktasar and Fazilka tehsils and connected Samma Satta (in present-day Pakistan) directly to Karachi. [11] [12] The Bathinda-Rewari metre-gauge line was converted to 1,676 mm (5 ft 6 in)-wide broad gauge in 1994. [13]

The Delhi-Panipat-Ambala-Kalka line was opened in 1891. [14] The 610 mm (2 ft)-wide narrow gauge Kalka-Shimla Railway, built by the Delhi-Panipat-Ambala-Kalka Railway Company, opened in 1903. [15] In 1905, the line became 762 mm (2 ft 6 in)-wide narrow gauge.

20th century

In 1900, the Jodhpur–Bikaner line was merged with the Jodhpur-Hyderabad Railway. Part of this railway is in present-day Pakistan, with connections to Hyderabad in Sindh. In 1901–1902, the line was extended to Bathinda to connect it with the metre-gauge section of the Bombay, Baroda and Central India Railway and the metre gauge of the North Western Railway Delhi–Fazilka line via Hanumangarh. [16] [17] On the Indian border, it was later converted to broad gauge. [18] Mahatma Gandhi was arrested at the Palwal station on his way to Punjab for an April 1919 non-cooperation movement meeting, and a six-foot commemorative statue of Gandhi was installed in October 2013. [19] [20] [21]

In 1926, the New Delhi railway station opened to serve the new imperial capital. Before the capital was founded in 1911, the Old Delhi Railway Station served the city. The Agra-Delhi railway line ran through Lutyens' Delhi, known for its India Gate war memorial and the Rajpath, but was moved to the Yamuna river and opened in 1924 to make way for the new capital. The Minto (Shivaji) and Hardinge (Tilak) rail bridges were built for the rerouting.

The East Indian Railway Company, who oversaw railways in the region, sanctioned the construction of a single-story building with one platform between Ajmeri Gate and Paharganj in 1926; this was later known as New Delhi railway station. Government plans to have the station built inside the Central Park of Connaught Place were rejected by the rail company as impractical. [22]

Work continued after the station opened, and the New Delhi Capital works project to construct 4.79 miles (7.71 km) of new lines was completed in 1927 and 1928. The viceroy and royal retinue entered the city through the new station during the 1931 New Delhi inauguration. New structures were added to the station, and the original building became the parcel office. [23] [24]

On 5 November 1951, the Jodhpur–Bikaner line was merged with the Western Railway. [25] Construction began to convert its metre gauge to 1,676 mm (5 ft 6 in) broad gauge and build a link to Phulera, [26] and it was the Jodhpur–Merta City–Bikaner– Bathinda line by 2008. [27] On April 14, 1952, the Northern Railway zone was created with the merger of the Jodhpur State, Bikaner State and Eastern Punjab Railways and three East Indian Railway divisions northwest of Mughalsarai, Uttar Pradesh.

In 1976-77, the Ghaziabad-Nizamuddin-New Delhi-Delhi line was electrified. [28] On 1 July 1987, the Ambala railway division was created when 639 km of tracks were transferred from the Delhi Division and 348 km were transferred from the Firozpur Division; it became operational on 15 August 1988. Sixty-two percent of the division is in Punjab, with the rest in Haryana, Himachal Pradesh, Uttar Pradesh, Rajasthan and Chandigarh. The division has 141 stations, including the World Heritage Site Kalka Shimla Railway. [29]

Electrification continued during the 1990s, and the Sabjimandi-Karnal sector was electrified between 1992 and 1995. [30] The Ambala-Chandigarh sector was electrified in 1998 and 1999 [31] and was followed by Chandigarh-Kalka, electrified in 1999 and 2000. [31]

Before December 1994, the Delhi-Rewari line had double metre-gauge tracks; that year, one track was converted to broad gauge as part of the Ajmer-Delhi line conversion. [32] Both tracks between the Sarai Rohilla and Delhi railway stations were converted to broad gauge within a few years, and metre-gauge trains stopped operating from the Delhi station. [33]

21st century

The North Western Railway zone was created on 1 October 2002, [34] followed by the North Central Railway zone on 1 April 2003. The second metre-gauge track from Sarai Rohilla to Rewari was converted to broad gauge by September 2006, and metre-gauge trains stopped operating between the stations; the converted track opened for public use in October 2007. [33] [35] Broad-gauge conversions were adjusted for the Bikaner–Rewari line between 2008 and 2011, [13] and for the metre-gauge Hisar-Sadulpur section in 2009. [13] [36]

A 104-km survey for the Panipat–Meerut line was part of the 2010–11 rail budget. The project, costing 948 crore, was approved in the 2017-18 budget. [37] New lines were built and opened in 2013. The Chandigarh–Sahnewal line (also known as the Ludhiana-Chandigarh rail link) was inaugurated, [38] the broad-gauge, electrified Rewari–Rohtak line was built, [39] and the foundation stone for the shifting of a section of the Rohtak-Gohana-Panipat line was laid. [40]

A re-survey of the Yamunanagar–Chandigarh line, costing ₹25 crore, was part of the 2016–17 rail budget. The total cost of the project was 875 crore. [37] In the 2017-18 rail budget, Indian Railways approved the Panipat-Jind line and Panipat-Rohtak line electrification plans costing 980 core. A Panipat-Shamli-Baghpat-Meerut line was approved for 2,200 crore.

By December 2017, 6,095 GPS-enabled Fog Pilot Assistance System railway-signaling devices had been installed in the Northern, North Central, North Eastern and North Western Railway zones. The devices ended the practice of putting firecrackers on train tracks to alert train drivers to reduce speed; the location of signals, level-crossing gates and other such markers is known in advance. [41] The Rewari Railway Heritage Museum, built in 1893, is India's only surviving steam locomotive shed.

Network

Haryana Space Applications Centre, Hisar (HARSAC) has produced the state's railway map, and its lines are included in the rail "pink book". [42] [43] [44]

Divisions and workshops

Haryana has five divisions in three rail zones, and each division has its own workshops.

Lines

Projects

Current

Undertaken by IR and "Rail Infrastructure Development Company (Haryana) Limited" (H-RIDE, also called Haryana Rail Infrastructure Development Corporation).

  • Announced projects (planned and/or being executed, c. Jan 2018)
    Feasibility study survey was completed for the first 7 projects in 10 months from Jan 1, 2018 - Oct 31, 2018. [59]
  • Yamunanagar-Adi Badri-Paonta Sahib-Dehradun line, via Bilaspur, connecting to Chota Char Dham Railway is proposed for future implementation, yet unapproved and an un-surveyed project.
  • Delhi-Sohna-Nuh-Ferozpur Zhirka-Alwar line [59] 104 km link sent to planning commission in 2013 [61] MoU was signed in 2015 [62] , and is included in 2018 pink book. [63] Additional budget was allocated in 2019-20 union railway budget. [60]
  • Kaithal-Patiala line, survey was announced in 2016-17 budget and completed in January 2019. Pending railway board approval for inclusion in the pink book as of Jan 2019. [64]
  • Bhiwani-Loharu line via Kairu-Jui [59] MoU was signed in 2015 and H-RIDE will undertake Bhiwani-Loharu section to connect it to the existing Loharu-Pilani-Jhunjhunu railway link. [65] Additional budget was allocated in 2019-20 union railway budget. [60] Note, Jaipur-Reengas-Churu line was surveyed in 2015-2016. [65]
  • Narwana-Hisar line, 65 km, survey commenced in 2018, [66] direct and shortest route via Narnaund [59]
  • Ukalana-Narwana line 29 km, previously announced connection for direct connectivity to Kurukshetra and Chandigarh [67]
  • Hansi-Jind line 45 km via Narnaund, previously announced complementary connection [67] Additional budget was allocated for Jind-Hisar line in 2019-20 union railway budget. [60]
  • Farrukhnagar-Jhajjar-Charkhi Dadri line, 72 km, [59] Bijwasan-Jhajjar-Charki Dadri was surveyed in 2010, [62] and the next stage survey commenced in 2018, [66] but conducted in 2015. [68] Additional budget was allocated in 2019-20 union railway budget. [60] Extend this along new Charkhi Dadri-Jui-Kairu-Isharwal-Jhunpa route.
  • Jhajjar-Palwal line 95 km including Jhajjar- Farukh Nagar new 30 km link and Patli- Sohna- Manesar- Asaoti( Palwal) new 60 km link along Western Peripheral Expressway was approved by the Haryana government in December 2018 and approval from the railway board is expected shortly. [69] Extend it further to Noida International Airport, Jewar.
  • Note: Hisar-Rajgarh link exists. Survey for Rajgarh-Taranagar-Sardarshar line and Sardarshar-Bhadra-Sirsa line was completed in 2015-16 [65] km [65]
  • Hisar Airport rail line: Existing Hisar-Jakhal line will be extended to Hisar airport as integrated transport hub, DPR will be ready soon (dec 2018 update. [70]
  • Chandigarh(Kalka)- Baddi line, 23.33 km route included in 2018 NR pink book. [63] Preliminary engineering-cum-traffic surveyed in 2010. [71] LOA signed, state released 175 crore, 22 hectares land acquisition in progress (c. Nov 2017). [72] IMT and fruit logistics hub at former HMT site in Pinjore.
  • Announced projects (planned and/or being executed, c. Feb 2015)
  • Previously surveyed (2010) [71]
  • Kaithal-Pundri-Karnal line, 92 km surveyed in 2010 [71]
  • Patiala-Samana-Jakhal-Narwana line, 93 km surveyed in 2010 [71]
  • Bahadurgarh-Jhajjar line, 40 km surveyed in 2010 [71]
  • Yamunanagar-Kurukshetra-Patiala line, 174 km surveyed in 2010 [71]
  • Rajgarh-Taranagar-Sardarshar line survey completed in 2015-16, [65] as well as 100 km Sardarshar-Bhadra-Sirsa line. [65] Sardarshar-Loonkaransar survey (to connect to mahajan firing range and Bikaner) was completed in 2014. Hisar-Rajgarh and Jaipur-Reengas-Churu lines already exist. [65]
Under consideration projects

Under consideration for future inclusion, not yet approved, not yet surveyed:

  • Bilaspur-Paonta Sahib line (to connect proposed Chandigan-Yamunanagr line to Paonta Sahib), to connect to Chota Char Dham Railway
  • Jhumpa Khurd-Bahal-Loharu line, short distance, this missing link will complete railway across western Haryana from Sirsa to Narnaul
  • Jhumpa-Bhiwani line
  • Narnaul-Charki Dadri-Meham line, NE-SW diagonal across Haryana
  • Bhadra-Adampur-Fatehabad-Budhlada line to connect with already surveyed Sardarshahar-Sirsa line,
  • Hisar-Kanwari-Tosham-Kairu-Jui-Mahendragarh line, as western Haryana link
  • Charkhi Dadri- Jhumpa Khurd line
  • Charkhi Dadri-Loharu line
  • Yamunanagar-Indri-Karnal line,
  • Fatehabad-Uklana line (to connect with proposed Uklana-Narwana line), for direct link across north Haryana from Sirsa to Chandigarh
  • Jind-Barwala-Agroha-Adampur line,
  • Karnal-Jind-Hansi-Kanwari-Tosham-Jhumpa line, note that Kaithal-Pundri-Karnal line (also needs further new link to Patra-Sangrur-Barnala-Faridkot) was surveyed in 2010 [71]
  • Karnal-Deoband line, Mujaffarnagar-Deoband-Roorkee line is under construction which will connect Haryana to Haridwar
  • Mujaffarnagar-Shamli-Panipat line, Mujaffarnagar-Deoband-Roorkee line is under construction which will connect Haryana to Haridwar
  • Meerut-Sonipat line
  • Hisar-Anupgarh line via Balsamand-Bhadra-Nohar-Ryanwali-Anupgarh route
  • Bawanikhera-Mahajan line via Gohana-Meham-Bawanikhera-Kanwari-Tosham-Siwani-Sahwa-Pallu-Mahajan-Anupgarh route
  • Mandkola-Dhaulpur line via Mandkola-Hathin-Uttawar-Punhana-Barsana-Govardhan-Deeg-Bharatpur-Dhaulpur route from where it connects to existing Delhi-Dhaulpur-Gwalior-Nagpur route. Also provides alternate route to Agra and Mathura. [75]
Under construction projects

Pink book projects under construction as per live map in the citation: [76]

  • Hisar-Hansi-Rohtak line, Rohtak-Meham under construction with all land in possession of IR and will be completed by June 2019, and Hansi-Hisar tender planning was underway in Nov 2017. [72]
  • Palwal-Firozepure Jhirka-Alwar line, via Palwal-Mandkola-Nuh-Bhadas-Firozepure Jhirka-Ootwar-Alwar, as per pink book. [76]
NCR projects


  • Hisar as CMG links
  • Hisar-Patiala rail link: exists (a) Ukalana-Narwana link and Kaithal-CheekaGuhla-Samana link in Haryana or (b) Jakhal/Moonak-Patra-Samana link in Punjab as an alternate route
  • Hisar-Karnal-Ambala rail link: Missing links are (a) Uklana-Narwana link and Kaithal-Pundri-Karnal link (b) Hansi-Jind link (under survey) and (c) Jind-Karnal link
  • Hisar-Gwaliar rail link: exists except Bhopal-Beora-Ramganj-Jhalawar link which is being implementation and tenders were issued in 2014 [78] [79]
  • Hisar-Jaipur-Kota-Bhopal rail link: exists except Bhopal-Beora-Ramganj-Jhalawar link which is being implementation and tenders were issued in 2014 [78] [79]


  • Karnal and Ambala as CMG links (includes Patiala as CMG links)
  • Karnal-Dehradun rail link: Karnal-Yamunanagar missing links is under survey
  • Karnal-Bareilly rail link: Under survey Karnal-Yamunanagar links willprovide indirect route, the direct link Karnal-Shamli-Muzaffarnagar-Bijnor-Shahspur is missing, needs approval and will be of strategic importance to Rajasthan-Pithoragarh (Pakistan to China border) army movement, it will also directly connect Mahabharta religious city of Kurukshetra with the Char Dham rail network
  • Karnal-Jaipur rail link exists via Rohtak-Rewari-Alwar
  • Karnal-Kota rail link exists via Jaipur except the under-construction rail link from Jhalawar to Bhopal (see Hisar Kota link link)


  • Gwaliar as CMG links (concludes Bareilly and Kanpur as CMG)
  • All exist. There is existing Gwaliar-Jhansi-Kanpur line, Gwaliar-Agra-Breilly line and Kanpur-Unnao-Bareilly line.
Other future projects of interest

This is live rail map in citation. [76]

Himachal Pradesh
  • New rail links in Himachal Pradesh
    • Nangal Dam- Talwara line, 83.74 km route included in 2018 pink book. [63]
    • Banopli- Bilaspur-Beri line, 63.1 km route included in 2018 pink book. [63]
      • Chadigarh(Kalka)-Baddi line, 33.23 km route included in 2018 pink book, [63] under construction.
    • Una- Hamirpur line, 50 km route included in 2018 pink book. [63]
  • New rail links from Himchal Pradesh to J&K
  • New rail links from Himachal Pradesh to Uttrakhand
Punjab
  • New rail links in Punjab near Haryana Border
    • Abohar-Fazilka line, 42.717 km route included in 2018 pink book. [63]
    • Chandigarh- Ludhiana line, 112 km route included in 2018 pink book. [63]
  • New rail links from Punjab to Himachal Pradesh
  • New rail links to J&K
  • New rail links from Punjab to Pakistan
Rajasthan
  • Bhatinda-Dabwali-Hanumangarh-Pilibangan-Suratgarh line is operational [80] and electrification work commenced in 2018-19 at the cost of INR350 crore. [81]
  • New rail links in Rajasthan near Haryana Border
    • Sardarshahar
      • Lunkaransar-Sardarshar-Taranagar-Sadulpur (Rajgarh) link
        • Sardarshar-Lunkaransar line (82 km) survey was announced in 2013 to connect existing end points for strategic military requirements. [82] In 2015 budget, additional INR9 lakh allocated for survey work by Railway minister. [83]
        • Sardarshar-Taranagar-Sadulpur (Rajgarh) line (100 km) survey was announced in 2015 to connect existing end points. [83]
      • Sardarshahar-Nohar-Sirsa line via Jingana-GudianaKhera-Arniawali-Bajekan (94 km) survey was announced in 2013 and cost estimates were prepared. [84] In 2015 budget, additional INR14 lakh allocated for survey work by Railway minister. [83]
      • Sardarshahar-Suratgarh-Gajsinghpur line (115 km) survey was announced in 2015. [85] [83]
    • Gajsinghpur (Pak border)-Padampur-Goluwala-Pilibanga-Rawatsar-Sahawa-Taranagar-Daderwa-Sadulpur(Rajgarh) line survey was announced in 2013 to connect existing end points for strategic military requirements [82] In 2015 budget, additional INR44 lakh allocated for survey work by Railway minister. [83]
    • NeemKaThana(on Delhi-Rewari-Jaipur line)-Sikar-Salasar-Sujangarh line (150 km) survey was announced in 2013, [86]
    • Alwar-Behror-Narnaul-Charkhi Dadri line survey was announced in 2013 was pending approval for the financial vetting in 2015. [87] No budget was allocated in 2015. Should be extended to Nokha-Phalodi (to Bikaner).
    • Dausa- Gangapur line, 92.67 km route is included in 2018 NCR pink book. [88] Will provide direct Delhi-Faridabad-Alwar-Dausa-Kota-Gwalior access by bypassing aipur on its west.
    • Ratlam- Banswara- Dungarpur line, 176.47 km route is included in 2018 NCR pink book. [88]
    • Gauge conversion (all gauge conversion across India will be completed by March 2022)
  • New rail links from Rajasthan to Madhya Pradesh
    • Jhalawar-Biaora-Bhopal line tender was issued in 2014 for construction. [89]
    • Gauge conversion (all gauge conversion across India will be completed by March 2022)
      • Jaipur-Bhopal existing link: Gwaliar- Sheopur- Kota line gauge conversion of 284 km route is included in 2018 NCR pink book. [90]
      • Agra-Kota-Ujjain-Khandwa-Akola-Washim existing link: Gangapur, Sawai Madhopur Dhaulpur-Sirmuttra- Gangapur line gauge conversion of 144.6 km route is included in 2018 NCR pink book. [90]
  • New rail links from Rajasthan to Gujrat and Maharashtra
UP
  • New rail links in UP near Haryana Border
    • Karnal-Haridwar: Deoband- Roorkee line, 27.45 km route included in 2018 pink book, [63] Karnal to Deoband is the missing link.
    • Mathura- Vrindavan line, 11 km route is included in 2018 NCR pink book. [90]
  • New rail links from UP to Nepal
Uttrakhand
NCR CMG connectivity
  • Complimentary NCR CMG (counter Magnet City) Interconnectivity NH (National Highways) projects
    • From Hisar:
      • Hisar-Jaipur: Hisar-Kaimri-Isharwal and Gokulpura-RampuraBeri-Pilani and Chirawa-Chanana-Ponkh-Chala(or Neem Ka Thana) are missing links
      • Hisar-kota: Ponkh-Khatu-Renwal and Jobner-Mahlan-Shankarpura-Choru-Chosla, Chandser (NH16)-Tordi(NH37A) and Todraisingh-Botunda-NH52(Deoli) are missing links
      • Hisar-Patiala: Barwala-Surbara-Narwana, Hatho-Kolekhan-Guhna-Attela-Bhuna-Cheeka-Panjola is the missing link
      • Hisar-Ambala: Barwala-Uchana-Titram Kaithal the missing link
      • Hisar-Karnal: NH9-Dhansu-Chanot-Masudpur-Narnaund is missing link (newly constructed SH/MDR can be converted to NH)
      • Hisar-Dehradun: NH8-Newal-Gangoh(needs new Yamuna bridge)-Ambheta-Saharanpur
      • Hisar-Bareilly: Barfeilly-Chandausi-Pawasa-Dhawarsi-Siyana-Kuchesar-Babugarh-Hapur(new northern bypass), Rasoolpur Dhaulri-Doula(NH334B)-Goripur and SOnepat-Farmanah-LakhanMajra-Bass-BhatolJattan-Pal-ki-Dhani(NH12)-Bhatla(NH17)-Niyana-Shikarpur-NH9 (Radha Soami Satsang Beas Hisar-1) are missing direct link
      • Hisar-Kanpur: Kanpur(NH19)-Rura-Dibiyapur(NH234)-Bakewar, Rewari-Tupkara-Nuh-Ujina-Hodal, Mandola-Kosli-Palhawas-Pataudi-Taoru, Dohki(NH17)-Rajgarh(NH709)-Dinod-Tosham(NH17)-Kanwari-Hisar are missing link
      • Hisar-Gwalior: Kanina(NH24)-Palri(NH17)-Jui(NH709)-Kairu(NH12)-Isharwal(NH12)is missing link
      • HisarAirport-Delhi Airport: Hisar-Kanwari-Tigrana-Bamla-Matenhail-Bhindawas-Silana(NH35)-Kiloi(NH15A)-Badli-IGI Airport GREENFIELD EXPRESSWAY is missing link (under plan?) Take note of greenfield and direct route alignment that also connects unconnected Tehsils and various Bird Sanctuaries in Matenhail, Bindhawas, Khaparwas, Macchrauli, etc.
    • From Karnal (includes Ambala and Patiala):
      • Ambala-Jaipur-kota: Ambala-Rehra-CharkhiDadri greenfield NH route has been announced as NH and industrial corridor, Nizampur(Narnaul)-Patan-Shahpur is the missing link
    • Ambala-Dehradun:
      • Ambala-Bareilly: Shamli-Khatoli-Hastinapur-Joya-Kindarki-Shahbad-Bareilly is missing NH link
      • Ambala-Kanpur: Samalkha-Baraut-Hapur-Meerut-Kahangirabad-Dibai-Bahediya-Aliganj-Chibbramau-Talgram-Kakaaan-Shivli-Kanpur
      • Ambala-Gwalior: Nih-Ujina-Uttawar-Punhana-Kaman is missing link
      • Kaithal-Pundri-Karnal
      • Karnal-Haridwar: Deoband- Roorkee line, 27.45 km route included in 2018 pink book, [63] Karnal to Deoband is the missing link.


    • From Barilly:
      • Barilly-Jaipur-Kota: Sirmathura-Mandrayal-Chancheri-Khandar-NJ30-to-Khatoli
      • Barilly-Dehradun: Rampur-Dilari-Sahaspur and Nagina-Nazibabad-Roorkee are missing link
      • Barilly-Kanpur: Farukhabad-Pihan-Sauna-Rapra-Pravea-HarodiaBholapur-Kandharpur
      • Barilly-Gwalior: Badaun-Ganj Dundwara-Sakot-Shikohabad-Porsa-Pariksha-Gwalior is missing NH link


    • From Kanpur:
      • Kanpur-Jaipur-Kota: Fatehabad (Agra)-Khairgrah-Uchena is missing link
      • Kanpur—Kota: Hwaliar-Tentara and Lakshmanpura-Sheopur are missing link
      • Kanpur-Gwalior: Kuthond-Madhogarh-Mihona-Mau is missing link

National freight corridors

Diamond Quadrilateral High-speed rail network, [1] Eastern Dedicated Freight Corridor (72 km) [2] and Western Dedicated Freight Corridor (177 km) [3] pass through Haryana.

Special rail

UNESCO Heritage rails
Tourist circuit rail

Sri Krishna circuit on Vrindavan-Mathura-Govardhan-Barsana-Kurukshetra route and Hemu heritage circuit on Delhi-Rewari-Madhogarh-Panipat route. [91] Other potential circuits are Prithviraj circuit on Faridabad(Surajkund)- Taraori- Asigarh Fort(Hansi)-Hisar-Tosham route, Haryana Buddha circuit on Hisar(ashoka pillar in mosque in Firoz Shah Palace Complex)- Agroha Mound-Fatehabad(Ashoka lat in mosque)-Kurukshetra(Buddha satupa on main sarovar)-Topra-Sugh-Chaneti.

Luxury rail

Luxury rail in Haryana are the Delhi-Rewari Fairy Queen Heritage Train and the proposed Delhi-Rewari-Madhogarh Heritage Rail Circuit. [91]

High-speed rail

Semi-High Speed rail: 160-200 km

Delhi-Agra and Delhi-Chandigarh routes will be converted to the average speed of 160–200 km per hour. [92] [93] The project was conceived in 2014.

Delhi-Chandigarh semi high speed rail corridor with 200 km/h via Ambala Cantt and Panipat will commence construction work in 2019. Cost of this corridor 11,218 crore.

Rapid Rail Transport System (RRTS)

The under-construction Delhi-Alwar RRTS and Delhi-Sonepat-Panipat RRTS will pass through Haryana. In 2017 December, National Capital Region Transport Corporation signed agreements with Administrador de Infraestructuras Ferroviarias (Spain's state-owned company) and Société nationale des chemins de fer français (France's state-owned company) to cooperate on the development of rapid rail smart projects, including Delhi-Meerut Smart Line, Delhi-Panipat Smart Line and Delhi-Alwar Smart Line have been prioritized for implementation in the first phase of NCR RRTS where these three lines will operate from Sarai Kale Khan in Delhi. Designed with 180 km/h design speed, 160 km/h operational speed, and 100 km/h average speed, of six-car trains carrying 1,154 passengers running every 5 to 10 minutes on either underground or elevated point-to-point tracks where passengers will not have to change trains. 35-40% funding will be equity from Centre and state governments and the remaining 60% will come from multilateral funding agencies. [94] [95] [96]

  • Delhi-Alwar RRTS: Delhi-Alwar line will have 19 stations, 9 underground stations from ISBT Kashmere Gate to Kherki Daula and 10 elevated stations on 124.5 km route. [96]
  • Delhi-Sonipat RRTS: INR 30,000 crore Delhi-Panipat Smart Line and 180.5 km will cost around Rs 37,539 crore Delhi-Alwar Smart Line are awaiting DPR approval, construction to commence by the end of 2018 and completed before 2025. Cost of this corridor is 30,000 crore. At four major stops in Panipat: Panipat Depot, Panipat North, Panipat South and Samalkha.
  • Delhi-Rohtak-Hisar RRTS

High Speed 200-500 km/h rail

Delhi-Mumbai high-speed rail and Delhi–Amritsar high-speed rail of Diamond Quadrilateral High-speed rail network via Sohna- Rewari- Narnaul will pass through Haryana. [1] The Ministry of Railways has established the National High-Speed Rail Corporation Limited as a government company on February 12, 2016, to promote high-speed rail corridors. [97] The Indian Ministry of Railways' white-paper "Vision 2020", envisages the implementation of regional high-speed rail projects to provide services at 250–350 km/h, and planning for corridors connecting commercial, tourist, and pilgrimage hubs. Six corridors have been identified for technical studies on setting up of high-speed elevated rail corridors, including the following 2 passing through Haryana: [98]

  • DelhiChandigarhAmritsar: This 458 km corridor costing 1 lakh crore has been approved by the railway board and construction will commence in year 2020. The route alignment is Delhi-Panipat-Ambala-Chandigarh-Ludhiana-Jalandhar-Amritsar
  • Delhi- Agra- Lucknow- Varanasi- Patna

Personal Rail Transport (PRT) Metrino

Dhaula Kuan-Gurugram- Manesar Personal rapid transit, also called Metrino, was initiated in Dec 2017 by the Government of India by inviting fresh expression of interest from the providers. [99]

Metro train

Current

Proposed

  • Chandigarh and Panchkula: Chandigarh Metro (proposed)
  • Sonipat Metro - extension Red Line (Delhi Metro):
    In June 2017, the Government of Haryana's cabinet approved the investment of INR 968.20 (US$150 million), as its share on the 80:20 equity ratio with the union government, for the 4.86 kilometres (3.02 mi) extension of Delhi Metro from the existing Rithala metro station to Sonipat via Bawana with three elevated stations at Sector 5 of Narela in Delhi, on Delhi border at Kundli Industrial Area and Nathupur Industrial Area in Sonipat, which are planned to be built starting from April 2018 and to be completed by March 2022 as part of the Phase IV. [100] There are plans to further extend this line deeper into the Sonipat city (via Rajiv Gandhi Education City) and beyond to Murthal ( Deenbandhu Chhotu Ram University of Science and Technology) in the future.
  • Bahadurgarh Metro - Green Line extension:
    An extension of Green Line from Mundka along the NH 9 will under construction and on schedule to be completed by December 2017 (as of June 2017). [101]
  • Rohtak Metro - Green Line extension:
    An extension of Green Line from Bahadurgarh, proposed only and not yet approved as of July 2017. [102]
  • Kharkhoda Metro - Red Line extension:
    From the existing Rithala metro station to the new stations in Rohini and Bawana industrial area, to Kharkhoda in Haryana, and up to Rohtak via Sisana as second line to Rohtak. As of July 2017, proposed only and not yet approved.
  • Jhajjar Metro - Blue Line extension:
    from existing Blue line to Najafgarh and Kharkari in Delhi to Badli in Haryana on Jhajjar border (not to be confused with Badli Industrial area of Delhi in Sonipat border) and Jhajjar city in Haryana. As of July 2017, proposed only and not yet approved. [103]
  • Dwarka - AIIMS Bhadsa - Farukh Nagar - Gurugram Blue Line extension:
    from the existing Blue line at Dwarka to AIIMS Jhajjar at Badsha, Farukh Nagar and Gurugram in Haryana. As of July 2017, proposed only and not yet approved. [103]
  • Dwarka-Gurugram - Blue Line and Orange Line Airport Express extension:
    As second connection via Kapashera and Bijwasan on Haryana border. [104] To complete the metro ring around Gurugram, a proposal was prepared in November 2017 for the two missing routes, [105]
    (a) for Blue Line (Delhi Metro) "HUDA City Centre metro station" to Dwarka Sector 21 metro station (via Sector-45, Sector-46, Sector-47, Subhash Chawk, Bahrampur, Hero Honda Cross, Udhyog Vihar-6, Sector-37 Pataudi road, Sector-10 Basai road, Sector-9 Dhankot railway station, Sector-7, HUDA Road, Sector-4/5, Ashok Vihar, Palam Vihar, Palam Vihar Sector-1, Palam Vihar Sector-23, Sector-111, Bijwasan border, Bijwasan railway station and Barthal),
    (b) from HUDA City Centre metro station to Gurgaon railway station (via Sector-45, Sector-46, Sector-47, Subhash Chawk, Rajiv Chawk, HUDA road and Sector-4/5).
  • Gurugram - Manesar Yellow Line extension:
    An extension of the existing yellow line at Gurugram to Manesar Industrial township in the west. In May 2017, a joint study by HUDA and Haryana Town and Planning found the proposal to be technically and financially viable and Detailed Project Report is being prepared for the approval. [102]
  • Balramgrah (Faridabad) - Palwal Violet Line extension:
    From existing Balramgarh (Ballabhgarh) to Palwal district headquarters. As of July 2017, proposed only and not yet approved. [102]

Multimodel transit centres (MMTC)

Five multimodel transit centres are being built, each one along the Delhi Western Peripheral Expressway (WPE) in the vicinity of railway stations, metro, RRTS and major national highways. These MMTCs will be located at: [106]

  • Sonipat: Kundli MMTS between Rajiv Gandhi Education City RRTS station and WPE interchange,
  • Bahadurgarh MMTS between Bahadurgarh bus stand and metro station,
  • Ballabhgarh MMTS between Ballabhgarh Metro Station, bus stand and railway station,
  • Panchagaon Chowk MMTS between proposed metro station and Gurugram RRTS station, and
  • Kherki Daula MMTS near proposed metro station and Delhi-Alwar RRTS station and bus stand on the junction of Chhapra and Naihati villages.

Multimodel logistics hubs

Issues

Multiple issues include the lack of progress on announced projects, lack of comprehensive long-term transport needs analysis and planning, lack of funding, lack of connectivity, lack of integration with multimodal transport, lack of effective utilization of existing infrastructure such as integrated logistics and industrial hubs, land acquisition, etc. [108] [109] [110] [111]

See also

References

  1. ^ a b c Address by The President of India to the Joint sitting of Parliament 2014 (PDF), archived from the original (PDF) on 14 July 2014
  2. ^ a b "Eastern DFC". Archived from the original on 26 November 2017. Retrieved 4 December 2017.
  3. ^ a b "Western DFC". Archived from the original on 3 December 2017. Retrieved 4 December 2017.
  4. ^ Asiatradehub.com.com. "India – Infrastructure Railways". Archived from the original on 16 October 2008. Retrieved 23 January 2018.
  5. ^ a b "Delhi District: Trade and communications". The Imperial Gazetteer of India, Vol. 11. Oxford at Clarendon Press. 1909. p. 229.
  6. ^ "IR History: Early History (1832-1869)". IRFCA. Retrieved 28 June 2013.
  7. ^ R. P. Saxena. "Indian Railway History Time line". Irse.bravehost.com. Archived from the original on 29 February 2012. Retrieved 24 January 2014.
  8. ^ "Gazetteer of India, Haryana, Hisar" (PDF). Haryana Government. Communications, page 135. Archived from the original (PDF) on 1 May 2014. Retrieved 10 May 2014.
  9. ^ "Rajputana Malwa State Railway". fibis. Retrieved 10 May 2014.
  10. ^ "IR History: Early Days II (1870-1899)". Retrieved 26 February 2014.
  11. ^ "Chapter VII Communications". Archived from the original on 23 February 2014. Retrieved 26 February 2014.
  12. ^ "Chapter VII Communications". Archived from the original on 23 February 2014. Retrieved 1 March 2014.
  13. ^ a b c d e "Overview of Bikaner Division" (PDF). North Western Railway. Archived from the original (PDF) on 8 May 2014. Retrieved 7 May 2014.
  14. ^ "IR History: Early Days II (1870-1899)". Retrieved 7 March 2014.
  15. ^ "Engineer" journal article, circa 1915, reprinted in Narrow Gauge & Industrial Railway Modelling Review, no. 75, July 2008
  16. ^ "Jodhpur-Bikaner Railway". fibis. Archived from the original on 2 February 2014. Retrieved 10 May 2014.
  17. ^ "IR History: Part II (1870-1899)". IRFCA. Retrieved 10 May 2014.
  18. ^ "Railway line along Indian border". Press Information Bureau, Govt. of India, 21 April 2008. Retrieved 10 May 2014.
  19. ^ "Gandhi's statue damaged in Palwal : The Tribune India".
  20. ^ EMU rams into train near Palwal, driver dies
  21. ^ Chauhan, Arvind (29 October 2015). "India's fastest train Gatimaan Express to become operational by March 2016" – via The Economic Times - The Times of India.
  22. ^ "CP's blueprint: Bath's Crescent". Hindustan Times. 8 February 2011. Archived from the original on 3 January 2013.
  23. ^ "A fine balance of luxury and care". Hindustan Times. 21 July 2011. Archived from the original on 14 December 2014.
  24. ^ "When Railways nearly derailed New Delhi". Hindustan Times. 18 January 2011. Archived from the original on 26 September 2013.
  25. ^ "Western railway history".
  26. ^ "Written answers to Question asked in Parliament". Railway expansion programme in Rajasthan. Government of India. Archived from the original on 8 May 2014. Retrieved 7 May 2014.
  27. ^ "Railway line along Indian border". Press Information Bureau, Govt. of India, 21 April 2008. Retrieved 7 May 2014.
  28. ^ "History of Electrification". IRFCA. Retrieved 28 June 2013.
  29. ^ a b c Ambala Division map and history.
  30. ^ "History of Electrification". IRFCA. Retrieved 3 March 2014.
  31. ^ a b "History of Electrification". IRFCA. Retrieved 21 February 2014.
  32. ^ "[IRFCA] Indian Railways FAQ - IR History - 1970 - 1994". www.irfca.org.
  33. ^ a b Press Information Bureau English Releases
  34. ^ "North Western railway history". Archived from the original on 4 March 2016.
  35. ^ "Delhi-Haryana rail link gets better". The Hindu. 8 October 2007. Archived from the original on 13 October 2007.
  36. ^ "Bathinda–Rewari line route map". India Rail Info.
  37. ^ a b Haryana gets much less than expected in rail budget, Jagran, 25 February 2016.
  38. ^ "New Rail Link". The Tribune, 19 April 2013. Retrieved 21 February 2014.
  39. ^ "Haryana gets first functional railway line after 33 years". Business Standard, 7 January 2013. Retrieved 26 February 2014.
  40. ^ "Minister for Railways Sh. Mallikarjun Kharge lays the foundation stones of 'Rohtak-Meham-Hansi new line and shifting of Rohtak-Makrauli section of Rohtak-Gohana-Panipat section today". Northern Railway. Retrieved 3 March 2014.
  41. ^ Indian Railways to use GPS-enabled devices to fight fog this season, Economic Times, 12 Dec 2017.
  42. ^ Multi-model transport network map of Haryana, Haryana Space Applications Centre, Hisar.
  43. ^ Railway network of Haryana, HARSAC.
  44. ^ Pink book, Indian Railway.
  45. ^ a b Bikaner Division map and history
  46. ^ "infra".
  47. ^ "NWR railway Bikaner division slidings" (PDF).
  48. ^ "North Western Railway / Indian Railways Portal". nwr.indianrailways.gov.in.
  49. ^ a b Jaipur division network map
  50. ^ a b Delhi division map and history
  51. ^ a b "Zones and their Divisions in Indian Railways" (PDF). Indian Railways. Archived from the original (PDF) on 19 March 2015. Retrieved 13 January 2016.
  52. ^ a b "Ambala Railway Division". Railway Board. Northern Railway zone. Retrieved 13 January 2016.
  53. ^ "Statement showing Category-wise No.of stations in IR based on Pass. earning of 2011" (PDF). Archived from the original (PDF) on 28 January 2016. Retrieved 15 January 2016.
  54. ^ a b "PASSENGER AMENITIES - CRITERIA= For Categorisation Of Stations" (PDF). Archived from the original (PDF) on 4 March 2016. Retrieved 15 January 2016.
  55. ^ Kalka workshop
  56. ^ a b "North Central Railways / Indian Railways Portal". ncr.indianrailways.gov.in.
  57. ^ a b "North Central Railways / Indian Railways Portal". www.ncr.indianrailways.gov.in. Retrieved 4 December 2017.
  58. ^ Rly Min gives approval for accelerated speed rail route between Delhi and Hisar, United News, 29 Dec 2017.
  59. ^ a b c d e f g h 7 new projects announced, India Today, 26 January 2018.
  60. ^ a b c d e f New rail projects will get speed in Haryana, Amar Ujala, 3 Feb 2019.
  61. ^ a b c Three railway line projects for Haryana, state government will give 50%: Hooda, Times of India, 28 July 2013.
  62. ^ a b c d e f g h Haryana, Railways for speedy implementation of projects, The Hindu, 1 Feb 2015.
  63. ^ a b c d e f g h i j k l m n o p Northern Railway Pink Book 2018.
  64. ^ Patiala-Kaithal rail line survey complete, Amar Ujala, 1 Feb 2019.
  65. ^ a b c d e f g Rajasthan gets more railines to Haryana and Punjab, Rajasthan Patrika.
  66. ^ a b Haryana Samvad Archived 29 November 2018 at the Wayback Machine, Oct 2018.
  67. ^ a b Hisar MP meets railway minister, seeks more train for his constituency, Times of India, 4 Feb 2017.
  68. ^ State got several railway projects, The Tribune, Feb 2015.
  69. ^ Haryana clears railway link between Panipat and Palwal, awaits centre's nod, Times of India, Dec 2018.
  70. ^ Hissar airport will be connected directly to delhi from railline, Dainik Jagran, 25 Dec 2018.
  71. ^ a b c d e f g Survey of railway lines, Project Today, 2010.
  72. ^ a b NR current survey status 2017.
  73. ^ New raliline between Hissar to Sirsa in Haryana, Amar Ujala, 3 Feb 2019.
  74. ^ छह वर्ष बाद भी अलवर-चरखी दादरी रेलवे लाइन के सर्वे का इंतजार, Amar Ujala, 2017.
  75. ^ "Mandkola to Dholpur". Mandkola to Dholpur.
  76. ^ a b c "Runicha Express/14659 Train Running Status Merta Road/MTD to Phalodi/PLCJ - Railway Enquiry". indiarailinfo.com.
  77. ^ Meerut-Panipat railway line soon, Amar Ujala, 2016.
  78. ^ a b Bhopal-Ramganj rail link tender
  79. ^ a b "Ramganj Mandi to Bhopal". Ramganj Mandi to Bhopal.
  80. ^ "Bathinda to Suratgarh". Bathinda to Suratgarh.
  81. ^ Hisar-Bhatinda-SuratGarh electrification has commenced, Rajasthan Patrika, 2017.
  82. ^ a b "Gajsinghpur to Lunkaransar". Gajsinghpur to Lunkaransar.
  83. ^ a b c d e 4 new rail lines from Sardarshar being surveyed: Sardarshar-Taranagar-Sadulpur (Rajgarh) line, Sardarshar-Loonkaransar line, Sardarshar-Suratgarh-Gajsinghpur line and Sardarshar-Sirsa line.
  84. ^ "Sardarshahar to Sirsa". Sardarshahar to Sirsa.
  85. ^ "Sardarshahar to Gajsinghpur". Sardarshahar to Gajsinghpur.
  86. ^ 3 new surveys and additional budget for 4 previously planned surveys in 2015 budget announced by the Railway Minister Suresh Prabhu, 2015.
  87. ^ "Alwar to Charkhi Dadri". Alwar to Charkhi Dadri.
  88. ^ a b c d e "2018 NWR Pink Book" (PDF).
  89. ^ "Jhalawar to Bhopal". Jhalawar to Bhopal.
  90. ^ a b c 2018 NCR Pink Book.
  91. ^ a b Railway heritage theme park on the anvil at Rewari, Daijiworld, 19 Jan 2018.
  92. ^ "Railways completes pilot project for semi-high-speed train".
  93. ^ "Indian Railways To Launch Semi High Speed Bullet Trains On Three Routes". Archived from the original on 25 March 2016. Retrieved 18 December 2018.
  94. ^ India Spain cooperate in rail, 1 December 2017.
  95. ^ "On track: Direct trains on high-speed rail corridor to and from most NCR towns", Hindustan Times, 28 November 2017.
  96. ^ a b "High speed rail link by 2023 to cut journey time to 30 minutes at 100 km/h between Kashmere Gate and Gurgaon", The Economic Times, 23 April 2017.
  97. ^ "Welcome to HSRC". hsrc.in. Retrieved 20 July 2017.
  98. ^ "Indian Railways: Vision 2020" (PDF). Indian Railways. December 2009. Retrieved 29 November 2014.
  99. ^ Gadkari looking to launch India's first private rapid transit system from Dhaulan Kuan to Manesar, Hindustan Times, 19 Dec 2017.
  100. ^ Delhi Metro to be extended till Haryana's Sonepat Archived 29 July 2017 at the Wayback Machine, The Economic Times, 1 July 2017.
  101. ^ Delhi Metro's longest line: Majlis Park to Shiv Vihar set to open, Eturbo News, Juergen T Steinmetz, 6 June 2017.
  102. ^ a b c Expected PM Narendra Modi to announce Metro's extension to other parts of Haryana, says CM Bhupinder Hooda, DNA India News, September 2015.
  103. ^ a b AIIMS demands metro connectivity to its Jhajjar centre, Drug Today News, 14 May 2015.
  104. ^ Metro to connect HUDA City Centre station with Gurugram railway station , The Hindu, 4 May 2017.
  105. ^ "हुडा सिटी सेंटर से रेलवे स्टेशन व द्वारका तक मेट्रो चलाने की तैयारी.", Amar Ujala, 17 Nov 2017
  106. ^ Haryana govt to set up multi modal transit centres Outlook, 11 Jan 2018.
  107. ^ a b c d Dubai-based company keen on investing in state, The Tribune, 6 Dec 2017.
  108. ^ Critical Issues Related to Metro Rail Projects in India, 21 Dec 2017.
  109. ^ Double-lane rail track to miss another deadline, The Tribune, 12 July 2017.
  110. ^ Railway minister shows green light to pending projects in state, Times of India, 2 April 2015.
  111. ^ Now onus on states to ensure land transfer for rail projects , Indian Express, 15 Nov 2017.

External links


Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook