From Wikipedia, the free encyclopedia
Rabi Kounga
Country Gabon
Region Ogooué-Maritime Province
Offshore/onshoreonshore
Operator Royal Dutch Shell
Field history
Discovery1985
Start of production1989
Production
Estimated oil in place59 million tonnes
(~ 70×10^6 m3 or 440 million  bbl)

The Rabi Kounga oil field is an oil field located in Ogooué-Maritime Province. It was discovered in 1985 and developed by Royal Dutch Shell. It began production in 1989 and produces oil. The total proven reserves of the Rabi Kounga oil field are around 440 million barrels (59×106tonnes), and production is centered on 150,000 barrels per day (24,000 m3/d). [1]

Facilities

For access to the location, a single-runway airfield has been constructed. Flights go to (at least) Gamba and Port Gentil.

Around the airfield is a substantial accommodation and administration camp. By analogy with other Shell remote locations, this will contain some significant degree of trauma-treatment facility, at least sufficient to stabilise a patient while air evacuation is arranged.

There are several oil separating facilities in the area (the first stage of refining, degassing the oil prior to long-distance pipe transport), and an oil-export pipeline. (Destination is also probably Gamba, but this is not clear from publicly available sources. There are security concerns about publicising the routes of pipelines widely.)

See also

References

  1. ^ "Oil and Gas in Gabon". mbendi.com. 2010. Archived from the original on 2008-12-02. Retrieved 2013-06-04.


From Wikipedia, the free encyclopedia
Rabi Kounga
Country Gabon
Region Ogooué-Maritime Province
Offshore/onshoreonshore
Operator Royal Dutch Shell
Field history
Discovery1985
Start of production1989
Production
Estimated oil in place59 million tonnes
(~ 70×10^6 m3 or 440 million  bbl)

The Rabi Kounga oil field is an oil field located in Ogooué-Maritime Province. It was discovered in 1985 and developed by Royal Dutch Shell. It began production in 1989 and produces oil. The total proven reserves of the Rabi Kounga oil field are around 440 million barrels (59×106tonnes), and production is centered on 150,000 barrels per day (24,000 m3/d). [1]

Facilities

For access to the location, a single-runway airfield has been constructed. Flights go to (at least) Gamba and Port Gentil.

Around the airfield is a substantial accommodation and administration camp. By analogy with other Shell remote locations, this will contain some significant degree of trauma-treatment facility, at least sufficient to stabilise a patient while air evacuation is arranged.

There are several oil separating facilities in the area (the first stage of refining, degassing the oil prior to long-distance pipe transport), and an oil-export pipeline. (Destination is also probably Gamba, but this is not clear from publicly available sources. There are security concerns about publicising the routes of pipelines widely.)

See also

References

  1. ^ "Oil and Gas in Gabon". mbendi.com. 2010. Archived from the original on 2008-12-02. Retrieved 2013-06-04.



Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook