PhotosLocation


pioneer+trail+wind+farm Latitude and Longitude:

40°27′27″N 87°59′37″W / 40.45750°N 87.99361°W / 40.45750; -87.99361
From Wikipedia, the free encyclopedia
Pioneer Trail Wind Farm
CountryUSA
Coordinates 40°27′22.9″N 87°58′42.6″W / 40.456361°N 87.978500°W / 40.456361; -87.978500
StatusActive
Construction began2011
Owner(s)RWE
Operator(s)RWE
Wind farm
TypeOnshore
Hub height400 ft
Power generation
Units operational94 x 1.6 mW
Make and modelGE Renewable Energy
Storage capacity150.4 MW

The Pioneer Trail Wind Farm is a 94-turbine wind farm, established in 2011, in Ford County and Iroquois County in Illinois. [1] The wind farm is headquartered in the Ford County seat of Paxton. [2]

Detail

The Pioneer Trail complex's 94 wind turbines, each rated at 1.6 mW, can generate up to 150.4 megawatts of electricity. The northeastern Illinois project was developed by E.ON Climate Renewables, a subsidiary of E.ON, which merged with RWE in 2019. [1] [3] E.ON has resold some of the power generated by Pioneer Trail to the Southern Illinois Power Cooperative. [4]

The wind farm became operational in October 2011. [3]

References

  1. ^ a b "Pioneer Trail (USA)". thewindpower.net. The Windpower. Retrieved November 21, 2022.
  2. ^ "Pioneer Trail Wind Farm in Paxton, Illinois". countyoffice.org. County Office. Retrieved November 21, 2022.
  3. ^ a b Brumleve, Will (2023-02-15). "400-foot-tall wind turbine discovered leaning east of Paxton". Ford County Chronicle. Retrieved 2023-09-24.
  4. ^ "Fitch Affirms Southern Illinois Power Cooperative's Ratings at 'BBB'; Outlook Stable". Fitch Ratings. New York City. September 22, 2022. Retrieved November 21, 2022.

40°27′27″N 87°59′37″W / 40.45750°N 87.99361°W / 40.45750; -87.99361


pioneer+trail+wind+farm Latitude and Longitude:

40°27′27″N 87°59′37″W / 40.45750°N 87.99361°W / 40.45750; -87.99361
From Wikipedia, the free encyclopedia
Pioneer Trail Wind Farm
CountryUSA
Coordinates 40°27′22.9″N 87°58′42.6″W / 40.456361°N 87.978500°W / 40.456361; -87.978500
StatusActive
Construction began2011
Owner(s)RWE
Operator(s)RWE
Wind farm
TypeOnshore
Hub height400 ft
Power generation
Units operational94 x 1.6 mW
Make and modelGE Renewable Energy
Storage capacity150.4 MW

The Pioneer Trail Wind Farm is a 94-turbine wind farm, established in 2011, in Ford County and Iroquois County in Illinois. [1] The wind farm is headquartered in the Ford County seat of Paxton. [2]

Detail

The Pioneer Trail complex's 94 wind turbines, each rated at 1.6 mW, can generate up to 150.4 megawatts of electricity. The northeastern Illinois project was developed by E.ON Climate Renewables, a subsidiary of E.ON, which merged with RWE in 2019. [1] [3] E.ON has resold some of the power generated by Pioneer Trail to the Southern Illinois Power Cooperative. [4]

The wind farm became operational in October 2011. [3]

References

  1. ^ a b "Pioneer Trail (USA)". thewindpower.net. The Windpower. Retrieved November 21, 2022.
  2. ^ "Pioneer Trail Wind Farm in Paxton, Illinois". countyoffice.org. County Office. Retrieved November 21, 2022.
  3. ^ a b Brumleve, Will (2023-02-15). "400-foot-tall wind turbine discovered leaning east of Paxton". Ford County Chronicle. Retrieved 2023-09-24.
  4. ^ "Fitch Affirms Southern Illinois Power Cooperative's Ratings at 'BBB'; Outlook Stable". Fitch Ratings. New York City. September 22, 2022. Retrieved November 21, 2022.

40°27′27″N 87°59′37″W / 40.45750°N 87.99361°W / 40.45750; -87.99361


Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook