PhotosLocation

From Wikipedia, the free encyclopedia

Phase 3
General information
Coordinates 28°29′37″N 77°05′37″E / 28.493512°N 77.093676°E / 28.493512; 77.093676
Owned byHaryana Mass Rapid Transport Corporation Limited (HMRTC) [1]
Operated by Delhi Metro Rail Corporation (DMRC)
Platforms
Platform-1 → Sector 55–56
Tracks2
Construction
Structure typeElevated
Platform levels2
AccessibleYes Disabled access
Other information
Station codeDL3
History
Opened14 November 2013; 10 years ago (2013-11-14)
Electrified750 V, DC via third rail
Services
Preceding station Rapid Metro Gurgaon Following station
Moulsari Avenue
One-way operation
Line 1 Terminus
Phase 2
Location
Phase 3 is located in Delhi
Phase 3
Phase 3
Location within Delhi
Phase 3 is located in Haryana
Phase 3
Phase 3
Phase 3 (Haryana)
Underconstruction phase 3 metro station.

Phase 3 is a station of the Rapid Metro Gurgaon opened in November 2013. It is owned by Haryana Mass Rapid Transport Corporation Limited (HMRTC) and operated by Delhi Metro Rail Corporation (DMRC). [2] Earlier it was operated by Rapid Metro Gurgaon Limited (RMGL).

Connections

References

  1. ^ "Rapid Metro Gurugram".
  2. ^ "Welcome to Delhi Metro Rail Corporation(DMRC) | Official Website". www.delhimetrorail.com. Retrieved 25 April 2022.


From Wikipedia, the free encyclopedia

Phase 3
General information
Coordinates 28°29′37″N 77°05′37″E / 28.493512°N 77.093676°E / 28.493512; 77.093676
Owned byHaryana Mass Rapid Transport Corporation Limited (HMRTC) [1]
Operated by Delhi Metro Rail Corporation (DMRC)
Platforms
Platform-1 → Sector 55–56
Tracks2
Construction
Structure typeElevated
Platform levels2
AccessibleYes Disabled access
Other information
Station codeDL3
History
Opened14 November 2013; 10 years ago (2013-11-14)
Electrified750 V, DC via third rail
Services
Preceding station Rapid Metro Gurgaon Following station
Moulsari Avenue
One-way operation
Line 1 Terminus
Phase 2
Location
Phase 3 is located in Delhi
Phase 3
Phase 3
Location within Delhi
Phase 3 is located in Haryana
Phase 3
Phase 3
Phase 3 (Haryana)
Underconstruction phase 3 metro station.

Phase 3 is a station of the Rapid Metro Gurgaon opened in November 2013. It is owned by Haryana Mass Rapid Transport Corporation Limited (HMRTC) and operated by Delhi Metro Rail Corporation (DMRC). [2] Earlier it was operated by Rapid Metro Gurgaon Limited (RMGL).

Connections

References

  1. ^ "Rapid Metro Gurugram".
  2. ^ "Welcome to Delhi Metro Rail Corporation(DMRC) | Official Website". www.delhimetrorail.com. Retrieved 25 April 2022.



Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook