From Wikipedia, the free encyclopedia

Patna Monorail
Overview
Locale Patna, Bihar
Transit typestraddle-beam Monorail
Number of lines4 (planned)
Daily ridership32,000 (Estd.)
Operation
Began operationGovernment of Bihar preferred metro rail over mono rail
Train length4 coaches
Technical
System length32 kilometers (20 mi)
Electrification750 V DC
Average speed31 km/h (19 mph)
Top speed80 km/h (50 mph)

Patna Monorail was a proposed monorail system for the city of Patna. [1] [2]

Network

There were 4 lines proposed to be built. RITES, the consultancy arm of Indian Railways had begun soil inspection as well as ground survey for the monorail network. [3] [4]

Project detail

The total estimated cost of the project was 2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna would be 32 km and in the first phase route length between 20 km and 25 km was to be completed. [5]

As of 2021 the project has not commenced.

See also

References

  1. ^ "Mono-Rail for Patna soon". Samaylive.com. 28 December 2010. Retrieved 11 January 2011.
  2. ^ Monorail News Briefs Archived 13 June 2010 at the Wayback Machine
  3. ^ RITES begins ground survey for monorail in Patna - Rediff.com Business
  4. ^ Monorail ground survey tees off - Yahoo! News India
  5. ^ "Capital monorail project shifts gear". The Telegraph. Calcutta, India. 24 December 2011. Archived from the original on 19 September 2012.


From Wikipedia, the free encyclopedia

Patna Monorail
Overview
Locale Patna, Bihar
Transit typestraddle-beam Monorail
Number of lines4 (planned)
Daily ridership32,000 (Estd.)
Operation
Began operationGovernment of Bihar preferred metro rail over mono rail
Train length4 coaches
Technical
System length32 kilometers (20 mi)
Electrification750 V DC
Average speed31 km/h (19 mph)
Top speed80 km/h (50 mph)

Patna Monorail was a proposed monorail system for the city of Patna. [1] [2]

Network

There were 4 lines proposed to be built. RITES, the consultancy arm of Indian Railways had begun soil inspection as well as ground survey for the monorail network. [3] [4]

Project detail

The total estimated cost of the project was 2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna would be 32 km and in the first phase route length between 20 km and 25 km was to be completed. [5]

As of 2021 the project has not commenced.

See also

References

  1. ^ "Mono-Rail for Patna soon". Samaylive.com. 28 December 2010. Retrieved 11 January 2011.
  2. ^ Monorail News Briefs Archived 13 June 2010 at the Wayback Machine
  3. ^ RITES begins ground survey for monorail in Patna - Rediff.com Business
  4. ^ Monorail ground survey tees off - Yahoo! News India
  5. ^ "Capital monorail project shifts gear". The Telegraph. Calcutta, India. 24 December 2011. Archived from the original on 19 September 2012.



Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook