It is
proposed that this article be deleted because of the following concern:
If you can address this concern by improving, copyediting, sourcing, renaming, or merging the page, please edit this page and do so. You may remove this message if you improve the article or otherwise object to deletion for any reason. Although not required, you are encouraged to explain why you object to the deletion, either in your edit summary or on the talk page. If this template is removed, do not replace it. The article may be deleted if this message remains in place for seven days, i.e., after 14:49, 30 July 2024 (UTC). Find sources: "PGGMB Building" – news · newspapers · books · scholar · JSTOR |
![]() | This article has multiple issues. Please help
improve it or discuss these issues on the
talk page. (
Learn how and when to remove these template messages)
|
PGGMB Building Brunei | |
---|---|
![]() PGGMB Building on 19 April 2022 | |
| |
General information | |
Status | Completed |
Type | Office, restaurant, shops |
Location | Bandar Seri Begawan, Brunei |
Coordinates | 4°53′23″N 114°56′37″E / 4.8897519°N 114.9436219°E |
Construction started | 2003 |
Completed | 2004 |
Opening | 2004 |
Cost | ( US$8 million) |
Height | 295 feet (90 m) |
Technical details | |
Lifts/elevators | 28 |
Design and construction | |
Architect(s) | Kohn Pedersen Fox |
Developer | Mori Building Co. |
Structural engineer | Leslie E. Robertson Associates RLLP |
The PGGMB Building was constructed in 2003, is the third tallest building in Brunei after The DST Group Building. The Building was listed as the sixth tallest Building in Borneo just about 295 feet high.
It is
proposed that this article be deleted because of the following concern:
If you can address this concern by improving, copyediting, sourcing, renaming, or merging the page, please edit this page and do so. You may remove this message if you improve the article or otherwise object to deletion for any reason. Although not required, you are encouraged to explain why you object to the deletion, either in your edit summary or on the talk page. If this template is removed, do not replace it. The article may be deleted if this message remains in place for seven days, i.e., after 14:49, 30 July 2024 (UTC). Find sources: "PGGMB Building" – news · newspapers · books · scholar · JSTOR |
![]() | This article has multiple issues. Please help
improve it or discuss these issues on the
talk page. (
Learn how and when to remove these template messages)
|
PGGMB Building Brunei | |
---|---|
![]() PGGMB Building on 19 April 2022 | |
| |
General information | |
Status | Completed |
Type | Office, restaurant, shops |
Location | Bandar Seri Begawan, Brunei |
Coordinates | 4°53′23″N 114°56′37″E / 4.8897519°N 114.9436219°E |
Construction started | 2003 |
Completed | 2004 |
Opening | 2004 |
Cost | ( US$8 million) |
Height | 295 feet (90 m) |
Technical details | |
Lifts/elevators | 28 |
Design and construction | |
Architect(s) | Kohn Pedersen Fox |
Developer | Mori Building Co. |
Structural engineer | Leslie E. Robertson Associates RLLP |
The PGGMB Building was constructed in 2003, is the third tallest building in Brunei after The DST Group Building. The Building was listed as the sixth tallest Building in Borneo just about 295 feet high.