Novo-Admiralteysky Bridge< Ново-Адмиралтейский мост | |
---|---|
Coordinates | 59°55′50″N 30°16′32″E / 59.93056°N 30.27556°E |
Carries | Automobile, foot |
Crosses | Bolshaya Neva |
Locale | Saint Petersburg, Russia |
Characteristics | |
Design | pending |
No. of spans | pending |
History | |
Designer | "Stroyproyekt" Institute |
Construction start | 2010 [1] |
Construction end | 2012 (planned) [1] |
Location | |
|
The Novo-Admiralteysky Bridge ( Russian: Но́во-Адмиралте́йский мост) is the planned bridge over the Bolshaya Neva River in Saint Petersburg, Russia. The bridge left-hand side leans against the New-Admiralty island ( Admiralteysky District). In this place the quay of the Moyka River will be prolonged. The right side of the bridge leans against Vasilyevsky Island ( Vasileostrovsky District). It is quay of Lieutenant Schmidt between 16-17th lines and 18-19th lines of Vasilyevsky Island. [1]
In a project, height of flights will make about 6 metres, width — nearby 36, length — about 600 metres. The prospective total cost of the project will make approximately 7,9 billion rubles. Till 2009-07-15 should be submitted for consideration and the statement to the governor.
Novo-Admiralteysky Bridge< Ново-Адмиралтейский мост | |
---|---|
Coordinates | 59°55′50″N 30°16′32″E / 59.93056°N 30.27556°E |
Carries | Automobile, foot |
Crosses | Bolshaya Neva |
Locale | Saint Petersburg, Russia |
Characteristics | |
Design | pending |
No. of spans | pending |
History | |
Designer | "Stroyproyekt" Institute |
Construction start | 2010 [1] |
Construction end | 2012 (planned) [1] |
Location | |
|
The Novo-Admiralteysky Bridge ( Russian: Но́во-Адмиралте́йский мост) is the planned bridge over the Bolshaya Neva River in Saint Petersburg, Russia. The bridge left-hand side leans against the New-Admiralty island ( Admiralteysky District). In this place the quay of the Moyka River will be prolonged. The right side of the bridge leans against Vasilyevsky Island ( Vasileostrovsky District). It is quay of Lieutenant Schmidt between 16-17th lines and 18-19th lines of Vasilyevsky Island. [1]
In a project, height of flights will make about 6 metres, width — nearby 36, length — about 600 metres. The prospective total cost of the project will make approximately 7,9 billion rubles. Till 2009-07-15 should be submitted for consideration and the statement to the governor.