Nantun 113 南屯 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
General information | |||||||||||
Location |
Nantun,
Taichung Taiwan | ||||||||||
Operated by | |||||||||||
Line(s) | |||||||||||
Platforms | 2 side platforms | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Other information | |||||||||||
Station code | 113 | ||||||||||
History | |||||||||||
Opened | 25 April 2021[1] | ||||||||||
Services | |||||||||||
|
Nantun metro station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese | 南屯站 | ||||||||||
|
Nantun is a metro station on the Green Line operated by Taichung Metro in Nantun District, Taichung, Taiwan. [2]
4F | Crossover Level |
Platforms-connecting Overpass |
3F | ||
Side platform, doors will open on the right | ||
Track 1 | ![]() ![]() | |
Track 2 | ![]() ![]() | |
Side platform, doors will open on the right | ||
Concourse | ||
Lobby, information desk, automatic ticket dispensing machines, one-way faregates | ||
2F | Mezzanine | Transitlink floor for stairs and escalators |
1F | Street Level |
Exit/Entrance |
24°06′16″N 120°38′48″E / 24.1045°N 120.6467°E
Nantun 113 南屯 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
General information | |||||||||||
Location |
Nantun,
Taichung Taiwan | ||||||||||
Operated by | |||||||||||
Line(s) | |||||||||||
Platforms | 2 side platforms | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Other information | |||||||||||
Station code | 113 | ||||||||||
History | |||||||||||
Opened | 25 April 2021[1] | ||||||||||
Services | |||||||||||
|
Nantun metro station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese | 南屯站 | ||||||||||
|
Nantun is a metro station on the Green Line operated by Taichung Metro in Nantun District, Taichung, Taiwan. [2]
4F | Crossover Level |
Platforms-connecting Overpass |
3F | ||
Side platform, doors will open on the right | ||
Track 1 | ![]() ![]() | |
Track 2 | ![]() ![]() | |
Side platform, doors will open on the right | ||
Concourse | ||
Lobby, information desk, automatic ticket dispensing machines, one-way faregates | ||
2F | Mezzanine | Transitlink floor for stairs and escalators |
1F | Street Level |
Exit/Entrance |
24°06′16″N 120°38′48″E / 24.1045°N 120.6467°E