Nagdhunga tunnel ( Nepali: नागढुंगा सुरुङ्ग) is a under-construction highway tunnel connecting Sisnekhola of Dhading district and Nagdhunga in Kathmandu. [1] The tunnel will be a part of Tribhuvan Highway. The tunnel has a height of 8.3m and have a lane of 9.5m wide. The length of the tunnel is 2688 m.
The tunnel passes through bedrocks of Sopyang formation. There are six shear zones in the alignment. [2]
The contractor of the project is Hazama Ando Corporation. The project was scheduled to be finished by April 2023. [3] The cost estimate of the project is about NPR 22 billion. [4]
{{
cite journal}}
: Cite journal requires |journal=
(
help)
Nagdhunga tunnel ( Nepali: नागढुंगा सुरुङ्ग) is a under-construction highway tunnel connecting Sisnekhola of Dhading district and Nagdhunga in Kathmandu. [1] The tunnel will be a part of Tribhuvan Highway. The tunnel has a height of 8.3m and have a lane of 9.5m wide. The length of the tunnel is 2688 m.
The tunnel passes through bedrocks of Sopyang formation. There are six shear zones in the alignment. [2]
The contractor of the project is Hazama Ando Corporation. The project was scheduled to be finished by April 2023. [3] The cost estimate of the project is about NPR 22 billion. [4]
{{
cite journal}}
: Cite journal requires |journal=
(
help)