NTPC Fatehgarh Solar Power Plant
Country India
LocationFatehgarh, Jaisalmer, Rajasthan
Coordinates 27°09′31″N 70°47′10″E / 27.158576°N 70.786122°E / 27.158576; 70.786122
Construction began2019
Commission date2022
Solar farm
Type Flat-panel PV
Power generation
Nameplate capacity296 MW

NTPC Fatehgarh Solar Power Plant is photovoltaic power station in Jaisalmer, India.

History

The 296 MW plant was constructed by state-owned National Thermal Power Corporation. Its first phase was commissioned on 1 January 2022. [1] It became fully operational on 5 August 2022. [2]

NTPC constructed this project as part of the Ministry of New and Renewable Energy’s Central Public Sector Undertaking (CPSU) Scheme Phase II. The project was secured with competitive bidding involving viability gap funding (VGF) during a 2019 auction held by the Solar Energy Corporation of India. [3]

References

  1. ^ "NTPC starts commercial operation at Fatehgarh Solar PV Project". Business Standard. 1 January 2022.
  2. ^ www.ETEnergyworld.com. "NTPC fully commissions 296 MW Fatehgarh solar project - ET EnergyWorld". ETEnergyworld.com. Retrieved 2023-11-16.
  3. ^ says, DBSHINDE (2022-08-05). "NTPC's 296 MW Fatehgarh solar project goes fully online". pv magazine India. Retrieved 2023-11-16.



ntpc+fatehgarh+solar+power+plant Latitude and Longitude:

27°09′31″N 70°47′10″E / 27.158576°N 70.786122°E / 27.158576; 70.786122
From Wikipedia, the free encyclopedia
NTPC Fatehgarh Solar Power Plant
Country India
LocationFatehgarh, Jaisalmer, Rajasthan
Coordinates 27°09′31″N 70°47′10″E / 27.158576°N 70.786122°E / 27.158576; 70.786122
Construction began2019
Commission date2022
Solar farm
Type Flat-panel PV
Power generation
Nameplate capacity296 MW

NTPC Fatehgarh Solar Power Plant is photovoltaic power station in Jaisalmer, India.

History

The 296 MW plant was constructed by state-owned National Thermal Power Corporation. Its first phase was commissioned on 1 January 2022. [1] It became fully operational on 5 August 2022. [2]

NTPC constructed this project as part of the Ministry of New and Renewable Energy’s Central Public Sector Undertaking (CPSU) Scheme Phase II. The project was secured with competitive bidding involving viability gap funding (VGF) during a 2019 auction held by the Solar Energy Corporation of India. [3]

References

  1. ^ "NTPC starts commercial operation at Fatehgarh Solar PV Project". Business Standard. 1 January 2022.
  2. ^ www.ETEnergyworld.com. "NTPC fully commissions 296 MW Fatehgarh solar project - ET EnergyWorld". ETEnergyworld.com. Retrieved 2023-11-16.
  3. ^ says, DBSHINDE (2022-08-05). "NTPC's 296 MW Fatehgarh solar project goes fully online". pv magazine India. Retrieved 2023-11-16.