Mudanjiang–Jiamusi high-speed railway | |
---|---|
Overview | |
Native name | ç‰¡ä½³é«˜é“ |
Status | Operational |
Termini | |
Stations | 7 |
Service | |
Operator(s) | China Railway High-speed |
History | |
Opened | December 6, 2021 [1] |
Technical | |
Line length | 371.6 km (231 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 250 km/h (155 mph) |
The Mudanjiang–Jiamusi high-speed railway, or Mudanjiang–Jiamusi section of Shenyang–Jiamusi high-speed railway, [1] is a high-speed railway line in China. It is 371.6 kilometres (230.9 mi) long and have a maximum speed of 250 kilometres per hour (160 mph). [2] It was opened on December 6, 2021. [1]
Construction on the railway began in November 2016. [2]
The line will have seven stations: [3]
Mudanjiang–Jiamusi high-speed railway | |
---|---|
Overview | |
Native name | ç‰¡ä½³é«˜é“ |
Status | Operational |
Termini | |
Stations | 7 |
Service | |
Operator(s) | China Railway High-speed |
History | |
Opened | December 6, 2021 [1] |
Technical | |
Line length | 371.6 km (231 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 250 km/h (155 mph) |
The Mudanjiang–Jiamusi high-speed railway, or Mudanjiang–Jiamusi section of Shenyang–Jiamusi high-speed railway, [1] is a high-speed railway line in China. It is 371.6 kilometres (230.9 mi) long and have a maximum speed of 250 kilometres per hour (160 mph). [2] It was opened on December 6, 2021. [1]
Construction on the railway began in November 2016. [2]
The line will have seven stations: [3]