Line S5 | |
---|---|
S5 | |
Overview | |
Other name(s) | Nanjing–Yangzhou intercity railway Nanjing–Yizheng–Yangzhou intercity railway |
Status | Under construction |
Locale | Nanjing and Yangzhou, Jiangsu Province |
Termini | |
Stations | 16 |
Service | |
Type | Rapid Transit |
System | Nanjing Metro |
Operator(s) | Nanjing Metro |
Rolling stock | 4-car Type A |
Technical | |
Line length | 57.61 km (35.8 mi) |
Character | Elevated and underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line S5 [1] is a planned rapid transit line connecting Nanjing and Yangzhou. It will be 57.61 kilometres (35.80 mi) long and have a maximum operating speed of 160 kilometres per hour (99 mph). [2] Initially 4 car Type A trains will be used but the line is designed for expansion to 6 car trains in the future. The line will have passing loops at select stations allowing for express and local services to be offered. [3] [4] Local services are expected to take 45 minutes to run end to end and express services will shorten end to end travel times to 34 minutes. [2] Construction started on December 28, 2021. [5] The line is planned to open in 2026. [2]
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Xianlinhu | 仙林湖 | 4 2 | Qixia, Nanjing | |||
Sheshan | 摄山 | 6 | ||||
Jiangcheng | 江乘 | |||||
Longtan | 龙潭 | |||||
Longtanxincheng | 龙潭新城 | |||||
Huayuanyingfang | 花园营防 | |||||
Jing'an | 靖安 | Ningzhen ICR | ||||
Huangtiandang | 黄天荡 | |||||
Wannianlu | 万年路 | Yizheng | Yangzhou | |||
Gongnonglu | 工农路 | |||||
Tianningdadao | 天宁大道 | |||||
Yizhengkaifaqu | 仪征开发区 | |||||
Puxi | 朴席 | |||||
Chahe | 汊河 | Hanjiang | ||||
Zhannanlu | 站南路 | |||||
Yangzhou West Railway Station | 扬州西站 |
![]() |
||||
Line S5 | |
---|---|
S5 | |
Overview | |
Other name(s) | Nanjing–Yangzhou intercity railway Nanjing–Yizheng–Yangzhou intercity railway |
Status | Under construction |
Locale | Nanjing and Yangzhou, Jiangsu Province |
Termini | |
Stations | 16 |
Service | |
Type | Rapid Transit |
System | Nanjing Metro |
Operator(s) | Nanjing Metro |
Rolling stock | 4-car Type A |
Technical | |
Line length | 57.61 km (35.8 mi) |
Character | Elevated and underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line S5 [1] is a planned rapid transit line connecting Nanjing and Yangzhou. It will be 57.61 kilometres (35.80 mi) long and have a maximum operating speed of 160 kilometres per hour (99 mph). [2] Initially 4 car Type A trains will be used but the line is designed for expansion to 6 car trains in the future. The line will have passing loops at select stations allowing for express and local services to be offered. [3] [4] Local services are expected to take 45 minutes to run end to end and express services will shorten end to end travel times to 34 minutes. [2] Construction started on December 28, 2021. [5] The line is planned to open in 2026. [2]
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Xianlinhu | 仙林湖 | 4 2 | Qixia, Nanjing | |||
Sheshan | 摄山 | 6 | ||||
Jiangcheng | 江乘 | |||||
Longtan | 龙潭 | |||||
Longtanxincheng | 龙潭新城 | |||||
Huayuanyingfang | 花园营防 | |||||
Jing'an | 靖安 | Ningzhen ICR | ||||
Huangtiandang | 黄天荡 | |||||
Wannianlu | 万年路 | Yizheng | Yangzhou | |||
Gongnonglu | 工农路 | |||||
Tianningdadao | 天宁大道 | |||||
Yizhengkaifaqu | 仪征开发区 | |||||
Puxi | 朴席 | |||||
Chahe | 汊河 | Hanjiang | ||||
Zhannanlu | 站南路 | |||||
Yangzhou West Railway Station | 扬州西站 |
![]() |
||||