From Wikipedia, the free encyclopedia
Line 3
  3 
Qingxiushan station
Overview
StatusOperational
Owner Nanning
Locale Nanning, Guangxi, China
Termini
Stations23
Service
Type Rapid transit
System Nanning Metro
Services1
Operator(s) Nanning Rail Transit Corporation
Rolling stock6-car Type B
History
OpenedJune 6, 2019; 4 years ago (2019-06-06)
Technical
Line length27.9 km (17.34 mi) [1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Line 3
Chinese name
Simplified Chinese南宁地铁3号线
Traditional Chinese南寧地鐵3號線
Zhuang name
ZhuangNanzningz Didez 3 Hauhsienq
Line 3 train LCD

Line 3 of the Nanning Metro is a rapid transit line in Nanning. The line opened on 6 June 2019. The line is 27.9 km long with 23 stations.

Opening timeline

Segment Commencement Length Station(s) Name
Keyuan Dadao — Pingliang Overpass 6 June 2019 27.9 km (17.34 mi) [1] 22
Donggouling 10 September 2020 [2] Infill station 1

Stations

Station name Transfer Distance
km
Location
English Chinese Zhuang
Keyuan Dadao 科园大道 Daihloh Gohyenz Xixiangtang
Chuangye Lu 创业路 Roen Cangyez
Anji Coach Station 安吉客运站 Camh Yinhhek Anhgiz   2 
Beihubei Lu 北湖北路 Roen Baek Bwzhuz
Xiufeng Lu 秀峰路 Roen Siufungh
Yongwu Lu 邕武路 Roen Yunghvuj Xixiangtang / Xingning
Dajicun 大鸡村 Dagihcunh Xingning
Xinggui Lu 兴桂路 Roen Hinghgvei
Xiaojicun 小鸡村 Siujgihcunh   5 
Donggouling 东沟岭 Dungruhlingj
Changgang Lu 长堽路 Roen Cangzgangh
Dongge Lu 东葛路 Roen Dunghgoz Qingxiu
Binhu Lu 滨湖路 Roen Binhhuz
Jinhu Square 金湖广场 Ginhhuz Gvangjcangz   1 
Langxi 埌西 Langsih
Qingzhu Overpass 青竹立交 Cinghcuz Lizgyauh
Qingxiushan 青秀山 Cinghsiusanh
Nanning Museum 市博物馆 Si Bozvuzgvanj Liangqing
Advanced Business Park 总部基地 Cungjbu Gihdi   4 
Guangxi Planning Exhibition Hall 广西规划馆 Gvangjsih Gveihva’gvanj
Qingge Lu 庆歌路 Roen Ginggoh
Wuxianghu 五象湖 Vujsienghuz
Pingliang Overpass 平良立交 Bingzliengz Lizgyauh   2 

References

  1. ^ a b "南宁地铁3号线6月6日开通试运营!看站点、换乘、票价". 2019-06-03.
  2. ^ "9月10日起,南宁地铁3号线东沟岭站正式开通运营". 2020-09-09.
From Wikipedia, the free encyclopedia
Line 3
  3 
Qingxiushan station
Overview
StatusOperational
Owner Nanning
Locale Nanning, Guangxi, China
Termini
Stations23
Service
Type Rapid transit
System Nanning Metro
Services1
Operator(s) Nanning Rail Transit Corporation
Rolling stock6-car Type B
History
OpenedJune 6, 2019; 4 years ago (2019-06-06)
Technical
Line length27.9 km (17.34 mi) [1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Line 3
Chinese name
Simplified Chinese南宁地铁3号线
Traditional Chinese南寧地鐵3號線
Zhuang name
ZhuangNanzningz Didez 3 Hauhsienq
Line 3 train LCD

Line 3 of the Nanning Metro is a rapid transit line in Nanning. The line opened on 6 June 2019. The line is 27.9 km long with 23 stations.

Opening timeline

Segment Commencement Length Station(s) Name
Keyuan Dadao — Pingliang Overpass 6 June 2019 27.9 km (17.34 mi) [1] 22
Donggouling 10 September 2020 [2] Infill station 1

Stations

Station name Transfer Distance
km
Location
English Chinese Zhuang
Keyuan Dadao 科园大道 Daihloh Gohyenz Xixiangtang
Chuangye Lu 创业路 Roen Cangyez
Anji Coach Station 安吉客运站 Camh Yinhhek Anhgiz   2 
Beihubei Lu 北湖北路 Roen Baek Bwzhuz
Xiufeng Lu 秀峰路 Roen Siufungh
Yongwu Lu 邕武路 Roen Yunghvuj Xixiangtang / Xingning
Dajicun 大鸡村 Dagihcunh Xingning
Xinggui Lu 兴桂路 Roen Hinghgvei
Xiaojicun 小鸡村 Siujgihcunh   5 
Donggouling 东沟岭 Dungruhlingj
Changgang Lu 长堽路 Roen Cangzgangh
Dongge Lu 东葛路 Roen Dunghgoz Qingxiu
Binhu Lu 滨湖路 Roen Binhhuz
Jinhu Square 金湖广场 Ginhhuz Gvangjcangz   1 
Langxi 埌西 Langsih
Qingzhu Overpass 青竹立交 Cinghcuz Lizgyauh
Qingxiushan 青秀山 Cinghsiusanh
Nanning Museum 市博物馆 Si Bozvuzgvanj Liangqing
Advanced Business Park 总部基地 Cungjbu Gihdi   4 
Guangxi Planning Exhibition Hall 广西规划馆 Gvangjsih Gveihva’gvanj
Qingge Lu 庆歌路 Roen Ginggoh
Wuxianghu 五象湖 Vujsienghuz
Pingliang Overpass 平良立交 Bingzliengz Lizgyauh   2 

References

  1. ^ a b "南宁地铁3号线6月6日开通试运营!看站点、换乘、票价". 2019-06-03.
  2. ^ "9月10日起,南宁地铁3号线东沟岭站正式开通运营". 2020-09-09.

Videos

Youtube | Vimeo | Bing

Websites

Google | Yahoo | Bing

Encyclopedia

Google | Yahoo | Bing

Facebook