Chengdu Metro Line 30 | |
---|---|
30 | |
Overview | |
Status | Construction |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | |
Stations | 24 [2] |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Gaobeiba Depot (高碑坝车辆段) Hongjiaqiao Depot (洪家桥停车场) |
History | |
Planned opening | 2024 |
Technical | |
Line length | 27.74 km (17.2 mi) [2] |
Number of tracks | 2 |
Character | underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | overhead lines, 1,500 V DC |
Operating speed | 80km/h |
Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East [1] to Longquan Railway Station. [2] Phase 1 is 27.74 km long with 24 stations, all underground. [2] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. [3] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao. [3]
Station name | Transfer | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Terminal 2 of Shuangliu International Airport East [1] | 双流机场2航站楼东 | 19 | 0.00 | 0.00 | Shuangliu |
Sisheng | 寺圣 | 2.09 | 2.09 | ||
Xingyue | 星月 | 0.81 | 2.90 | ||
Guangming | 光明 | 0.92 | 3.82 | ||
Xiejiadu | 谢家渡 | 1.31 | 4.13 | ||
Zhujiang Road | 珠江路 | 8 | 0.66 | 5.79 | |
Datong | 大同 | 1.34 | 7.13 | ||
Shiyang East [1] | 石羊东 | 1.99 | 9.12 | High-Tech Zone | |
Xinyuan Avenue | 新园大道 | 0.87 | 9.99 | ||
Chengdu First People's Hospital | 市一医院 | 5 | 1.15 | 11.14 | |
Yizhou Avenue | 益州大道 | 0.84 | 11.98 | ||
Financial City North | 金融城北 | 0.86 | 12.84 | ||
Fuchengqiao | 府城桥 | 0.61 | 13.44 | ||
Jinshi Road | 金石路 | 6 | 1.25 | 14.69 | Jinjiang |
Juanzishu | 棬子树 | 1.59 | 16.28 | ||
Jinyi | 锦逸 | 0.99 | 17.27 | ||
Jiaozi Flyover | 娇子立交 | 1.70 | 18.97 | ||
Haitong Street | 海桐街 | 0.90 | 19.87 | ||
Hangtian Flyover | 航天立交 | 1.01 | 20.87 | ||
Huiwangling | 惠王陵 | 2 | 1.07 | 21.94 | Longquanyi |
Yushi | 玉石 | 1.37 | 23.31 | ||
Fenshui | 分水 | 1.09 | 24.40 | ||
Yuhong Road [1] | 玉虹路 | ||||
Longquan Railway Station | 龙泉 | ||||
30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线
Chengdu Metro Line 30 | |
---|---|
30 | |
Overview | |
Status | Construction |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | |
Stations | 24 [2] |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Gaobeiba Depot (高碑坝车辆段) Hongjiaqiao Depot (洪家桥停车场) |
History | |
Planned opening | 2024 |
Technical | |
Line length | 27.74 km (17.2 mi) [2] |
Number of tracks | 2 |
Character | underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | overhead lines, 1,500 V DC |
Operating speed | 80km/h |
Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East [1] to Longquan Railway Station. [2] Phase 1 is 27.74 km long with 24 stations, all underground. [2] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. [3] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao. [3]
Station name | Transfer | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Terminal 2 of Shuangliu International Airport East [1] | 双流机场2航站楼东 | 19 | 0.00 | 0.00 | Shuangliu |
Sisheng | 寺圣 | 2.09 | 2.09 | ||
Xingyue | 星月 | 0.81 | 2.90 | ||
Guangming | 光明 | 0.92 | 3.82 | ||
Xiejiadu | 谢家渡 | 1.31 | 4.13 | ||
Zhujiang Road | 珠江路 | 8 | 0.66 | 5.79 | |
Datong | 大同 | 1.34 | 7.13 | ||
Shiyang East [1] | 石羊东 | 1.99 | 9.12 | High-Tech Zone | |
Xinyuan Avenue | 新园大道 | 0.87 | 9.99 | ||
Chengdu First People's Hospital | 市一医院 | 5 | 1.15 | 11.14 | |
Yizhou Avenue | 益州大道 | 0.84 | 11.98 | ||
Financial City North | 金融城北 | 0.86 | 12.84 | ||
Fuchengqiao | 府城桥 | 0.61 | 13.44 | ||
Jinshi Road | 金石路 | 6 | 1.25 | 14.69 | Jinjiang |
Juanzishu | 棬子树 | 1.59 | 16.28 | ||
Jinyi | 锦逸 | 0.99 | 17.27 | ||
Jiaozi Flyover | 娇子立交 | 1.70 | 18.97 | ||
Haitong Street | 海桐街 | 0.90 | 19.87 | ||
Hangtian Flyover | 航天立交 | 1.01 | 20.87 | ||
Huiwangling | 惠王陵 | 2 | 1.07 | 21.94 | Longquanyi |
Yushi | 玉石 | 1.37 | 23.31 | ||
Fenshui | 分水 | 1.09 | 24.40 | ||
Yuhong Road [1] | 玉虹路 | ||||
Longquan Railway Station | 龙泉 | ||||
30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线