Line 2 | |
---|---|
2 | |
Overview | |
Status | Operational |
Locale | Shaoxing, Zhejiang, China |
Termini | |
Stations | 9 |
Service | |
Type | Rapid transit |
System | Shaoxing Metro |
Operator(s) | Shaoxing Metro Corporation |
Rolling stock | 4-car Type B |
History | |
Opened | 26 July 2023 |
Technical | |
Line length | 10.55 km (6.56 mi) |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Line 2 of Shaoxing Metro ( Chinese: 绍兴轨道交通2号线) is a metro line in Shaoxing, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations. [1]
Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan. [2] Construction started on 1 March 2020, and it was officially opened for operation on 26 July 2023. [3] [4] The line uses B-type trains, with 4-car trains initially and mixed operations of 4 and 6-car trains in the long term. [5]
Segment | Commencement | Length | Station(s) |
---|---|---|---|
Jinghu Hospital — Tandu | 26 July 2023 | 10.55 km (6.56 mi) | 9 |
Station Name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
People's Hospital [note 1] | 人民医院总院 | Yuecheng | |||
Meishan Square | 梅山广场 | 1 | |||
Houshu Road | 后墅路 | ||||
Paogu | 袍谷 | ||||
Paozhong Road | 袍中路 | ||||
Yangjinghu | 洋泾湖 | ||||
Xunnan | 恂南 | 3 | |||
Doujiang | 豆姜 | ||||
Tandu | 檀渎 | ||||
Line 2 | |
---|---|
2 | |
Overview | |
Status | Operational |
Locale | Shaoxing, Zhejiang, China |
Termini | |
Stations | 9 |
Service | |
Type | Rapid transit |
System | Shaoxing Metro |
Operator(s) | Shaoxing Metro Corporation |
Rolling stock | 4-car Type B |
History | |
Opened | 26 July 2023 |
Technical | |
Line length | 10.55 km (6.56 mi) |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 100 km/h (62 mph) |
Line 2 of Shaoxing Metro ( Chinese: 绍兴轨道交通2号线) is a metro line in Shaoxing, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations. [1]
Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan. [2] Construction started on 1 March 2020, and it was officially opened for operation on 26 July 2023. [3] [4] The line uses B-type trains, with 4-car trains initially and mixed operations of 4 and 6-car trains in the long term. [5]
Segment | Commencement | Length | Station(s) |
---|---|---|---|
Jinghu Hospital — Tandu | 26 July 2023 | 10.55 km (6.56 mi) | 9 |
Station Name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
People's Hospital [note 1] | 人民医院总院 | Yuecheng | |||
Meishan Square | 梅山广场 | 1 | |||
Houshu Road | 后墅路 | ||||
Paogu | 袍谷 | ||||
Paozhong Road | 袍中路 | ||||
Yangjinghu | 洋泾湖 | ||||
Xunnan | 恂南 | 3 | |||
Doujiang | 豆姜 | ||||
Tandu | 檀渎 | ||||